Europe & Eurasia

Connecting Europe’s largest sand production plant on sustainable shore power
Equipment

Connecting Europe’s largest sand production plant on sustainable shore power

Bakker Sliedrecht has provided one of Europe’s largest floating sand plants of Dekker Group with a sustainable shore power connection. The system integrator has carried out the delivery and installation of the high-voltage facilities at the sand plant in cooperation with Dekker Grondstoffen and Verh

about 5 years ago
Over £20M for Montgomery and Llangollen Canals
Business development

Over £20M for Montgomery and Llangollen Canals

The Montgomery Canal and Llangollen Canal have secured over £20 million in funding from the Government’s UK Levelling Up Fund. The funding, which will restore a stretch of the Montgomery Canal in Wales, and deliver visitor improvements along the Llangollen Canal, which is part of the UNESCO World He

about 5 years ago
T&C’s new dredger about to begin its first job
Vessels

T&C’s new dredger about to begin its first job

Recently delivered Ingeniería de Topografía y Caminos S.A. (T&C) new cutter suction dredger is about to begin its first project, dredging of the Paraguay River. At the moment, this Damen-built CSD500 is being assembled on location near the capital of Asunción, after transport by road & by sea. There

about 5 years ago
IADC dredging seminar taking place in Delft
Business development

IADC dredging seminar taking place in Delft

International Association of Dredging Companies (IADC) announced today the date of their five-day Dredging Seminar which will take place from 8 – 12 November 2021 at the IHE Delft Institute for Water Education, The Netherlands. According to IADC, to optimise the chances of the successful completion

about 5 years ago
Vale Verde opts for Damen again
Equipment

Vale Verde opts for Damen again

Brazilian company Constructora Vale Verde has placed a repeat order for a cutter suction dredger type CSD350 with Damen Shipyards. This dredger is a sister vessel to the dredger Amsterdam, delivered in 2019. The new CSD350 for Vale Verde will be named Holanda and is identical to the Amsterdam; a ful

about 5 years ago
Building ecosystems as part of the climate crisis solution
Business development

Building ecosystems as part of the climate crisis solution

The fact that the world is in a climate crisis is unquestionable and the offshore energy industry is working at full pace for a more sustainable environment. We are regularly introduced to many solutions and innovations which fail to take nature into account. That is not the case with DEME’s latest

about 5 years ago
The first locally built dredger in Argentinian history almost complete
Equipment

The first locally built dredger in Argentinian history almost complete

The first locally made dredger in Argentina is shaping up nicely, Damen said. The SPI Servicios Portuarios yard in Mar del Plata is busy manufacturing all pontoons. The DOP Dredger component package has been delivered by Damen. The dredger, type DD250, is a standard dismountable dredger. This piece

about 5 years ago
North Lincolnshire flood defence work complete
Infrastructure

North Lincolnshire flood defence work complete

People in South Ferriby are better protected from tidal surges and sea level rises following the completion of a £14 million flood defence in North Lincolnshire. The major investment reduces flood risk for 150 properties in the area, as well as 3,000 hectares of agricultural land and vital infrastru

about 5 years ago
Keel laid for two cutter dredgers of Project 4395
Vessels

Keel laid for two cutter dredgers of Project 4395

Public Joint Stock Company “Shipbuilding, Ship Repair Corporation” yesterday held a keel laying ceremony for two non-self-propelled cutter suction dredgers of Project 4395. The two vessels – ordered under the Comprehensive Plan for Modernization and Expansion of Core Infrastructure (CPMI) until 2024

about 5 years ago
Dinish Wharf project progresses nicely
Business development

Dinish Wharf project progresses nicely

Sorensen Civil Engineering continues to make great progress on the refurbishment of Dinish Wharf in Castletownbere, Ireland. The project scope includes extension of the quay wall, construction of breakwater cells, dredging of the navigation channel and berth pocket along with all associated ancillar

about 5 years ago
Offshore Energy Conference starts in a few days
Business development

Offshore Energy Conference starts in a few days

Offshore Energy Exhibition & Conference 2021 is approaching! With only a few days left, don’t forget to sign up to be part of a great event filled with networking opportunities, insightful sessions and doing business. This year’s content theme is: “Offshore Energy in a Changing World”. Four talk sho

about 5 years ago
Restoring seagrass in Romania by Van Oord
Technology

Restoring seagrass in Romania by Van Oord

Van Oord was contracted by Administratia Bazinala de Apa Dobrogea-Litoral (ABA-DL) in 2019 to design and build new groynes and beaches to protect the popular seaside resort of Eforie on the Black Sea from erosion. Part of the project is the construction of three hectares of sea grass. Van Oord is cu

about 5 years ago