Europe & Eurasia

Etermar wins Lajes Port tender
Project & Tenders

Etermar wins Lajes Port tender

Etermar, one of the largest Portuguese companies specialised in marine construction, has won another tender for a port-development project. A year ago, hurricane Lorenzo destroyed the most western port in Europe. Now, the consortium led by Etermar – Engenharia e Construção, S.A., together with SACYR

about 6 years ago
HR Wallingford completes model for San Antonio breakwater
Project & Tenders

HR Wallingford completes model for San Antonio breakwater

As part of San Antonio Port’s expansion plans, a cross-organisational team has presented its final report assessing the structural stability and port operability of the proposed new outer breakwater in Chile. The report was the result of more than a year’s partnership between HR Wallingford and Inst

about 6 years ago
CSD Krios sea trials (VIDEO)
Infrastructure

CSD Krios sea trials (VIDEO)

Earlier this month, the self-propelled cutter suction dredger KRIOS, returned from successful sea trials on the North-Sea and the second Maasvlakte. According to Royal IHC, all planned tests were successfully completed under the supervision of Boskalis and Bureau Veritas. The newbuild is a sister ve

about 6 years ago
Wasa and Van Oord finish Kokkola dredging project
Project & Tenders

Wasa and Van Oord finish Kokkola dredging project

Wasa Dredging and joint-venture partners Van Oord have completed the Kokkola dredging project according to schedule. The Kokkola fairway opened on the 30th of September 2020 with a new navigational depth of 14m, Wasa reported. The project started in May 2018 when Wasa mobilised two vessels: the 360-

about 6 years ago
Climate Adaptation Summit (CAS) takes place online
Environment

Climate Adaptation Summit (CAS) takes place online

2020 is the international Year of Action on climate adaptation. Van Oord is ahead of the wave: last year, it announced its Climate Adaptation Action Plan. The ambition is to stimulate and accelerate business activities that play a role in protecting populations and landscapes against the risks of fl

about 6 years ago
TSHD Sospan Dau to take part in the Southsea Scheme
Infrastructure

TSHD Sospan Dau to take part in the Southsea Scheme

Construction works are about to begin on Sub-frontage 1: Long Curtain Moat of the Southsea Coastal Scheme from 19 October 2020 until May 2022, informs the Queen’s Harbour Master Portsmouth. The contractor for the works is VolkerStevin Boskalis Westminster (VSBW). In summary, works will include the c

about 6 years ago
JDN: Paving the way to Hamburg
Innovation

JDN: Paving the way to Hamburg

In the latest edition of the FOCUS magazine, Jan De Nul Group reported an interesting story about the Elbe River dredging project named “Paving the way to Hamburg”. At one time, the company had 4 hoppers, 2 split hoppers and 1 backhoe dredger working on the project. JDN spared no effort to make the

about 6 years ago
PRISMA – innovative dredging methods (VIDEO)
Technology

PRISMA – innovative dredging methods (VIDEO)

Port of Rotterdam has just released this very interesting video about the research program PRISMA – innovative dredging methods. Furthermore, the Port is continuously looking for ways to make the port smarter more efficient, better and more sustainable. “For this, we look under water to find a sourc

about 6 years ago
Environment Agency: West Bay ready for winter
Infrastructure

Environment Agency: West Bay ready for winter

The flood defense scheme at West Bay is ready for whatever winter has to throw at it, the Environment Agency reports. The coastal defense improvements project reduces the risk of flooding from the sea to 260 properties and businesses. Although the beach was returned to its usual shape after the comp

about 6 years ago
Rohde Nielsen wraps up Paldiski dredging work
Infrastructure

Rohde Nielsen wraps up Paldiski dredging work

Rohde Nielsen A/S recently completed the Paldiski South Harbor dredging work for the client Port of Tallinn. This dredging program included the dredging operations on the entrance channel and turning basin areas. The dredging started in December 2019 and was completed in less time than initially pla

about 6 years ago
Van Oord bags another dredging project in Taiwan
Infrastructure

Van Oord bags another dredging project in Taiwan

Van Oord has won a contract to dredge the water intake basin of the Taiwanese Da Tan power plant. Cutter suction dredger HAM 218 and trailing suction hopper dredger HAM 318 will join forces on this project. According to Van Oord, this project will kick off in early 2021. Driven by the growing demand

about 6 years ago
Bacton to Walcott scheme nominated for Merit Awards 2020
Infrastructure

Bacton to Walcott scheme nominated for Merit Awards 2020

The Institution of Civil Engineers (ICE) has announced nominees for the 2020 ICE East of England Merit Awards. The Merit awards celebrate the best of civil engineering in the region. Among the nominees is the Bacton to Walcott Sandscaping Scheme. Carried out by Van Oord and Royal Haskoning DHV on be

about 6 years ago