Multicat Avon and deck barge JML36 are currently on charter to VolkerStevin who are delivering a £14.5m scheme to improve the tidal flood defenses along the East Bank of the River Arun in Littlehampton on behalf of the environment agency. The scheme includes flood defenses from the lighthouse on the
Dredger Incident Prompts RNLI Rescue Mission Aberdeen Coastguard received a request early on Saturday morning, which prompted the rapid response of Invergordon Lifeboat to attend an incident in the Cromarty Firth. News in Photos: Boskalis on the Cowes Project Construction of the new detached break
Preparations for the II International Forum of Dredging Companies which will be organized by the “PortNews” Media-Group and held in Moscow, Russia on February 19th 2015, are in full swing. With less than three moths left to the event, Dredging Today took the opportunity to talk with PortNews Media G
The building of the Fehmarnbelt link is moving ever closer. In just over a year, contractors are expected to commence construction of the world’s longest immersed tunnel. As result, a number of detailed surveys of the seabed off the shores of Fehmarn and Lolland need to be carried out. The studies w
The EU’s TEN-T Program will support with nearly €1 million a study on upgrading the last sections of the Twente canals to make them suitable to larger class Va vessels. The study is the last phase before the construction works planned for 2016. This project will focus on preparing the technical, fin
Waterwegen en Zeekanaal NV has invited bidders to submit their offers for the Channel to Charleroi dredging program. The subject of the contract is the dredging of four zones in the Channel to Charleroi, including the transport of dredged materials to be processed. The zones which will be dredged an
Royal IHC (IHC) has secured a new contract with the Chinese shipyard, Jin Hai Heavy Industrial Group, for the delivery of a dredging installation package for a trailing suction hopper dredger. The package contains major parts of the dredging installation for the 7,000m³ hopper dredger. The agreement
Sometimes the most common solution is not the best solution. This scenario happened to DRAGFLOW while the company was working on a project in Western Canada. Oil sands tailings extraction is always a challenge, but by carefully working with the client, DRAGFLOW equipment was used as an optimal metho
The 7th annual Offshore Energy Exhibition & Conference (OEEC) held on 28 & 29 October at Amsterdam RAI attracted 13,452 visitors representing 81 nationalities, an increase of 47% compared to last year. OEEC 2014 featured 630 exhibitors on 21,000 sq.m. floor space and 106 speakers in 22 sessions. Off
International Association of Dredging Companies (IADC) has just published its Dredging in Figures, an annual review of the global dredging market. The document focusses on the global dredging and maritime construction industry in 2013. The IADC aims to be thorough and precise in the figures presente
The Rt. Hon. the Lord Heseltine CH will be amongst the first to see some of the world’s most sophisticated marine modelling facilities in operation today when he officially opens HR Wallingford’s UK Ship Simulation Centre and the Fast Flow Facility at Howbery Business Park in Oxfordshire. Developmen
Swathe Services Australia is changing its name to Precision Hydrographic Services (PHS). While Swathe Services (UK) still maintains their working relationship with PHS and have upcoming collaborative projects, the PHS rebrand allows both companies to continue to grow their operations respectively. “