DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Dredging›EXCLUSIVE: Van Oord’s TSHD Utrecht arrives at Port of Itajaí
Dredging

June 1, 2026 · about 4 months ago

EXCLUSIVE: Van Oord’s TSHD Utrecht arrives at Port of Itajaí

The Port of Itajaí said that Van Oord’s trailing suction hopper dredger (TSHD) Utrecht arrived in the area on May 28. The dredger will be used to dredge the port’s access channel and restore optimal navigation conditions. According to the Port, the TSHD arrived after authorities identified a reducti

1 minutes read
  • LinkedIn
  • X
  • Email
EXCLUSIVE: Van Oord’s TSHD Utrecht arrives at Port of Itajaí
photo courtesy of portoitajai.com.br

The Port of Itajaí said that Van Oord’s trailing suction hopper dredger (TSHD) Utrecht arrived in the area on May 28. The dredger will be used to dredge the port’s access channel and restore optimal navigation conditions.

According to the Port, the TSHD arrived after authorities identified a reduction in the channel’s draft, a situation that has been causing maneuvering restrictions, logistical delays and higher operating costs. The reduction was confirmed through updated bathymetric surveys conducted by Hidrotop.

The Port of Itajaí Administration said that port operations continued normally during the monitoring period. The largest cargo vessel handled during this time operated with a draft of 12.8 meters, remaining within the safety limits established by technical teams, pilots, and maritime authorities.

Dredging work will be undertaken with continuous monitoring of the access channel, turning basins and berths.

The Port officials said that normal conditions will be restored within 60 days or less.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Dredging

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: New TSHD takes shape in Poland
  2. 2Dublin Port capital dredging campaign nears end
  3. 3Stanley Harbor dredging begins
  4. 4Dredging underway at Port Wakefield Tidal Pool

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free