DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Beach Nourishment›New sand arrives onto Sunshine Coast beaches
Beach Nourishment

April 30, 2026 · about 4 months ago

New sand arrives onto Sunshine Coast beaches

From May to September, around 100,000 cubic meters of sand will be pumped onto the stretch between the Cotton Tree groynes and the Alexandra Headland seawall as part a vital renourishment program, Sunshine Coast Council said. Sunshine Coast Council Principal Coastal Engineer, Georgia Keeshan, said t

1 minutes read
  • LinkedIn
  • X
  • Email
New sand arrives onto Sunshine Coast beaches
photo courtesy of sunshinecoast.qld.gov.au

From May to September, around 100,000 cubic meters of sand will be pumped onto the stretch between the Cotton Tree groynes and the Alexandra Headland seawall as part a vital renourishment program, Sunshine Coast Council said.

Sunshine Coast Council Principal Coastal Engineer, Georgia Keeshan , said taht the renourishment program had been in place since 2013, returning sand lost from the beach during weather events.

“ Every two years, we gather sand from the lower Maroochy River using a dredge and an existing pipeline, then booster pumps help move it back along the beach ,” Ms Keeshan said.

“Our coastal modelling shows that Maroochydore Beach is particularly prone to storm erosion and often loses more sand than is returned during storms.”

To ensure the full volume of sand is returned to the beach, the Council has applied for a permit to extend its program into October if needed and enable sand to be sourced from a slightly wider area of the river.

The new sand will be pumped onto the beach from the lower Maroochy River using a small cutter suction dredger (CSD).

Works will take place along the shoreline between beach access points 143 (Cotton Tree) and 156 (Alex Skate Park).

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Beach NourishmentDredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free