Americas
Port Freeport, Panama Canal Extend Partnership
Port Freeport Commissioners agreed to amend and extend the Memorandum of Understanding with the Panama Canal Authority. Last year, both parties signed the MOU as a joint effort to help promote business between the Canal and Port Freeport for one year. With this renewal, their efforts will be extende
VSC Issues Opinions on Law of Beach Replenishment (USA)
The Virginia Supreme Court issued opinions affecting Virginia local government law, and evidently, the City of Virginia Beach and the law of beach replenishment. In a city’s suit to condemn certain easements in connection with a beach replenishment project, while alternatively claiming ownership of
USA: Folly Beach Post-Sandy Assessment Complete
Upon completion of a post-storm assessment after the effects of Superstorm Sandy, the Charleston District has determined that the estimated sand loss to the federal project at Folly Beach is approximately 75,000-100,000 cubic yards. In order to restore Folly Beach to pre-Sandy conditions, the Distri
USA: Ecology Begins Review of Woodway’s Shoreline Program
The Washington Department of Ecology (Ecology) is seeking public comment on Woodway’s recently updated shoreline master program. The proposed update will guide construction and development in the town’s 1.5 miles of stream and Puget Sound shoreline. It also includes a half-mile of marine shoreline a
USA: GLDD Posts 2012 Third Quarter Results
Great Lakes Dredge & Dock Corporation, the largest provider of dredging services in the United States and a major provider of commercial and industrial demolition and remediation services, today reported financial results for the quarter and nine months ended September 30, 2012. Chief Executive Offi
USA: Port of New Orleans on Right Track
The Port of New Orleans set records for container traffic and cruise passengers in 2012 – all while completing more than $100 million in new infrastructure projects port-wide. Port of New Orleans President and CEO Gary LaGrange touted those achievements during the 26th Annual State of the Port Addre
Winooski River Dredging Underway (USA)
The Vermont Fish & Wildlife Department has closed its fishing access area off Windemere Way in Colchester near the mouth of the Winooski River in order to remove heavy deposits of silt at the boat ramp. Normal siltation, plus deposits left last year by Irene, made it difficult to launch boats during
Goltens Overhauls Dredger “Leonardo Da Vinci” (Oman)
Goltens has just overhauled three engines from one of the world’s most powerful dredgers, the Leonardo Da Vinci. This Jan de Nul’s dredger, with over 20,000 KW installed diesel power, required a full overhaul and reconditioning of vessels 3 main engines after more than 24,000 running hours. Timeline
USA: Redfish Point Dredging Starts
Lee County has started a dredging project around Redfish Point and the Normandy Canal at the Yacht Club Community Park area. A “spoil staging area” has been established to deposit the dredge material from the operation. The project will remove a foot of fill and lower the depths of the channels to 6
USA: Dredging Plan for Morehead City Harbor Introduced
The U.S. Army Corps of Engineers, Wilmington District requires a contract to provide Maintenance Dredging Morehead City Harbor Inner Ocean Bar Range A and Cutoff, Carteret County NC. The work consists of maintenance dredging of the Morehead City Harbor Range A and Cutoff. The work will consist of re
EPA Re-Schedules Meetings for Grasse River Dredging (USA)
The EPA meetings for the proposed Grasse River cleanup have been rescheduled. The meetings scheduled for 7:00 pm to 9:00 pm are where public comment will be received. Wednesday, November 14, 2012 1:00 p.m.-3:00 p.m. at the Massena Town Hall (Room 30) 7:00 p.m.-9:00 p.m. at Massena Central High Schoo
USA: GPA Gets Approval for Savannah Harbour Dredging
The Georgia Ports Authority (GPA) has received final approval for its harbour deepening, which will allow the Port of Savannah to more efficiently serve Post-Panamax vessels and lower shipping costs for containerised trade by $213 million a year. Assistant Secretary of the U.S. Army (Civil Works) Jo