Europe & Eurasia

Fehmarnbelt: MOTAS delivers sand backfill system to Neptune Marine
Equipment

Fehmarnbelt: MOTAS delivers sand backfill system to Neptune Marine

MOTAS Dredging Solutions has delivered the complete component package for the 800 mm pipe diameter sand backfill installation for these works by the Femern Link Contractors joint venture (FLC). The order was awarded by Dutch shipyard Group Neptune Marine – the builders of the large spreader pontoon

about 3 years ago
Royal IHC to celebrate 60 Years of Beaver dredgers
Vessels

Royal IHC to celebrate 60 Years of Beaver dredgers

This year Royal IHC will proudly celebrate 60 Years of Excellence of the iconic Beaver CSD range of vessels. From the very first delivery in 1963 to the upcoming 1000th Beaver planned for delivery this year, IHC Beaver journey has been marked by innovation and reliability. One of the inaugural Beave

about 3 years ago
Aberdeen Port fully operational after £420M expansion
Infrastructure

Aberdeen Port fully operational after £420M expansion

Port of Aberdeen’s transformational £420 million expansion project is now fully operational. “Quayside construction is complete at Aberdeen South Harbour and the expanded port now offers its customers and port users 8km of quayside, making it Scotland’s largest berthage port,” according to their off

about 3 years ago
Titan and Vox Ariane: The first two Ship-to-Ship LNG bunker operations in Hamburg
Equipment

Titan and Vox Ariane: The first two Ship-to-Ship LNG bunker operations in Hamburg

Titan has successfully performed the first two Ship-to-Ship LNG bunker operations in Hamburg. On the 14th of August, the company facilitated a second LNG bunkering to the Van Oord’s trailing suction hopper dredger (TSHD) Vox Ariane. Titan’s ship Optimus executed bunkering of a total of 808 cbm of LN

about 3 years ago
Replenishing the Lydd Ranges with new shingle
Authorities & Government

Replenishing the Lydd Ranges with new shingle

The Environment Agency and their contractor, Van Oord, continue to work on the Lydd Ranges sea defence scheme. According to the Environment Agency, the contractor is dredging and recharging the rapidly eroding beach with new shingle. The Lydd Ranges Sea Defence scheme is a major investment being del

about 3 years ago
BREAKING NEWS: Boskalis to deploy TSHD for Baltica 2 job
Business development

BREAKING NEWS: Boskalis to deploy TSHD for Baltica 2 job

Boskalis has acquired two contracts for the transportation and installation of the export and array cables for the 1.5 GW Baltica 2 offshore wind farm off the coast of Poland. The two contracts were awarded by a joint venture between PGE Polska Grupa Energetyczna and Ørsted, which are developing the

about 3 years ago
Expanding the capacity of the Port of Beirut
Infrastructure

Expanding the capacity of the Port of Beirut

The Port of Beirut has historically played a vital role in Lebanon’s economy, as a major cargo and transit hub. However, due to the civil war and political instability, this key position has weakened over time. The situation was compounded by the COVID-19 pandemic and a major explosion in 2020. As p

about 3 years ago
Deep dredging by Damen at the second highest dam in the world
Equipment

Deep dredging by Damen at the second highest dam in the world

At 271.5 meters, Georgia’s Enguri Hydropower Dam is the second highest in the world, holding a staggering 1,100,000,000m3 water and 20 turbines producing a total capacity of 1,300MW electricity. According to Damen, this is no ordinary dam, and keeping it free from sediment requires no ordinary dredg

about 3 years ago
Work on new offshore breakwater in Millport Bay about to begin
Business development

Work on new offshore breakwater in Millport Bay about to begin

Works to construct a new offshore breakwater in Millport Bay as part of Millport Flood Protection Scheme are planned from Monday, 11th September, until March 2024. The breakwater will be constructed between the small rock islands of The Leug, The Spoig and The Eileans as illustrated. According to Cu

about 3 years ago
Largest beachfill project in Dutch history
Project & Tenders

Largest beachfill project in Dutch history

Large parts of the beach on the west side of the Dutch Wadden Island Ameland disappears in the sea every year due to wind, waves and currents. That is why Boskalis carried out a major beach nourishment campaign this summer for the client Rijkswaterstaat. The extra sand was required to ensure a wide,

about 3 years ago
VIDEO: Saltmarsh restoration – the BUDs trial
Business development

VIDEO: Saltmarsh restoration – the BUDs trial

Solent Seascape Project has released this amazing video named Saltmarsh Restoration – the BUDs trial. A new trial taking place in Chichester hopes to prove that sediment dredged out of marinas can be put to good use, by rebuilding degraded shoreline and reversing saltmarsh decline. The trial is the

about 3 years ago
Water injection dredger MERSEY to work in Woolwich Reach
Operations & Maintenance

Water injection dredger MERSEY to work in Woolwich Reach

Port of London Authority has just announced autumn dredging campaign in the area of Woolwich Reach. According to PLA, On or about 27th September 2023, marine contractors working on behalf of Tate & Lyle will be undertaking water injection dredging operations at Thames Refinery Outer Jetty. “In order

about 3 years ago