Advertisement

Capital Dredging

about 1 month ago

Port of Natal wraps up first phase of dredging program

EG

Eldin Ganic

Dredging Today

1 minutes read
photo courtesy of Portal da Copa
photo courtesy of Portal da Copa

The Port of Natal in Rio Grande do Norte, Brazil, has completed the first phase of the dredging operations on its access channel through the Potengi River and is now awaiting an environmental permit to begin the next stage.

The dredging program, completed in August, removed around 1.2 million cubic meters of sediment and increased the channel depth from 10.5 meters to 12.5 meters, local media reports.

Commenting the news, Paulo Sidney Gomes Silva, technical and commercial director at Rio Grande do Norte state dock company Codern, said: “Previously, at the depth we had, we could receive vessels up to 202 meters long with a beam of 30 meters. With this maintenance dredging, we have increased that to 232 meters in length and a beam of 35 to 40 meters. That expands the possibility of new vessels calling at the Port of Natal.”

Following the sediment removal works, the inspection team is now checking the leveling of the areas covered by the project.

The previous maintenance dredging campaign on the channel was carried out in 2009.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.