Local contractor Tulloch Developments has completed piling works for the 151-metre long berth at Mair’s Yard where an extensive area of land has been reclaimed. The work follows a Scottish Government’s allocation in 2012 of £965,283 from the European Fisheries Fund (EFF) towards the cost of the £3 m
Thyborøn Havn has announced a plan for the Thyborøn Outer Harbour dredging project. This program includes routine dredging in the Thyborøn comprehensive basin in the Outer Harbour and Industry Fishing Harbour at Svanholmkaj by Limfjodskaj as well as in the South Harbour. Under this plan, approximate
Department of Agriculture, Food and the Marine has introduced a plan for the harbour improvement works at the North Harbour, Cape Clear Island. The proposed works comprise of the demolition of the Bull’s Nose (structure which has fallen into disrepair and it’s replacement with a new reinforced concr
In Belgium, the works on the NORTHWIND offshore wind farm have started while those from C-POWER’S third phase are continuing. The DEME Group is utilizing various specialized companies from the Group to this end: TIDEWAY Offshore Solutions BV as concerns erosion protection works and cable-laying acti
Anadyr Branch of FSUE Rosmorport has invited bidders to submit their offers for the Beringovsky Port dredging program. This contract includes the elaboration of design and estimate documentation for the repair and dredging works at Beringovsky Port, reports portnews.ru. Initial price of this develop
The first MarinaMaster 8000 has arrived by lorry at Fambridge Marina in Essex to carry out dredging trials for owners Yacht Havens Ltd. She is the first of a new design of specialist dredger designed by Alan Goodchild and built in Italy by Italdraghe SpA with supervision from Goodchild Marine. She i
The German Minister of Transport, Dr. Peter Ramsauer, stated that the federal German government is and remains a reliable partner in maritime alliance. “To keep Germany competitive as a maritime location, we will keep the tonnage tax in force. In doing so, we will ensure future-proof framework condi
After the completion of the sea trials, the Spanish shipyard Construcciones Navales de Norte in Sestao has delivered the Fall Pipe & Mining Vessel “Joseph Plateau” to Jan de Nul. This 191,5 m long vessel will be used for precise rock dumping to a depth of 2,000 m. The system for the unfolding of the
Royal Boskalis Westminster N.V. (Boskalis) announces that it has signed a Memorandum of Understanding (MoU) with Sudamericana Agencias Aereas y Maritimas S.A. (SAAM) for a joint harbour towage operation within the American Continent. The partnership would involve two joint ventures and is between SM
From April 9, boaters will once again be able to navigate the River Avon between Bristol and Bath, after a large quantity of silt, built-up throughout a torrid winter of downpours and flooding, has been removed from Hanham Lock. The lock has been closed since October due to excessively high water le
The significant value of A&P Falmouth to the Cornwall economy and barriers to the port growth was the focus of a ministerial visit yesterday. Secretary of State for Business, Innovation and Skills, the Rt Hon Dr Vince Cable heard first hand the ambitions A&P Falmouth and partners have to secure the
This video shows how the sand is being piped onto the beach at Colwyn Bay from the suction dredger Barent Zannen, which is moored off shore. The heavy plant machines on shore are creating a new beach, and by the end of April it should be as high as the sea wall. This project is […]