Europe & Eurasia

Boskalis First Quarter Results
The first quarter of 2020 was above expectations for Royal Boskalis Westminster N.V. (Boskalis). In light of the worldwide developments of the COVID-19 virus, Boskalis closed a good first quarter. According to the company, a modest increase in revenue was accompanied by a higher result compared to t

Royal IHC, Douala Port Authority Continue Their Cooperation
Cameroon’s Port Authority of Douala (PAD) has acquired high-tech equipment from Royal IHC to support their dredging activities. As part of measures to autonomously manage its dredging activities, the management of the PAD acquired an IHC Beaver 50 cutter suction dredger (CSD) and a DMC work boat. Th

Royal IHC to Build Water Injection Dredger for NCSPA
Royal IHC was recently awarded a contract for the design and build of a water injection dredger (WID) for the North Carolina State Ports Authority (NCSPA). In line with NCSPA’s specifications, the dredger is designed to offer easy maintenance and a smooth operation. Other key design factors include

Aberavon Coastal Scheme Progresses
Neath Port Talbot Council and their contractor Knights Brown are making good progress on the vital scheme to repair and strengthen the iconic Aberavon Seafront Promenade. The work is part funded by the Welsh Government through its Coastal Risk Management Program – first announced by the Welsh Govern

Damen: Screening Installation for Marine Aggregate Dredger
Damen Dredging Equipment crew is currently very busy working on the screening installation for the new Marine Aggregate Dredger (MAD) 3500 for Hanson Aggregates Marine. A keel laying ceremony for this dredger, currently under construction at their shipyard in Romania, took place in October 2019. The

Managing Risks: How to Select the Appropriate Dredging Contract
The International Association of Dredging Companies’ (IADC) latest edition of their Terra et Aqua magazine featured a very interesting article named ‘Managing risks: how to select the appropriate dredging contract’. The contracting environment for dredging and offshore works is diverse. Moreover, in

Preparations Underway for the Lavna Terminal Main Works
Oversite excavation is underway at the construction site of Lavna coal terminal (western coast of the Kola Bay) as part of preparations for the main phase of construction works, Federal Marine and River Transport Agency (Rosmorrechflot) posted on its official Instagram profile. The news, also report

Church Scar Coastal Protection Scheme Completed
Construction works on the Fairhaven to Church Scar Coastal Protection Scheme are now complete, according to the Fylde Council. VBA – a joint venture between VolkerStevin, Boskalis Westminster and SNC-Lavalin’s Atkins business – worked together with Fylde Council on this £22m coastal protection schem

Arundel Tidal Defense Scheme Update
Good progress continues to be made under the Arundel tidal defense scheme (ATDS) with the improvements to the wall at River Road, informs the Environment Agency. According to the update, further deliveries of steel sheet piles were made to site week beginning Monday 4 May. This means that all the st

IADC Seminar on Dredging and Reclamation in Delft
For the 60th time, the International Association of Dredging Companies (IADC) will organize its well-known International Seminar on Dredging and Reclamation. With the collaboration of IHE Delft Institute for Water Education, the seminar is set to take place from 7-11 September 2020 in Delft, The Net

Highlights of the Week
Dredging Today brings you an overview of the most popular stories from the past week (May 4-10, 2020). Jan De Nul in 2019: Challenging Year for Dredging Jan De Nul Group has just released their business figures for the past year, saying that in line with previous years, 2019 remained a challenging

DEME Wraps Up San Pedro Job
In Ivory Coast, DEME Group recently completed a challenging capital dredging project for the extension of the Port of San Pedro, the second largest port in the country. “With our trailing suction hopper dredgers ‘Marieke’ and ‘Orwell’ we deepened the access channel and executed land reclamation work