Europe & Eurasia

Tackling River Pollution by DEME
Business & Finance

Tackling River Pollution by DEME

DEME Environmental Contractors (DEC), the environmental specialists of DEME, is installing a plastic collector on the river Scheldt on behalf of the Vlaamse Waterweg (the Flemish authority responsible for waterways in Flanders). A combination of a fixed and mobile installation will be tested for a y

about 7 years ago
HES Hartel Tank Terminal Handed Over to the Owner
Business & Finance

HES Hartel Tank Terminal Handed Over to the Owner

In recent months significant progress has been made in the development of the 1.3 million cbm HES Hartel Tank Terminal, a project of HES International. Construction works for building the tanks and the related piping are in full swing and Port of Rotterdam Authority has completed works on the mariti

about 7 years ago
Jan De Nul Completes Liepaja Port Dredging
Business & Finance

Jan De Nul Completes Liepaja Port Dredging

Jan De Nul Group has successfully completed the capital dredging works for the improvement of Liepaja Port in Latvia. The scope for Jan De Nul Group entailed the removal of 2.7 million m³ of sediments to deepen the port access channel from 12.5 m to 14.5 m, and to create a new navigation channel of

about 7 years ago
Two IHC Reheaters for Kenmare
Business & Finance

Two IHC Reheaters for Kenmare

The recently formed partnership between Royal IHC and Pyromak has already proven to be successful with an order for two reheaters for Kenmare Moma Processing (Mauritius) Limited. The two indirect electric reheaters will operate at the Moma Titanium Minerals Mine, located on the north-east coast of M

about 7 years ago
Rohr-Idreco Builds Cuttingwheel Dredger for Mineros Aluvial
Business & Finance

Rohr-Idreco Builds Cuttingwheel Dredger for Mineros Aluvial

Rohr-Idreco Dredge Systems, a manufacturer of deep digging electric dredging vessels and equipment for the mining and dredging industries, is currently building a large electrical cuttingwheel dredger for Columbian gold mining company Mineros Aluvial. The dredger will have a max digging depth of 28

about 7 years ago
Damen Shoalbuster 3815 SD Ready for Action
Business & Finance

Damen Shoalbuster 3815 SD Ready for Action

Damen’s new Ultra Shallow Shoalbuster 3815 SD has successfully completed sea trials and bollard pull testing. The newly designed vessel achieved 18.6 tonnes of bollard pull, while still being able to operate in extreme shallow waters. Despite this impressive show of power, noise levels inside all th

about 7 years ago
Keppel O&M Delivers TSHD Sanderus to Jan De Nul
Business & Finance

Keppel O&M Delivers TSHD Sanderus to Jan De Nul

Keppel Offshore & Marine has officially handed over the 6.000m³ trailing suction hopper dredger (TSHD) Sanderus to Jan De Nul Group. According to JDN, their fourth Ultra-Low Emission vessel was delivered today in Singapore. This follows the delivery of three 3.500m3 TSHDs earlier this year. Keppel O

about 7 years ago
Canal & River Trust Update on Winter Works Program
Business & Finance

Canal & River Trust Update on Winter Works Program

The Canal & River Trust (UK) has announced an update on a £43.6 million winter works program being performed across England & Wales. According to the update, dredging has been completed on the Macclesfield Canal and on the Worcester & Birmingham Canal, where the Trust has removed 27,000 tons of cont

about 7 years ago
Highlights of the Week
Business & Finance

Highlights of the Week

Dredging Today brings you an overview of the most popular stories from the past week (December 9 – December 15, 2019). TSHD Sanderus Passes Sea Trials, Ortelius Hits the Water Jan De Nul said in its latest announcement that their 6.000m³ trailing suction hopper dredger (TSHD) Sanderus has successf

about 7 years ago
Harwich Harbor Deepening Proposed
Business & Finance

Harwich Harbor Deepening Proposed

Harwich Haven Authority is launching a major development in the Haven ports and has applied to the Marine Management Organisation (MMO) for consent to increase the depth of the harbor and approach channel from 13m to 16.0m (plus tide), the company announced in a press release. This dredging project

about 7 years ago
Segura River Dredging Operations Underway
Business & Finance

Segura River Dredging Operations Underway

Guardamar Town Council, Spain, has started phase two of the Segura River dredging works. According to the officials, the dredging of the area will make the river navigable again, recovering its draft for the fishing and tourist vessels that use this area. Councillor for Works, José María Hernández,

about 7 years ago
PHOTO: CSD Krios at IHC Kinderdijk Yard
Business & Finance

PHOTO: CSD Krios at IHC Kinderdijk Yard

The construction and the outfitting of the cutter suction dredger (CSD) Krios, being built by Royal IHC for Royal Boskalis Westminster N.V., is moving according to schedule. This newbuild will be a sister vessel of the CSD Helios, taken into service in 2017. The CSD Krios will have a total installed

about 7 years ago