
Hall Contracting Pty Ltd has been engaged to undertake dredging and land reclamation works at Gladstone Harbor as part of the Clinton Vessel Interaction Project. “Our team will use backhoe dredge Woomera to widen the channel, creating safer conditions for vessels,” the company said in their latest r

Almost 40 local jobs will be created to support a major channel widening and land reclamation project in Gladstone Harbor this year. The $80 million Clinton Vessel Interaction Project being led by Gladstone Ports Corporation will widen the Clinton Channel by about 100 meters and to further develop p

The McGowan Government will contribute $200,000 towards a temporary rock wall to protect the infrastructure at Port Beach in North Fremantle, Western Australia. Port Beach was identified as an at-risk location in the Coastal Erosion Hotspots in Western Australia report released last year. This $200,

Dredging Today brings you an overview of the most popular stories from the past week (January 13 – 19, 2020). Port of Corpus Christi Closes 2019 with Success The Port of Corpus Christi, Texas, ended 2019 with record tonnages for December – 13.8 million cargo tons and 122.2 million cargo tons for t

The dredging of 1 Mile creek in Port Hinchinbrook, Cardwell is today one step closer with liquidator Offermans agreeing for Cassowary Coast Regional Council to use their existing dredging permits. While there are still significant steps needed to fulfill the Federal Government requirements, this is

The International Association of Dredging Companies (IADC) recently released the latest edition of their Terra et Aqua magazine. New Terra features articles covering dredging projects as well as the topics of safety, socio-economics, technical innovations and the environment, including: MAPPING WATE

Victorian Regional Channels Authority (VRCA) is currently conducting ‘bed-leveling’ operations in selected areas of the channels, berths and approaches of the Port of Geelong, located on the shores of Corio Bay at Geelong, Victoria. The bed leveling exercise is designed to re-distribute sediment to

Dredging Today brings you an overview of the most popular photos that marked the 2019 dredging season. PHOTO: The First Load of Dredged Material from Charleston Post 45 Lower Harbor The U.S. Army Corps of Engineers, Charleston District, has released this beautiful photo of the first load of dredge
Dredging Today brings you an overview of the most popular videos from the past year. Royal IHC VIDEO: Assembly of the 2000th Pump The 2,000th pump is one of two onboard double-walled dredge pumps for Jan De Nul Group’s new self-designed 18,000m³ trailing suction hopper dredger (TSHD) that is curre
Dredging Today brings you an overview of the most popular interviews from the past year. Interview with UniSite COO, Focusing on In-Depth Cooperation with Customers UniSite Group, a Ningbo based company involved in dredging, land reclamation, offshore projects, marine, mechanical engineering and g
Dear Readers, The Dredging Today editorial team wishes you a happy and prosperous 2020! We would like to thank you all for being with us in this momentous year of 2019, where the dredging sector bloomed amazingly. We hope you stay with us through this exciting ride and follow our contribution to the
Dredging Today brings you an overview of the most popular stories from the past week (December 23 – 29, 2019). Titan LNG Delivers LNG to TSHD Scheldt River Via Trucks A joint effort between Port of Brest, CCIMBO, DEME and Titan LNG resulted in the successful truck-to-ship LNG bunkering of the Sche