Search results for: Intracoastal Waterway

3033 results

A list of search results

  • 23 March 2016
    Business & Finance, Project & Tenders

    The dredging of two critical reaches in the Atlantic Intracoastal Waterway near Breach Inlet, off Sullivan’s Island and the Isle of Palms, and Jeremy Creek in McClellanville has been completed. The Wilco, an 18 inch cutterhead dredge, owned and operated by Southwind Construction, was hard at work in the waters, making the waterway safer for passage […]

  • 24 September 2015
    Business & Finance

    The U.S. Army Corps of Engineers, Galveston District, has awarded a contract to SOL Engineering Service LLC for environmental services to include the collection and analyses of water and sediment samples from the federally-maintained Gulf Intracoastal Waterway’s Channel to Victoria Middle Reach. According to Lisa Finn, an environmental project manager with the USACE Galveston District’s […]

  • 13 April 2014
    Business & Finance, Equipment, Technology

    The U.S. Army Corps of Engineers, Galveston District, awarded a contract in the amount of $6,318,000 to Goodloe Marine Inc. to perform maintenance dredging within the Gulf Intracoastal Waterway, between Turnstake Island and Live Oak Point, in Calhoun, Aransas and San Patricio counties, Texas. The contractor is required to remove approximately 1.6 million cubic yards […]

  • 12 September 2018
    Business & Finance

    The Florida Inland Navigation District will be receiving sealed bids for the construction of the Intracoastal Waterway Maintenance Dredging project at its offices in Jupiter, Florida until 2 PM, October 4, and then the bids will be publicly opened. “The District will award the project to the qualified, responsible, and responsive bidder presenting the lowest […]

  • 20 March 2019
    Business & Finance

    Exchange Club Park, located along the Intracoastal Waterway in north Pompano Beach, Florida, will be closed to the public during a maintenance dredging project that the City of Lighthouse Point is carrying out in some of its residential canals, according to the Point! Publishing latest announcement.  The dredging project is just getting underway and is […]

  • 1 December 2011

    The Coast Guard has announced that dredging is scheduled to begin today within the Atlantic Intracoastal Waterway Federal Channel near Shallotte Inlet Crossing in Brunswick County, N.C. The project will continue 24 hours a day until Jan. 1, 2012. Dredge operators will monitor VHF-FM channels 13 and 16 to coordinate passage. Floating rubber and submerged […]

  • 31 July 2019
    Business & Finance

    The U.S. Army Corps of Engineers awarded a $5.9 million maintenance dredging contract earlier this week for portions of the Intracoastal Waterway (IWW) in St. Johns and Flagler counties to Southwind Construction Corporation of Evansville, Indiana. It is expected that the dredging operations will start in September and take approximately six months to complete. The work […]

  • 1 August 2014
    Business & Finance, Equipment, Technology

    The U.S. Army Corps of Engineers, Jacksonville District, has presented a plan for the Intracoastal Waterway – Jacksonville to Miami maintenance dredging project. This deepening scheme will involve removal of approximately 308,000 cubic yards of shoaled material from the Intracoastal Waterway Indian River Reach 1 to a required depth of 12-ft plus 2-ft allowable overdepth […]

  • 2 September 2014
    Business & Finance, Equipment, Technology

    The U.S. Army Corps of Engineers and its contractor are restoring marsh on Ring Island near Stone Harbor, N.J. as part of a demonstration project. USACE and its contractor are dredging the New Jersey Intracoastal Waterway and beneficially using the material to restore marsh land and critical ecological habitat owned and managed by the state […]

  • 18 November 2011

    The banks of the Atlantic Intracoastal Waterway (AIWW), an artificial channel running through Georgia’s marshes behind the barrier islands…   By Michael Sullivan (thecreativecoast) [mappress] Source: thecreativecoast, November 18, 2011; Image: skio

  • 15 July 2010
    Project & Tenders

    The U.S. Army Corps of Engineers, Wilmington Office requires a contract to provide Maintenance Dredging Atlantic Intracoastal Waterway Various Location, Hobucken and Core Creek Land Cuts and Bogue Inlet to Shallotte Inlet, Wilmington, North Carolina. The contract will be Firm Fixed Price. Work consists of the removal and placement of approximately 800,000 cubic yards of […]

  • 14 February 2010
    Project & Tenders

    While the U.S. Army Corps of Engineers dredged the Atlantic Intracoastal Waterway, the Point at Emerald Isle gained beachfront. [mappress] Sourcecarolinacoastonline:,February 12,2010

  • 21 January 2020
    Business & Finance

    U.S. Senators Marco Rubio and Rick Scott recently wrote to R.D. James, the Assistant Secretary of the Army – Civil Works, ahead of the Army Corps Engineers finalizing their Fiscal Year 2020 work plan, to ensure that all proposed and ongoing projects in Florida receive full and fair consideration. This includes maintaining record progress towards […]

  • 6 March 2018
    Business & Finance

    The U.S. Army Corps of Engineers, Galveston District, announces the release of the Draft Integrated Feasibility Report and Environmental Impact Statement (DIFR–EIS) for the Recommended Plan of the Gulf Intracoastal Waterway (GIWW): Brazos River Floodgates (BRFG) and Colorado River Locks (CRL) Systems Feasibility Study, Brazos and Matagorda Counties, TX. The DIFR–EIS documents the existing condition […]

  • 5 April 2013
    Business & Finance

    The U. S. Army Corps of Engineers, Galveston District Office, announced a contract for the provision pipeline dredging to remove approximately 2,000,000 cubic yards of maintenance material from the Gulf Intracoastal Waterway, Texas, Port O’Connor to Rockport in Calhoun and Aransas Counties, Texas. Placement will be in beneficial use sites or into the open water. […]

  • 28 November 2012
    Business & Finance

    On behalf of the Florida Inland Navigation District, Taylor Engineering will support a proposed project that would deepen the Intracoastal Waterway in vicinity of Ponce de Leon Inlet in Volusia County and deposit the dredged material within the constructed MSA 434 dredged material management area facility. This project construction will result in approximately 216,000 cubic […]

  • 5 February 2019
    Business & Finance

    Congressman Lee Zeldin was joined by Brookhaven Town Supervisor Ed Romaine, Brookhaven Deputy Town Supervisor and Councilman Dan Panico, stakeholders and local residents at Webby Beach in Center Moriches yesterday to announce the completion of the dredge of the Long Island Intracoastal Waterway. During the event, Congressman Lee Zeldin said: “Coming on the heels of […]

  • 17 March 2011

    The U.S. Army Corps of Engineers, Galveston District, awarded a contract, March 11, to Port Lavaca-based King Fisher Marine Service… (dvidshub) [mappress] Source: dvidshub, March 17, 2011;    

  • 21 July 2010

    The cleanup of wetland vegetation covered by dredge material after a spill four years ago should be completed by early next year, … By Shakaya Andres (jacksonville) [mappress] Source: jacksonville, July 21, 2010;

  • 26 January 2011

    Dredging has been completed in the Intracoastal Waterway in Palm Beach and West Palm Beach, Fla., increasing mean low water depths to 10 … (fangaroo) [mappress] Source: fangaroo, January 27, 2011;

  • 14 February 2018
    Business & Finance

    The U.S. Army Corps of Engineers is completing a Dredge Readiness and Operations Plan (DROP) for the 160-mile Gulf Intracoastal Waterway (GIWW) to Anclote River. According to the Corps, the plan will outline maintenance dredging locations and anticipated completion timeframes for identified dredging priorities. It is anticipated that all required dredging will take place over […]

  • 24 September 2018
    Business & Finance

    Goodloe Marine Inc., from Wimauma, Florida, has won a $9.3 million contract for the Atlantic Intracoastal Waterway maintenance dredging project. Bids were solicited via the internet with three received, reports the U.S. Department of Defense (DoD). Work will be performed in Charleston, South Carolina, with an estimated completion date of November 30, 2019, according to DoD. The U.S. Army […]

  • 23 December 2010

    The annual dredging has begun at the Jupiter Inlet. They will be cleaning out the traps in the inlet and Intracoastal waterway, then dumping… By James Wieland (wptv) [mappress] Source: wptv, December 23, 2010;

  • 22 January 2016
    Business & Finance

    Phase One of the America’s WETLAND Foundation (AWF) Gulf Intracoastal Waterway (GIWW) Shoreline Stabilization and Restoration Project is complete. One mile of Vegetated EcoShield™ has been installed and planted to create habitat and to provide protection from storm surge for the community of Larose and for critical energy infrastructure. Phase One of the project stabilizes […]

  • 7 June 2017
    Business & Finance, Project & Tenders

    The U.S. Army Corps of Engineers, Fort Worth District, recently awarded RLB Contracting Inc. a $5.3 million maintenance dredging contract for the Gulf Intracoastal Waterway, Texas Main Channel Across San Antonio Bay. The contract, announced on the fbo.gov website, includes maintenance pipeline dredging of approximately 1,346,000 Cubic Yards (CY) of material from the GIWW. Under the […]

  • 15 August 2013
    Business & Finance

    The U.S. Army Corps of Engineers, Jacksonville District, will host a series of four public meetings to explain revised setback guidance to be used in the review of structures proposed for placement along certain federal channels. Identical meetings will be held on each of the following dates, with all meetings beginning at 6:30 p.m.: Monday, […]