Advertisement

Beach Nourishment

about 1 year ago

Palm Beach dredging/beachfill project starting in mid-February

The Town of Palm Beach (FL), partnering with the U.S. Army Corps of Engineers, will this month begin work on a sand placement project on the island’s north end. This stage of the Town’s overall Coastal Management Plan includes dredging operations in Palm Beach Harbor. The project will dredge around

1 minutes read
Palm Beach dredging/beachfill project starting in mid-February
Photo courtesy of USACE

Share this article

The Town of Palm Beach (FL), partnering with the U.S. Army Corps of Engineers, will this month begin work on a sand placement project on the island’s north end.

This stage of the Town’s overall Coastal Management Plan includes dredging operations in Palm Beach Harbor. The project will dredge around 251,000 cubic yards of material from the harbor’s entrance channel and settling basins.

The dredged material will eventually be placed along the Town of Palm Beach shoreline between Lake Worth Inlet and Kenlyn Road in Reaches 1 and 2, enhancing the area’s coastal resilience and replenishing the beach.

Weeks Marine, Inc. has been awarded the dredging contract. Once underway in mid-February, dredging operations are anticipated to take up to five weeks to complete.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.