Holland Marine Technologies BV has developed a new range of bow-coupling systems for Trailing Suction Hopper Dredgers (TSHD). The bow-coupling system enables a THSD to couple to-, and discharge slurry via a floating dredge pipeline or by means of a rain-bow nozzle (for beach replenishment). The Holl
Reef Subsea today announced that its subsidiary company, Reef Subsea Power & Umbilical Ltd., with offices in Stockton on Tees and Aberdeen, has completed its first contract for the recently launched Q1000 Trenching ROV. The contract, for Lincs Offshore Wind Ltd. – a joint venture between UK energy c
The DEME Group presents an overview of the most important projects it was involved in during the past two years. https://www.youtube.com/watch?v=3W5Ur8LuNog In spite of the turbulent economic times, the Group has managed to keep a finger on the pulse in numerous projects and activities all over the
For the next phase in the Flood Risk in the Netherlands (VNK2) project, Iv-Infra is responsible for analyzing the flood risks of the primary flood defenses of dike ring area 13 in Noord-Holland, the Netherlands. For this project, Iv-Infra forms part of the engineering consortium ALBICOM. The VNK2 pr
The bond, issued by DEME on 6 years with a maturity date on 14 February 2019, has been entirely subscribed on the first day of the subscription period for the maximum amount of 200,000,000 EUR. Consequently, the subscription period has been closed early. On 14 February 2013, the bonds will be issued
The Port Authority has planned to allot 328.0 million Lt excluding VAT for the investments in 2013. Properly balanced State and private financing creates conditions to reconstruct and construct new infrastructure objects, terminals and warehouses in the Port, to install the most advanced technologie
On the 23d of January, 2013 the Klaipeda Port Authority and the company „Van Oord Dredging and Marine Contractors BV“ signed the contract on the purchase of the object “The capital dredging works of the object „Improvement of Smelte vessel turning circle to accommodate gross – tonnage ships (contain
Footage from the field on the cutter suction dredger Shanati Sagar XVI working for the Adani Group in India. This content is available after accepting the cookies. Change cookie-settings View on Youtube. Physical properties Length (OA): 104 m Width: 18.6 m Depth: 5 m Cutter power: 1500 kW Total powe
Last Monday January 21st the brand new Damen Stan Pontoon 9127 (SPo 9127) was handed over to Damen’s long term customer EDT Offshore. The ‘EDT REGAS’ was delivered from stock with a delivery time of 2 weeks after the contract. The SPo 9127 has a length of 91,5, a beam of 27,4 and a height […]
Grand Port Maritime de Marseille has announced the details about the Western basins development project. This contract is for the completion of civil works for renovation and maintenance of all Western basins in the Grand Port Maritime of Marseille, including preliminary visits, site preparation and
“LOTOS Petrobaltic” Spótka Akcyjna has invited bidders to submit their offers for the dredging project at the Gdansk area. This plan icludes the dredging services in combination with the repair of subsea installations in B3 and B8 areas, located in the waters of the Polish international economic zon
The 2nd ABPmer conference on Managed Realignment, entitled ‘Coastal Habitat Creation: Are We Delivering?‘, will be held on 20 November 2013 at One Great George Street, London. This conference will focus on the biggest challenges being faced by those working on coastal habitat creation projects acros