Search results for: EIK Engineering

11490 results

A list of search results

  • 28 November 2017
    Business & Finance

    Four units of high-performance amphibious excavators, the EIK CAT320D SLRs have been busy lately working on a flood control in West Jakarta. The excavators are working on the dredging project that will restore depth of the West Flood Channel (KBB) in Tanah Abang. According to EIK, the mudflow in the KBB has overflown and was in need to […]

  • 30 November 2017
    Business & Finance, Equipment, Technology

    After Hurricane Harvey, the shutdown of air, rail, and port operations had an impact well outside the region due to Houston being a multi-modal interchange point. Wind damage from Hurricane Harvey to shipping and port infrastructure was minimal, but an enormous influx of water, sediment and debris entered the Houston Ship Channel, meaning it needed […]

  • 31 October 2016
    Business & Finance, Equipment, Technology

    EIK Engineering has successfully delivered an EIK CAT323D2L amphibious excavator to a customer in Turkey. The excavator, delivered and assembled last month, will be used by the government to carry out maintenance of the river beds, swamps, lakes, ponds and reservoirs. EIK salesperson and service team flew over to oversee the installation process and conducted a training for the crews on […]

  • 21 August 2013
    Business & Finance, Equipment, Technology

    Directors of the Engineering Club and the Regional Engineering, Architecture and Agronomy Board for the State of Rio de Janeiro visited the Industrial Complex of Açu Superport on Tuesday (13), which is being built in São João da Barra (RJ). Consisting of 13 engineers, the group saw the works’ progress, up close and could see […]

  • 21 December 2012

    FCC, the Citizen Services Group, has further strengthened its position in key Latin American countries with its first major contract in Brazil. FCC will expand the Açu Superport, located 315 kilometres north of Rio de Janeiro. The contract, which is worth more than 407 million euro, has an execution period of 32 months and includes […]

  • 13 April 2020
    Business & Finance

    The U.S. Army Corps of Engineers Sacramento District has published the final post authorization change report as well as the final environmental impact statement/environmental impact report for the Sacramento River Bank Protection Project. The reports analyze modifications to the long-term project, which identifies, prioritizes, and repairs erosion-related levee deficiencies within the Sacramento River Flood Control […]

  • 31 October 2014
    Business & Finance

    The Environmental Management Division of the Los Angeles Harbor Department and the U.S. Army Corps of Engineers have prepared a joint Notice of Intent/Notice of Preparation (NOI/NOP) for the proposed Everport container terminal improvement project at Berths 226-236 at the Port of Los Angeles. The Notice of Intent/Notice of Preparation is the first step in […]

  • 19 May 2015
    Business & Finance

    A Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) has been prepared for the U.S. Army Corps of Engineers, City of Solana Beach & City of Encinitas Coastal Storm Damage Reduction Project to identify and evaluate the potential environmental impacts of the proposed project. The EIS is being filed with the Environmental Protection Agency and is […]

  • 24 April 2017
    Business & Finance

    The Port of Los Angeles and USACE have prepared a Draft Environmental Impact Statement/Report (EIS/EIR) for the container terminal located at Berths 226-236 on Terminal Island at the Port of Los Angeles, operated by Everport Terminal Services, Inc. The proposed project would improve the container-handling efficiency and capacity of the existing terminal to accommodate the […]

  • 6 May 2014
    Business & Finance, Equipment, Technology

    The Port of Los Angeles and U.S. Army Corps of Engineers have prepared a Draft Environmental Impact Statement/Report (EIS/EIR) for the Yusen Terminals Inc. (YTI) Container Terminal Improvements Project, located at Berths 212-224 at the Port of Los Angeles, on the north side of Terminal Island along the Cerritos Channel, near the East Basin. The […]

  • 9 July 2017
    Business & Finance

    The U.S. Army Corps of Engineers has prepared a joint Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Encinitas and Solana Beach Coastal Storm Damage Reduction Project. According to the Corps, the EIS/EIR report will evaluate potential options for reducing storm damage related coastal erosion over a 50-year period anticipated to occur from 2018 through […]

  • 19 December 2011

    The Port of Los Angeles and U.S. Army Corps of Engineers have prepared a Draft Environmental Impact Statement/Report (EIS/EIR) for the Berths 302-306 APL Container Terminal Project that involves the improvement and expansion of the existing 291-acre terminal by 56 acres. APL operates the second largest container terminal at the Port of Los Angeles. The […]

  • 13 August 2014
    Business & Finance, Equipment, Technology

    The Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for the San Elijo Lagoon Restoration Project (SELRP) is now available for public review and comment. The proposed project requires evaluation pursuant to both CEQA and the National Environmental Policy Act (NEPA) because of federal, state, and local discretionary actions. Given the proposed project’s complexity and range […]

  • 14 January 2015
    Business & Finance

    The U.S. Army Corps of Engineers’ first public workshop on the Sacramento River Bank Protection Project will begin today, January 14, at 4:00pm in the Arthur F. Turner Community Library, West Sacramento. The release of the Sacramento River Bank Protection Project (SRBPP) Draft Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) is not only a major milestone, but also a […]

  • 4 November 2019
    Business & Finance

    Two public meetings on the Draft Integrated Feasibility Report (Integrated Feasibility Study/Environmental Impact Statement/Environmental Impact Report) for the Port of Long Beach Deep Draft Navigation Study will be held on Wednesday, November 13, 2019, at the Port of Long Beach Administration Building in Long Beach, CA. The Draft IFR EIS/EIR has also a review period […]

  • 14 February 2013
    Business & Finance

    Taylor Engineering will prepare technical components of the Jacksonville Harbor Deepening Environmental Impact Statement and the accompanying air quality evaluation. The EIS will evaluate effects of deepening the first 14 miles of the St. Johns River channel from 40 feet to alternative depths up to 50 feet. Taylor staff will work in conjunction with USACE […]

  • 22 February 2013
    Business & Finance

    The Los Angeles Harbor Commission has approved a resolution initiating an Environmental Impact Statement/Environmental Impact Report (EIS/EIR) on a proposed berth-improvement project by Yusen Terminals Inc. (YTI). Start of the EIR process is the first step in YTl’s proposed plan to deepen and improve its terminal facilities, allowing the terminal operator to accommodate next-generation vessels […]

  • 5 May 2015
    Business & Finance

    The Final Environmental Assessment/Environmental Impact Report (EA/EIR) for the Maintenance Dredging of the Federal Navigation Channels in San Francisco Bay, Fiscal Years 2015-2024 and Response to Comments has been released and is available online. The United States Army Corps of Engineers (USACE) and San Francisco Bay Regional Water Quality Control Board (Regional Water Board) prepared […]

  • 7 March 2019
    Business & Finance

    The U.S. Army Corps of Engineers will have public meetings to discuss the Prado Basin Ecosystem Restoration and Water Conservation Study. The meetings are scheduled for today, at 2:00 p.m. and 6:00 p.m. (Pacific Standard Time) at the Prado Dam Resident Office visitor center, 2493 Pomona-Rincon Road, Corona, California. Col. Aaron Barta, commander of the […]

  • 14 October 2015
    Business & Finance

    The U.S. Army Corps of Engineers, Los Angeles District, in conjunction with the City of Los Angeles, released the Los Angeles River Ecosystem Restoration Study final Integrated Feasibility Report for state and agency review. This report includes a Final Feasibility Study (FS) and Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Restoration Study, Los Angeles […]

  • 18 November 2019
    Business & Finance

    Col. Aaron Barta, commander of the U.S. Army Corps of Engineers Los Angeles District, along with representatives from the Corps LA District’s project delivery team and the Port of Long Beach officials, held a public meetings November 13 at the Port of Long Beach Administration building in Long Beach, California. Representatives from both the Corps […]

  • 5 November 2020
    Technology

    Amanda Phillips, PE, has rejoined Neel-Schaffer, Inc. and will serve as a Senior Coastal Engineer and Project Manager based in the firm’s Mandeville office. Phillips previously worked for Neel-Schaffer in 2015. She has nearly 20 years of experience and will be part of Neel-Schaffer’s Coastal Science and Engineering department. Also, she has extensive experience in […]

  • 14 September 2020

    Voor onze dredging projecten zijn wij voor op onze werkschepen/multicats op zoek naar een Chief Engineer:  In bezit van geldige COC als HWTK , en medische keuring Verder: Geldige BASIC SAFETY / Advanced Firefighting / Proficiency in survival craft /rescue boats of REFRESHERS van deze certificaten , eventueel HIGH VOLTAGE certificaat – Bekend met SOPEP/ISM/MLC/MARPOL […]

  • 3 August 2016
    Business & Finance

    The 8th International Conference on Scour and Erosion, ICSE 2016, will take place in Oxford, UK from 12-15 September. The conference, being organized by HR Wallingford this year, will provide a platform for scientists and engineers from around the world to exchange ideas and share advances in research and practice on the scientific and engineering challenges related to scour and […]

  • 2 November 2020
    Operations & Maintenance

    The U.S. Army Corps of Engineers, Buffalo District has announced the completion of armor stone placing at the Buffalo confined disposal facility (CDF) #4. According to the Corps, the contractor – Luedtke Engineering Co. competed armor stone placing on October 27, 2020. This is the third contract in recent years to rehabilitate the outer dike […]

  • 28 September 2020
    Business development

    Royal HaskoningDHV and Delft University of Technology (TU Delft) have agreed to further strengthen their existing collaboration. To this effect, a Memorandum of Understanding was signed last Thursday by Royal HaskoningDHV CEO, Erik Oostwegel, and Delft University of Technology President and Rector Magnificus, Tim van der Hagen. Commenting the latest announcement, Erik Oostwegel said: “This […]