Europe & Eurasia
Ackermans & van Haaren NV: Redemption of Shares (Belgium)
The extraordinary shareholders’ meeting of Ackermans & van Haaren NV has on 25 November 2011 renewed the powers delegated to the board of directors to redeem shares for a period of 5 years. In the framework of these powers, Ackermans & van Haaren has concluded a liquidity contract with Kepler Cheuvr
UK: ABPmer to Scope HRA for South Marine Plans
ABPmer has been contracted by the Marine Management Organisation (MMO) to undertake the scoping phase for the South Inshore and Offshore Marine Plans Habitats Regulations Assessment (HRA). Under the Habitats Directive 92/43/EEC any plan or project that may have an impact on European Natura 2000 Site
The Netherlands: Big Step Forward for Rotterdam Container Port
Never before, anywhere in the world, have nine Super Post Panamax container cranes been delivered at the same time in a port by the builders. Seven were built by ZPMC and two by Kalmar, all in China. ZPMC divided its shipment over its own special transport vessels the Zhen Hua 14, which will start u
UK: MP Henry Bellingham Visits Repaired Flood Banks
MP Henry Bellingham saw for himself last week the emergency repairs carried out by the Environment Agency to shingle flood banks at Heacham and Snettisham. He toured the damaged sea defences at Shepherds Port, Snettisham and Heacham Dam with the Agency’s area manager Julie Foley and operations staff
UK: Minister Eustice Meets with MP Murray over Rame Dumping
Local MP Sheryll Murray MP last week joined some of her constituents at a meeting with DEFRA Minister George Eustice MP to discuss the issue of Rame dumping. The cross party delegation, organised by Mrs Murray, included Independent, Conservative and Liberal Democrat Councillors as well as residents.
Dredge Yard, HyperWorks Co-Operate on Dredge and Mining Pumps Design
Dredge Yard, a company dedicated to engineering, consulting and production of dredgers, dredging and mining equipment and technology and Altair HyperWorks, market leader in engineering, simulation and software of fluid dynamics, have teamed up on the design, calculation and simulation of dredge and
Top News – January 13 to 19, 2014
DM-55: IMS’s Solution to Deep Maintenance Dredging (VIDEO) No longer will ports need to hire large commercial dredging outfits to do expensive deep maintenance dredging. Now they can invest in their own maintenance dredging system that will allow them to maintain a maximum depth of 55 ft (16.7m) at
France: SDI/DI/EMCC Wins Rouen Port Dredging Contract
Groupement SDI/DI/EMCC has been awarded a contract for the Port of Rouen dredging program. This development project will include dredging works and rock excavation in the navigation channel of the Port of Rouen and the deposition of dredged material at the piling site to assist in creation of founda
Greece: Alexandroupolis Port Dredging Contract Awarded
The Consortium “Ch.D. Constantinides SA – SA ETETH” has won the Alexandroupolis Port dredging contract. This nearly EUR 20 mln deal will include the completion of dredging on the outer (eastern) basin of the Port of Alexandroupolis and dredging work on the port approaching channel. The Port of Alexa
The Netherlands: IJmuiden Dredging Plan Unveiled
Rijkswaterstaat Programma’s Projecten en Onderhoud has announced the details about the IJmuiden dredging plans. This development program will include maintenance dredging of the access channels and approach areas in the North Sea and in the outer harbour of IJmuiden. The Rijkswaterstaat’s dredging p
UK: MMT NetSurvey to Undertake Blakeney Overfalls Hydrographic Survey
MMT NetSurvey Ltd has been contracted by the Marine Coastguard Agency to undertake a hydrographic survey in the area of the Blakeney Overfalls, north of Blakeney to a point 3km north of Sheringham. The survey vessel for the area Hydrographie Instruction no. 1447 will be MV Seabeam, working out of Gr
Port of Wells Dredging Set for Next Week (UK)
The Port of Wells dredging project will commence on January 20th. The port’s dredger “Kari Hege” will be engaged in dredging operations in the main channel north of number 4 buoy, between buoys 4 and 2. All material dredged from these areas will be placed on the berm which is marked by the port hand