Americas

Signing of the New Haven Harbor Navigation Improvement Project Report
Lt. Gen. Todd T. Semonite, USACE Commanding General and 54th U.S. Army Chief of Engineers, has signed the New Haven Harbor Navigation Improvement Project Chief’s Report. The existing New Haven Harbor deep draft ship channel, turning basin, and maneuvering area are currently authorized at a depth of

Contract Awarded for the Rio de La Plata Project
The U.S. Army Corps of Engineers awarded a $9.47 million Articulated Concrete Block Mat and Toe Key contract, May 12, to Construcciones José Carro S.E., headquartered in Ponce, Puerto Rico. This contract is part of a phased approach to flood risk management actions being constructed as part of the R

Congressman Higgins Pens Request for I-10 Bridge and Dredge Funding
Louisiana Congressman Clay Higgins sent a letter to President Trump and congressional appropriators yesterday, urging them to prioritize Southwest Louisiana’s infrastructure needs and funding for a new I-10 Calcasieu River Bridge. The letter reads, in part, “While our region is the fastest growing i

Dredge Currituck Completes Ocean City Inlet Dredging
The U.S. Army Corps of Engineers’ hopper dredge Currituck just completed maintenance dredging work in Ocean City Inlet in Maryland to remove built up sediment in the channel and improve navigation. The work was part of the Army Corps, Baltimore District’s regular operation and maintenance efforts as

KS Welcomes Christopher Day
KS Associates, Inc., an Ohio-based Coastal/Transportation engineering firm, has just announced that Christopher M. Day, P.E., is now a new member of the firm serving as a Project Manager at their Coastal Engineering Group. The Group provides engineering solutions for all types of waterfront and wate

Kaminsky Urges USACE to Dredge Jones Inlet
A New York State senator is calling for the U.S. Army Corps of Engineers to “immediately” dredge Jones Inlet for safer navigation after a fatal boating accident on May 2, Newsday reports. Senator Todd Kaminsky requested in a May 4 letter that the federal agency dredge the inlet that is a major water

Galveston Deepening Deal Inked
The U.S. Army Corps of Engineers will complete engineering and design resulting in a set of plans and specification ready for solicitation to deepen the last 2,571 feet the Galveston Ship Channel to 46 feet under a design agreement signed with the Galveston Wharves yesterday. If Federal construction

CPRA Sediment Diversions 101 Webinar Set for Today
Louisiana Coastal Protection and Restoration Authority (CPRA) will host a webinar named ‘Sediment Diversions 101’ today. “Join Brad Barth, Mid-Basin Sediment Diversion Program Manager, for an interactive Sediment Diversions 101 presentation,” said CPRA. “We’ll give an overview on how these projects

Royal IHC to Build Water Injection Dredger for NCSPA
Royal IHC was recently awarded a contract for the design and build of a water injection dredger (WID) for the North Carolina State Ports Authority (NCSPA). In line with NCSPA’s specifications, the dredger is designed to offer easy maintenance and a smooth operation. Other key design factors include

Managing Risks: How to Select the Appropriate Dredging Contract
The International Association of Dredging Companies’ (IADC) latest edition of their Terra et Aqua magazine featured a very interesting article named ‘Managing risks: how to select the appropriate dredging contract’. The contracting environment for dredging and offshore works is diverse. Moreover, in

Oregon Inlet Dredging Available for Public Review
Cape Hatteras National Seashore (Seashore) has announced the availability of a draft Finding of No Significant Impact (FONSI) for the dredging of Oregon Inlet with a Dare County dredge. Dare County is seeking a Special Use Permit from the Seashore to utilize a privately-owned hopper dredge in the sa

Caminada Headland Marsh Creation Project Moving into Next Phase
The Caminada Headland Back Barrier Marsh Creation – Increment 2 (BA-193) project is moving into the next phase, officials announced on the CWPPRA website. The project entails dredging suitable marsh fill material from designated offshore borrow areas to create an eight mile long stretch of marsh. Du