Europe & Eurasia

Minimising downtime: The importance of reliable dredging partner
Filip Stefanović, the head of engineering at Ecocoast, recently highlighted the importance of choosing reliable partners for dredging operations, and what the most important considerations should be when choosing a dredging contractor. According to Mr. Stefanović, as a dredging provider, managing an

Land & Water wraps up Horsham work
Land & Water has completed works at the Royal Chartered Christ’s Hospital School in Horsham to restore two lakes. Incorporating HVO fuel into its machinery, a 90+% net carbon biofuel which substantially reduces carbon emissions compared to conventional gas oil, Land & Water successfully dredged and

Creating UK’s premier offshore wind hub through dredging
UK contractor Graham has started development works on the South Bank Quay for the Teesworks offshore wind hub. Under the project, two million tonnes of material will be dredged, creating the deep-water berthing facility. Also, the work includes ripping out the dilapidated concrete and wooden jetties

The world’s most powerful CSD Spartacus in Egypt VIDEO
The largest ever dredging and land reclamation contract in DEME’s history – the Abu Qir port project in Egypt – is moving forward according to schedule. The world’s most powerful cutter suction dredger (CSD) Spartacus is currently working on this capital development program. According to the Belgian

Water injection dredger L’Ostrea baptized
Grand Port Maritime de Bordeaux’ water injection dredger (WID) L’Ostrea was baptized in a naming ceremony last week. MOTAS Dredging Solutions was responsible for the engineering and delivery of the complete dredging installation including the dredging control and monitoring system. For this project,

Castor Marine connects Jan De Nul’s entire fleet
Jan De Nul Group has moved its entire fleet of 82 vessels and jack-up barges to Castor Marine’s global VSAT and Iridium connectivity network on a long-term contract to guarantee solid vessel connectivity. Since all vessels are operational around the globe, Castor Marine was challenged to migrate ves

Mytholmroyd’s flood alleviation scheme opens
Mytholmroyd’s new flood alleviation scheme, providing greater protection to 400 homes and businesses, has been officially opened. Over £41 million has been invested in the new defences, as part of partnership working to make the village more resilient to the impacts of climate change. Funding was se

Burry Port Marina dredging underway
The Marine Group has just released the latest update on their Burry Port Marina dredging program. “Dredging progress with CMS Seaka is going well and we will reach target depths in many berths this year,” said the Group. The dredging work has focussed on the pontoon grid in the main harbour and CMS

BAM Nuttall wins another well-deserved award
BAM Nuttall’s work to rebuild Marine Parade in Dawlish on behalf of Network Rail has won the ‘Project over £8 million Re-engineered’ Award at the ICE South West Civil Engineering Awards. Following devastating storms in 2014, which caused significant disruption to the railway connecting Devon and Cor

Reducing flood risks across Somerset Levels and Moors
Two rivers are being made bigger this autumn to help reduce flood risks across 150 square miles of the Somerset Levels and Moors. The River Sowy-King’s Sedgemoor Drain Enhancements Scheme (Phase One) is being delivered for Somerset Rivers Authority by the Environment Agency. The rivers’ capacity to

Boskalis opts for Nautic Jobs
Nautic Jobs, specialising in intermediary services for maritime and civil engineering personnel, has signed a multi-year contract with dredging giant Boskalis. Under the agreement, Nautic Jobs will become a preferred supplier for the Papendrecht based dredging and maritime services company – startin

Dredger Witton busy in Bembridge Harbour
The dredger Witton and hopper barge Split 2 arrived in Bembridge Harbour on September 27 and the dredging operations are already underway. The area to the east of the Fisherman’s pontoon used for mid-harbour moorings will not be cleared of boats or mooring buoys until dredging operations are complet