Search results for: Lindsay Concrete Products

4461 results

A list of search results

  • 31 July 2015
    Business & Finance, Project & Tenders

    The U.S. Army Corps of Engineers (USACE), Buffalo District, is working on the Cleveland Harbor East Breakwater project to repair the $31 million worth of damages caused by Superstorm Sandy, October 2012. Repair work to the 4,275 linear feet of breakwater is being completed by Great Lakes Dock & Materials L.L.C. and includes the placement of […]

  • 25 June 2015
    Business & Finance, Equipment, Technology

    The Cleveland Harbor East Breakwater Project, aimed to repair the $24.9 million worth of damages caused by Superstorm Sandy in October 2012, is moving forward. Repair work to the 3,200 linear feet of breakwater is being completed by Great Lakes Dock & Materials L.L.C., Muskegon, MI and includes the placement of armor stone as well as […]

  • 24 June 2015
    Business & Finance

    The U.S. Army Corps of Engineers, Buffalo District, has begun repair work to the Cleveland Harbor East Breakwater to repair the $24.9 million worth of damages caused by Superstorm Sandy, October 2012. Repair work to the 3,200 linear feet of breakwater is being completed by Great Lakes Dock & Materials L.L.C., Muskegon, MI and includes […]

  • 24 August 2015
    Business & Finance, Project & Tenders

    The U.S. Army Corps of Engineers (USACE), Buffalo District has begun works on the Cleveland Harbor East Breakwater to repair the $31.4 million worth of damages caused by Superstorm Sandy, October 2012. Repair work to the 4,275 linear feet of breakwater is being completed by Great Lakes Dock & Materials L.L.C., Muskegon, MI and includes […]

  • 11 September 2015
    Business & Finance

    Poundfield Products of Ipswich in Suffolk has recently been awarded its largest ever contract with a £2 million order for decorative, reinforced concrete panels from County Durham based Hall Construction Services. Obtained by Poundfield’s bespoke products division, the order covers the manufacture of nearly 4000 individual pieces which are now being used to construct over […]

  • 8 May 2017
    Business & Finance

    Concrete blocks at Avon Beach will be moved as part of beach replenishment works in June 2017, reports the Christchurch Borough Council. The concrete blocks were installed at Avon Beach as temporary flood defenses in November 2016 and will form part of permanent promenade improvement works due to be carried out in Autumn 2017, subject to […]

  • 27 September 2019
    Business & Finance

    The Levvel consortium (BAM, Van Oord and Rebel) inaugurated the Levvel-blocs production facility in Harlingen today. The facility is producing the concrete armor units that will reinforce the Afsluitdijk Dam in the years ahead. Provincial executive councillor Avine Fokkens (Province of Fryslân), performed the opening ceremony. “The province is happy that Fryslân has a factory […]

  • 14 November 2013
    Business & Finance, Equipment, Technology

    Jade Software’s port management software, Master Terminal has been selected by one of Africa’s busiest port operators, Ghana Ports and Harbours Authority, to operate two of the continents major sea ports. Ghana’s Tema and Takoradi ports which are some of the busiest terminals in West Africa are strategically located close to shipping routes and major […]

  • 9 June 2015
    Business & Finance, Equipment, Technology

    Lakelands Concrete Products, located in Livingston County (Lima, NY), is in the midst of a high profile project producing almost 1,000 precast concrete dolosse to be used for the Port of Oswego breakwater/shoreline protection program.   These 32,000 pound a piece concrete structures were designed by the U.S. Army Corps of Engineers to help rebuild and protect the Port of […]

  • 21 September 2018
    Business & Finance, Project & Tenders

    September and October – under the New IJmuiden Sea Lock project – will be dominated by the sinking operation of the lock gate chamber of the outer head and by the construction of the walls of the flood defense, reports the Port of Amsterdam. The port also added that the OpenIJ concrete mixing plant will be […]

  • 14 January 2013
    Business & Finance

    Lindsay Island in the Murray Sunset National Park will be Victoria’s first project to recover water for the environment using the Murray Darling-Basin Plan adjustment mechanism. Under the Basin Plan, states can put forward projects to recover water for the environment through environmental works and measures using funds that had been allocated for buyback. Federal […]

  • 6 July 2020
    Infrastructure, Vessels

    Faasse Dredging BV has converted the former freighter “MS Mandeo” into the trailing suction hopper dredger “Schenge”. At the end of June, the “Schenge” successfully completed its first dredging work. For the conversion of the “Schenge”, the Faasse Groep has contracted Holland Shipyards Group and Bakker Sliedrecht. The engineering and production of the dredging system […]

  • 14 December 2011

    Cleanup work on a three-mile stretch of the Tittabawassee River along the Dow Chemical Co. plant in Midland is scheduled to …   By Lindsay Knake (mlive) [mappress] Source: mlive, December 14, 2011;

  • 15 August 2011

    Sand is pumping onto Fort Myers Beach much slower than expected this summer. More info: news-press BY LINDSAY DOWNEY [mappress] Source: news-press, August 15, 2011

  • 27 November 2012
    Business & Finance, Equipment, Technology

    Quality Positioning Services (QPS) has signed an original equipment manufacturer (OEM) agreement with Esri, the world leader in GIS technology. The agreement enables QPS to bundle its QINSy and Fledermaus products with Esri software and provide a complete hydrographic survey, data management, and charting solution. “This worldwide OEM agreement with Esri allows us to provide […]

  • 22 September 2017
    Business & Finance, Project & Tenders

    Bouygues recently released a video about the Calais Port 2015, one of the decades most important French infrastructure project. One of the main features of this capital development project is creation of a new 3 kilometer seawall. In the video, Bouygues, the main contractor for this project, identified the Xblocs as the key to the success of […]

  • 21 October 2011

    Four feet could make a big difference for Bayshore Concrete Products and its hometown of Cape Charles. The precast concrete manufacturer wan… By Josh Brown (hamptonroads) [mappress] Source: hamptonroads, October 21, 2011;

  • 16 August 2011

    The U.S. Environmental Protection Agency is seeking public comment on the Segment 1 cleanup of the Tittabawassee River.   More info: (mlive) By Lindsay Knake [mappress] Source: mlive, August 16, 2011

  • 19 July 2011

    The Environmental Protection Agency is developing a plan to clean up the Tittabawassee River adjacent to the Dow Chemical Co.’s Midland … By Lindsay Knake (mlive) [mappress] Source: mlive, July 19, 2011;

  • 6 August 2015
    Business & Finance

    Construction on long-awaited flood alleviation schemes in Louth and Horncastle is set to start this month. Planning permission for both schemes has been granted, archaeological surveys of the sites are being carried out, and construction will begin shortly. The £6.5m Louth project and the £8.1m Horncastle project are funded and delivered by a partnership of […]

  • 14 December 2011

    Dredging the Chico river from siltation will result to revenue generation derived from agriculture particularly from rice farming. This is the contention of the chairman of the Kalinga Hybrid Seeds Producers Cooperative. Dr. Jaime Almora, in his proposal to dredge a 24-kilometer stretch of the Chico river from Calanan to Cabaruan, estimated that P240 million […]

  • 25 March 2011
    Business & Finance

      BHP Billiton Chairman, Jac Nasser, today announced that Mr Alan Boeckmann will retire from the Board and Mr Lindsay Maxsted will be appointed as an independent Non-executive Director, both effective as of today. Mr Maxsted is Chairman of infrastructure company, Transurban Group, and a Non-executive Director of Westpac Banking Corporation, where he is Chairman […]

  • 29 August 2011

    The marina in Hannibal will get a facelift pretty soon… By Lindsey Boetsch (connecttristates) [mappress] Source: connecttristates, August 29, 2011;

  • 30 October 2015
    Business & Finance, Equipment, Technology

    Tomlinson Group, an Ottawa based company involved in quarrying, construction, trucking and environmental industries, has released a video about their Harvey Pit DSC Shark Class dredge and its sand plant. The video covers the entire production process, from initial dredging to final product. The sand that is being dredged from 65 ft below is processed in many […]

  • 16 May 2018
    Business & Finance, Project & Tenders

    The largest accropode ever to have been produced by automated factory process has been successfully completed in Aberdeen. The temporary building, which is 15 meters high and 120 meters long, has been specially constructed to support the £350 million Aberdeen Harbor Expansion Project, which is due for completion in 2020. The facility is home to […]

  • 17 March 2015
    Business & Finance

    Although planning permission has already been granted for beach replenishment work that would take material from the sand bar off Mudeford Quay and spread it on Christchurch beaches, a new method of working is now being proposed which would be more beneficial. The original proposal may have caused difficulties for vessels getting in and out […]