Search results for: Half Tide Tug

4 results

A list of search results

  • 5 June 2019
    Business & Finance

     The North Queensland Bulk Ports Corporation (NQBP) has successfully completed repair and maintenance work on the public boat ramp and floating walkway at Half Tide Tug Harbor in Hay Point. The harbor includes a public boat ramp and a floating walkway for recreational vessels up to 7.5m in length. At high tide, the 2.4m […]

  • 14 May 2019
    Business & Finance

    North Queensland Bulk Ports Corporation (NQBP) has unveiled a plan to conduct maintenance and repair works at Half Tide Tug Harbor from May 16-22.  According to the NQBP’s official announcement, the works will include: Boat ramp excavation works These maintenance works, aimed to improve access for recreational boaters, will be undertaken using a land-based long […]

  • 31 October 2014
    Business & Finance

    Half Tide Tug Harbor breakwater sustained damage during Tropical Cyclone Dylan at the beginning of the year. Repair works were completed on time and within budget. Approximately 10,000 tonnes of armor rock was relocated from the DBCT Quarry stockpile area near the Hay Point Lookout on Horyu Maru Drive directly to the breakwater. An additional 5,000 […]

  • 5 July 2011
    Business & Finance, Equipment, Technology, Vessels

      Damen Shipyards have delivered the ASD tugs ‘Karloo’ and ‘Kalarka’ to Half Tide Marine Pty Ltd of Australia. The tugs were built to the highly successful ASD Tug 3111 design, which in common with most Damen vessels, has been the subject of constant research and improvement. Including ‘Karloo’ and ‘Kalarka’, Damen has delivered twenty […]