DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Dredging›USACE gathering information for the Gulf Intracoastal Waterway dredging
Dredging

April 15, 2025 · about 1 year ago

USACE gathering information for the Gulf Intracoastal Waterway dredging

The U.S. Army Corps of Engineers, Jacksonville District is beginning preparation of a National Environmental Policy Act (NEPA) document to address maintenance dredging of the Gulf Intracoastal Waterway (GIWW) in Manatee County, Florida. The GIWW Project from the Caloosahatchee River to the Anclote R

1 minutes read
  • LinkedIn
  • X
  • Email
USACE gathering information for the Gulf Intracoastal Waterway dredging
Photo courtesy of USACE

Share this article

The U.S. Army Corps of Engineers, Jacksonville District is beginning preparation of a National Environmental Policy Act (NEPA) document to address maintenance dredging of the Gulf Intracoastal Waterway (GIWW) in Manatee County, Florida.

The GIWW Project from the Caloosahatchee River to the Anclote River was originally authorized by Chapter 19 of the River and Harbors Act of 1945 (PL 79-14) in accordance with House Document Number 371, 76th Congress.

Congressional authorization directed the Corps to construct and maintain the GIWW channel to a depth of nine feet plus two feet of over depth Mean Lower Low Water (MLLW). \

The purpose of the project is to provide safe navigation within the federal channel through the removal of shoaling (i.e., accumulated sediments in the channel) to maintain the authorized depth.

The NEPA analysis will evaluate maintenance dredging Cuts M-4, M-5, M-12, M- 13, and M-14 within the GIWW channel between Tampa Bay and Sarasota Bay.

Analyses will also consider proposed placement of the dredged material in existing sites, such as Egmont Key nearshore placement area as well as other potential beneficial use of dredged material opportunities, such as placement in an existing dredge hole adjacent to the channel, near Cut M-5 and Long Pass Inlet which could promote the re-establishment of seagrass.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Anaklia dredging project accelerates with two Jan De Nul TSHDs in the area
  2. 2VIDEO: Damen TSHD Kapuka gears up for sea trials
  3. 3Spotlight on Tuvalu Coastal Adaptation Project in Funafuti
  4. 4USACE starts feasibility study for Cooper River deepening

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free