Europe & Eurasia

Royal IHC delivers Mont Mandara to PAD
Equipment

Royal IHC delivers Mont Mandara to PAD

Royal IHC handed over the 3,000m³ trailing suction hopper dredger (TSHD) Mont Mandara to Cameroon’s Port Authority of Douala (PAD) last week. This successful delivery completes the PAD fleet, following its acquisition of an IHC Beaver 50® cutter suction dredger and a DMC work boat in 2019. The new T

about 6 years ago
Spotlight on surface water and drainage
Infrastructure

Spotlight on surface water and drainage

GOV.UK today announced that they welcomed the completion of an independent review aimed at reducing the risk of surface water flooding across England and is taking immediate action to implement some of its recommendations. This action will build on the recent publication of the government’s long-ter

about 6 years ago
Work continues on East Rhyl defence scheme
News

Work continues on East Rhyl defence scheme

The next phase of work is due to start on a £27 million flood defence scheme in Rhyl in October. The East Rhyl Coastal Defence Scheme will protect 1,650 properties in East Rhyl and will be funded through the Welsh Government, as well as part funding by Denbighshire County Council. Work started on si

about 6 years ago
Van Oord testing the use of biofuel
Environment

Van Oord testing the use of biofuel

Following the biofuel pilot last year, Van Oord’s trailing suction hopper dredger HAM 316 has again successfully executed two projects, while running on biofuel. This time the vessel was deployed in the United Kingdom. First on the Lincolnshire Beach Management works, which we executed for the Envir

about 6 years ago
Mackley completes Phase 4a of the NPI Scheme
Infrastructure

Mackley completes Phase 4a of the NPI Scheme

Throughout the summer excellent progress has been made at Phase 4a of Portsmouth City Council North Portsea Island (NPI) Scheme. Eastern Solent Coastal Partnership working with their contractor Mackley have now completed the flood defence works, with only some ancillary works and the landscaping to

about 6 years ago
CSD MOHAB MAMEESH cutter ladder installation VIDEO
Infrastructure

CSD MOHAB MAMEESH cutter ladder installation VIDEO

Last month, Royal IHC crews successfully completed the installation of cutter ladder for Suez Canal Authority’s (SCA) cutter suction dredger MOHAB MAMEESH. With this, the project reached another milestone towards the completion and delivery of this mighty vessel to the client. The MOHAB MAMEESH is o

about 6 years ago
Argentinian shipyard to build DOP Dredger 250
Infrastructure

Argentinian shipyard to build DOP Dredger 250

SPI Servicios Portuarios Integrados for Mar del Plata port in Argentina has acquired a DOP Dredger component package from Damen Shipyards Group. The Argentinian shipyard will build major components and assemble the dredger. According to Damen, this will be the first locally built dredger in Argentin

about 6 years ago
First heavy-duty electric excavator in the Netherlands
Environment

First heavy-duty electric excavator in the Netherlands

This week, Van Oord commissioned the first heavy-duty fully electric hydraulic excavator in the Netherlands. In doing so, Van Oord is contributing to the electrification of the construction site and reducing CO2 and nitrogen oxide emissions during the project execution. “We are proud to have added t

about 6 years ago
Boskalis reports strong operational first half year
Business & Finance

Boskalis reports strong operational first half year

Royal Boskalis Westminster N.V. (Boskalis) had a very good operational first half year considering the circumstances, the company reported today. The operating result increased sharply compared to last year with revenue at virtually the same level. According to the release, Boskalis’ financial posit

about 6 years ago
CSD Spartacus spuds installation VIDEO
Infrastructure

CSD Spartacus spuds installation VIDEO

Last week, we reported a major milestone in the construction of the world’s first LNG-powered cutter suction dredger (CSD) Spartacus. DEME and Royal IHC teams are putting the finishing touches to this pioneering new vessel. As reported, both giant spuds for the new CSD are now in place, marking the

about 6 years ago
Beach renourishment part of the Lydd Ranges scheme
Infrastructure

Beach renourishment part of the Lydd Ranges scheme

Mackley has been commissioned by the Environment Agency to carry out emergency works on a section of frontage on the East Sussex coast. The Lydd Ranges Emergency Works consist of the placement of approximately 56,000 tons of rock armour with geo-textile, and import of 45,000m3 of shingle. The projec

about 6 years ago
Work progresses on Doncaster flood scheme
Authorities & Government

Work progresses on Doncaster flood scheme

Works are progressing well to repair a 40 metre slip on a flood defence in Doncaster damaged by last November’s floods. According to the Environment Agency, rock bags are being installed to reinforce the bank. The £1.6 million works at Wheatley Park are expected to be complete by mid-September and a

about 6 years ago