The Marshall Liberal Government will secure South Australia’s vulnerable coastline through a $52.4 million commitment in the 2019-20 State Budget to address the devastating erosion along its shoreline. According to the Premier Steven Marshall, this significant package includes $48.4 million allocate
The Port Kembla Gas Terminal (PKGT), owned by Australian Industrial Energy (AIE), has reached another important milestone with the wharf facility and pipeline construction contract being awarded. The contract was awarded to the SCSB joint venture which comprises Spiecapag and Soletanche Bachy, which
Jan De Nul Group realized a turnover of 1,708 million euro in 2018, adding that the EBITDA amounted to € 277 million or 16.22% of their turnover, the company announced today. “It was no real surprise that, as in 2017, the market conditions remained quite challenging in 2018. For several years in a r
Ongoing erosion of the Quinns Rocks coastline over a number of years has been alleviated thanks to long-term coastal management works conducted by the City of Wanneroo, WA. Winter storm conditions have caused substantial wear and tear to the foreshore for a number of years, with sand movements causi
The City of Stirling, Western Australia, is working with the community to investigate engineering options to address ongoing coastal erosion at Mettams Pool. To do this, the city is inviting a feedback from residents and ratepayers on what they value about Mettams Pool, its facilities and amenity. F
A multi-million dollar dredging program and sediment management facility is set to support tourism, jobs and businesses in the Gold Coast Marine Industry Precinct by improving navigational access to the Coomera River, the Gold Coast Waterways Authority (GCWA) said in its latest announcement. Ministe
Maintenance dredging of the Rosslyn Bay Harbor is set to begin next month, according to the Member for Keppel and Assistant Education Minister Brittany Lauga. “The Palaszczuk Government is delivering on its election commitment to invest in boating infrastructure across Central Queensland and the sta
Damen Dredging Equipment has delivered a customized CSD500-S to Australian customer, Energy Resources of Australia (ERA). The CSD, which has been named the Brolga I, will work in an acidic environment with a pH of approximately 3 for which a wide array of adaptations have been incorporated. The dred
The Department of Environment, Land, Water and Planning (DELWP) will replenish sand levels at Marengo to protect critical infrastructure behind the foreshore, reports the Otway Coast Committee. Contractors will transport 16,000 cubic meters of sand from Apollo Bay Harbor to Marengo, creating an addi
Important design studies needed as part of the Warrnambool Harbor Master Plan have been given the green light, according to the latest release from the Premier of Victoria’s office. The 2018/19 Victorian State Budget provided $330,000 for the Warrnambool Harbor Sand Movement Study, with the Labor Go
Dredging Today brings you an overview of the most popular stories from the past week (May 20-26, 2019). Julong Delivers CSD500 Duo to Bangladesh Qingzhou Julong Environment Technology Co. Ltd., a Qingzhou City based manufacturer and supplier of dredging equipment, has successfully delivered two un
NORTH Queensland Bulk Ports Corporation (NQBP) will soon begin maintenance dredging at the Port of Weipa. Dredging will also be completed at Amrun on behalf of Rio Tinto. Dredge vessels TSHD Brisbane and Oranje will work within the Port of Weipa and Amrun from approximately 3 June and to 17 July inc