Americas

Landfill is ready to store dangerous chemicals to be removed from the Twelve Mile River (USA)
News

Landfill is ready to store dangerous chemicals to be removed from the Twelve Mile River (USA)

CATEECHEE, S.C. (AP) – A landfill is ready to store dangerous chemicals to be removed from a South Carolina river that feeds into Lake Hartwell, but some local residents are worried about the project… [mappress] Source:wmbfnews,February 16,2010;

about 17 years ago
USA: independent experts sorting out reports by EPA and GE on Hudson River dredging
Project & Tenders

USA: independent experts sorting out reports by EPA and GE on Hudson River dredging

ALBANY — A panel of independent experts this week will begin sorting out two massive technical reports on the first year of PCB dredging from the Hudson River to offer a possible road map for the project’s future. [mappress] Source: Times Union, February 16, 2010

about 17 years ago
USA: sandy makeover in $12.4 million project to widen Indialantic and Melbourne Beach
Project & Tenders

USA: sandy makeover in $12.4 million project to widen Indialantic and Melbourne Beach

INDIALANTIC — An Illinois dredging company began to deliver the first new sand over the weekend in a $12.4 million project to widen Indialantic and Melbourne Beach… [mappress] Source:floridatoday,February 15,2010

about 17 years ago
Studying feasibility of deep water harbour (Guyana)
News

Studying feasibility of deep water harbour (Guyana)

GEORGETOWN, Guyana (GINA) — Guyana over the years has been capitalising on its natural resources to maximize its growth and development. As such the Government of Guyana in collaboration with the Government of India has undertaken a feasibility study to determine a possible location for the construc

about 17 years ago
USA: Crews Dredge Rio Grande To Keep it Flowing
News

USA: Crews Dredge Rio Grande To Keep it Flowing

RATTLESNAKE POINT — Without Jason Thibodaux’s help, the Rio Grande would have a hard time making it past this sediment-choked desert flood plain. [mappress] Source: Albuquerque Journal, February 14, 2010

about 17 years ago
USACE launches 500,000 cy Maintenance Dredging Tender for Bayou Freshwater
Project & Tenders

USACE launches 500,000 cy Maintenance Dredging Tender for Bayou Freshwater

US Amry Corps of engineers has launched a dredging tender to maintain Bayou Freshwater. [mappress] More info: fbo.gov;

about 17 years ago
FL,USA: Emerald Isle gains new beachfront from Atlantic Intracoastal Waterway deepening project
Project & Tenders

FL,USA: Emerald Isle gains new beachfront from Atlantic Intracoastal Waterway deepening project

While the U.S. Army Corps of Engineers dredged the Atlantic Intracoastal Waterway, the Point at Emerald Isle gained beachfront. [mappress] Sourcecarolinacoastonline:,February 12,2010

about 17 years ago
U.S. Court of Appeals: contractors who dredged the Mississippi River Gulf Outlet are not liable for damages caused by Hurricane Katrina
News

U.S. Court of Appeals: contractors who dredged the Mississippi River Gulf Outlet are not liable for damages caused by Hurricane Katrina

In good news for contractors nationwide, the 5th Circuit U.S. Court of Appeals recently ruled that the contractors who dredged the Mississippi River Gulf Outlet (MRGO) are not liable for damages caused by Hurricane Katrina (Ackerson et al. v. Bean Dredging LLC et al.). [mappress] Source:blr,February

about 17 years ago
The Netherlands: CT Systems unveils the all new Viking Dredge software
Equipment

The Netherlands: CT Systems unveils the all new Viking Dredge software

The Netherlands — CT Systems unveils the all new Viking Dredge software. Viking Dredge is specifically designed for use on a wide range of dredging vessels, ranging from a small cutter dredger to a large seagoing hopper dredger… [mappress] Source: GIS User, February 12, 2010

about 17 years ago
U.S. Army Corps of Engineers says: it would be last at least three years before the Montauk Harbor Inlet gets thorough dredging
Project & Tenders

U.S. Army Corps of Engineers says: it would be last at least three years before the Montauk Harbor Inlet gets thorough dredging

Larry Penny, East Hampton’s director of natural resources, said on Tuesday that he was shocked during a Jan. 29 meeting when representatives of the U.S. Army Corps of Engineers said it would be at least three years before the Montauk Harbor Inlet and a portion of the harbor itself got the thorough d

about 17 years ago
5.2 million cubic meters of sand complete the restoration of Cancun beaches (Mexico)
Project & Tenders

5.2 million cubic meters of sand complete the restoration of Cancun beaches (Mexico)

CANCUN, Mexico – The depositing of 5.2 million cubic meters (178.5 million cubic feet) of sand to restore Mexico’s Caribbean beaches has been completed, officials of the trust in charge of the project said. [mappress] Source: The Latin American Herald Tribune, February 10, 2010;

about 17 years ago
Panama Canal Expansion: the ultimate winner will be China
Project & Tenders

Panama Canal Expansion: the ultimate winner will be China

This week workmen in Panama will start to dig a hole partfunded by Japan, aided by Latin American cash and big enough to hold the world’s biggest Danish-owned, South Koreanbuilt megaships. The ultimate winner, though, will be China. [mappress] Source: The Press, February 10, 2010

about 17 years ago