Advertisement

Dredging

about 1 year ago

Tampa Harbor dredging project successfully finished

The Tampa Harbor Maintenance Dredging 34-Foot Project, Upper Channels was a 270-day initiative in Hillsborough County, Florida. The work involved dredging channels to a 34-foot depth, with meticulous material disposal and rigorous environmental monitoring. Dredged material was removed, transported b

1 minutes read
Tampa Harbor dredging project successfully finished
Photo courtesy of Orion

Share this article

The Tampa Harbor Maintenance Dredging 34-Foot Project, Upper Channels was a 270-day initiative in Hillsborough County, Florida.

The work involved dredging channels to a 34-foot depth, with meticulous material disposal and rigorous environmental monitoring.

Dredged material was removed, transported by barge, and offloaded to the Dredge Material Placement Facility (DMPF) 3-D, located approximately 4 nautical miles south from Port Sutton Entrance Channel.

Overcoming the challenges of working with third parties for access to their dredge areas, active airport adjacency, and rocks/debris within the dredge area, Orion (formerly Orion Marine Group) showcased their expertise in channel excavation and seamless project execution.

PROJECT HIGHLIGHTS

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.