JSC RCDB Stapel has developed and handed over to the customer the next project of a non-self propelled suction dredger of capacity of 4,000 cbm/h. The dredger is designed for dredging, land reclamation, mining and removal of sediments. The vessel is a dismountable structure consisting of fastened to
Work to clean up and repair the Wellington Dock has been delayed by bad weather, Dover Harbour Board has revealed… (thisiskent) [mappress] Source: thisiskent, December 27, 2011;
The Aktau marine harbour is finishing the year with record indices. The port has handles almost 12 million tonnes of freights, including over 8 million tonnes of oil, over 3 thousand tonnes of grain and two million tonnes of metal products. Together with the everyday work the port is conducting the
The extraordinary shareholders’ meeting of Ackermans & van Haaren NV has on 25 November renewed the powers delegated to the board of directors to redeem shares for a period of 5 years. In the framework of these powers, the company has in the period from 14 until 22 December redeemed a total of 38,00
The Aberdeen Harbor board plans to invest £24 million in improvements to meet growing demand. One of Scotland’s busiest harbors plans the completion of work at Torry Quays and starting phase two of the project to improve dockside facilities and provide extra deepwater berthing. “The import and expor
Cargill and Rubis Terminals have signed a lease agreement with the Port of Rotterdam Authority for the expansion of their site by 2.8 and 4.4 hectares respectively. The site, on Welplaatweg, is currently leased by their joint ‘neighbour’ Evonik. This company will have ceased all operations by the en
Scottish Enterprise, in association with Forth Ports and City of Edinburgh Council are considering investment options for the Port of Leith. The aim will be to provide flexible facilities for a range of possible industry uses including dry bulk cargo, cruise shipping, marine renewable manufacturing,
Riverside Inverclyde (property Holdings) Limited has announced early information about planned riverside development works. The Gourock public realm improvement works project is part of a wider regeneration programme, delivered by Riverside Inverclyde (Property Holdings) Ltd., over the next 10 years
This Friday, 23 December, the mobile container crane for the new Beverdonk Container Terminal on Albertkanaal, will be delivered. Precisely a week earlier, the terminal itself was completed. It will become operational at the beginning of 2012. The terminal currently occupies 2.5 ha and has a 200-met
Ust-Luga Company has announced Alexander Volkov as Harbormaster of Sea Commercial Port of Ust-Luga on December 20, 2011. Aleksandr Volkov was appointed to the new post in accordance with the order of Alexander Davydenko, head of the Federal Agency of Maritime and River Transport (Rosmorrechflot). Po
SENER has been hired by Murueta Shipyard for the creation of a global finite elements model of two sectional dredgers of 1,500 m3 and 2,600 m3 with shipyard number 293 and 294 respectively and both technologically advanced and innovative. SENER will also develop the basic engineering of the central
Novorossiysk Commercial Sea Port Group announces its unaudited consolidated financial results for nine months ended 30 September 2011 in accordance with International Financial Reporting Standards (IFRS). NCSP Group continued implementation of its investment program, aimed at construction of new and