Search results for: Narrow River

131 results

A list of search results

  • 20 December 2018
    Business & Finance, Project & Tenders

    Work has been ongoing for about two weeks now along the Narrow River as part of the salt marsh restoration and elevation pilot project. The contractor, Patriot Marine has been dredging down near Sedge Island since the start of December. The crew is approximately one-third of the way dredging one of the sections planned for […]

  • 12 December 2016
    Business & Finance

    Work has been ongoing since December 1 along the Narrow River as part of the salt marsh restoration and elevation pilot scheme, State of Rhode Island official website said in its latest project update. The contractor, Patriot Marine, has been dredging down near Sedge Island. The crew is approximately one-third of the way dredging one of […]

  • 27 February 2020
    Business & Finance

    Chairman of the Paradip Port Trust, Shri Rinkesh Roy, announced today the completion of dredging operations at Mahanadi River Mouth. This work was carried out by a dredger of Dredging Corporation of India Ltd. Chairman, of the PPT during his interaction with the Press today informed that there is a narrow window period between January […]

  • 14 November 2018
    Business & Finance

    Kent Narrows Federal Channel maintenance dredging project is underway, according to the USCG Notice to Mariners. In the notice, the USCG announced that the Corman Kokosing is conducting dredging operations on behalf of Queen Anne’s County near the intersection of the Chester River and Kent Island Narrows at the Kent Narrows Federal Channel. During the works, […]

  • 7 May 2018
    Business & Finance

    The U.S. Army Corps of Engineers, Los Angeles District, has issued a Public Notice for the Draft EA for the Los Angeles River Channel Reach 5C & 6A Accumulated Material Removal Project. USACE conducted an engineering review of the Glendale Narrows in 2016 to assess the flood conveyance capacity in anticipation of large rainfall associated with […]

  • 21 March 2018
    Business & Finance

    An ambitious project to return the River Ver to its more natural state as it runs through the center of St Albans has been launched, according to the City and District Council. The plan will include significant enhancements to Verulamium Park and the water quality of its artificial lakes. Major improvements will also be made to […]

  • 23 February 2018
    Business & Finance

    The Bureau of Land Management (BLM) Pinedale Field Office and the Wyoming Game and Fish Department (WGFD) are proposing a project that will improve stream and riparian habitat and boating access on the New Fork River near Pinedale. The restoration project is located on the New Fork River at the “old” boat ramp site referred […]

  • 23 February 2018
    Business & Finance

    Atkins, a member of the SNC-Lavalin Group, has won a $3.2 million contract for the Truckee River Flood Management Project in Nevada. Under the agreement, the company will provide engineering and economic analysis services for the project, which mark the first phase of this scheme and is considered the most critical phase. With the overall Truckee […]

  • 14 February 2018
    Business & Finance

    The U.S. Army Corps of Engineers, Baltimore District, has awarded a $1.4 million contract for the maintenance dredging of Knapps Narrows Federal Navigation Channel near Tilghman Island to Southwind Construction of Evansville, Indiana. The project will consist of the removal roughly 100,000 cubic yards of material from the channel to restore it to its authorized depth […]

  • 25 January 2018
    Business & Finance

    The U.S. Army Corps of Engineers has announced the availability of a draft Environmental Assessment for the Los Angeles River Channel at Glendale Narrows – Reach 5C and Reach 6A Accumulated Material Removal Project. The proposed project entails removal of approximately 40,000 cubic yards of accumulated material (sediment, cobbles, and boulders) from Reach 5C and […]

  • 13 October 2017
    Business & Finance

    The U.S. Army Corps of Engineers, Los Angeles District, announced recently that the repairs of damaged embankment and levee toe within the Glendale Narrows section of the Los Angeles River Flood Control Channel at Reach 4D have been completed ahead of schedule. According to the Corps, JF Engineering completed the repairs of the critical levee structure in late […]

  • 8 September 2017
    Business & Finance, Project & Tenders

    The U.S. Army Corps of Engineers, Los Angeles District, has just released the latest update on the Los Angeles River Levee Wall Repair project. This week, the contractor, JF Engineering was working in full force to complete the critical levee repair before the start of the 2017 to 2018 storm season, reported the Corps. “The second […]

  • 20 August 2017
    Business & Finance, Project & Tenders

    The U.S. Army Corps of Engineers’ contractor, JF Engineering is continuing the work to repair the damaged embankment and levee toe within the Glendale Narrows section of the Los Angeles River Flood Control Channel at Reach 4D. Last week, the contractor was placing the last lift of grout to complete the grouted stone embankment. The grouted […]

  • 10 August 2017
    Business & Finance, Project & Tenders

    Work to repair of damaged embankment and levee toe within the Glendale Narrows section of the Los Angeles River Flood Control Channel at Reach 4D is in full swing, reported the U.S. Army Corps of Engineers. The Corps, Los Angeles District, yesterday released a few photos of the ongoing work. JF Engineering, the contractor for the project, […]

  • 3 July 2017
    Business & Finance, Project & Tenders

    The U.S. Army Corps of Engineers’ contractor, JF Engineering, continues to work hard to repair of damaged embankment and levee toe within the Glendale Narrows section of the Los Angeles River Flood Control Channel at Reach 4D. Last week, the contractor finished moving derrick stone along the East bank grouted stone toe to install the […]

  • 27 June 2017
    Business & Finance

    The Minnesota Department of Natural Resources (DNR) has released an environmental assessment worksheet for a proposed construction project to widen and manage flow rates for a section of the Mississippi River channel near Hastings that has narrowed with sediment build up.  Changing sediment patterns have made it difficult and costly to maintain safe navigation through […]

  • 23 June 2017
    Business & Finance

    U.S. Army Corps of Engineers recently awarded a contract for like-for-like repair of damaged embankment and levee toe within the Glendale Narrows section of the Los Angeles River Flood Control Channel at Reach 4D. In order to conduct the repair, a limited portion of the channel will be dewatered. Approximately 3,000 square feet of vegetation […]

  • 8 June 2017
    Business & Finance

    U.S. Senator Chris Van Hollen, member of the Senate Appropriations Committee, wrote to the U.S. Army Corps of Engineers expressing his support for funding to dredge the Knapps Narrows navigation channel in Tilghman, Maryland. “This navigation project is extremely important to Maryland’s economy,” Senator Van Hollen wrote in a letter to Lieutenant General Todd J. […]

  • 9 January 2017
    Business & Finance

    The Environment Agency, the Box Moor Trust and the Chilterns Chalk Stream Project are working together to restore a 1km length of the River Bulbourne between the Grand Union Canal and Two Waters Road, Hemel Hempstead. According to the Chilterns, the scheme will restore the Bulbourne at Box Moor to a more natural chalk stream, create […]

  • 22 July 2016
    Business & Finance

    The U.S. Army Corps of Engineers, Los Angeles District, will be holding a public forum to discuss topics of interest relating to the Corps’ activities along the Los Angeles River and specifically, within the area referred to as “Glendale Narrows.” The meeting, set for August 1, 2016, in Los Angeles, California, will include a presentation on […]

  • 10 June 2016
    Business & Finance

    Delft University of Technology has just released a very interesting video about an experiment on how rivers behave, what determines their shape and what is the role of vegetation in the development of riverbanks. The experiment was conducted by Andrés Vargas Luna, PhD Hydraulic Engineering TU Delft. The two principal changes that determine the shape of a […]

  • 14 January 2016
    Business & Finance

    The USACE awarded a $1.3 million contract to JF Engineering on January 9 to install roughly 3 miles of temporary protective barriers to increase bank height along the most vulnerable reaches of the LA River that will restore channel capacity and reduce the risk of flooding to homes and businesses. The Corps conducted a review of […]

  • 16 November 2015
    Business & Finance, Project & Tenders

    The Ilocos Sur provincial government and a Taiwanese mining firm have just signed an agreement for the immediate dredging of the narrow and silted Abra River which threatens low-lying areas in Metro Vigan, the Philippines. Raymund Sinay, Environment and Natural Resources Management Officer, said that a monitoring and assessment of the Environmental Management Bureau of […]

  • 19 October 2015
    Business & Finance

    The first phase of the Grohman Narrows Channel Improvement Project is almost complete. The project team has now finalized a number of studies related to the potential improvements at Grohman Narrows. A supplementary set of studies was also completed as a result of feedback from elected officials, First Nations, stakeholders and the community. Regarding this, […]

  • 4 September 2015
    Business & Finance

    The schemes on the River Blackwater at Bocking have been designed to reduce erosion and flood risk, improve fish habitat and the overall ecology of the river. The first project, led by the Environment Agency, began in April 2014, and work was carried out over a 2 week period in March 2015. The latest scheme, […]

  • 5 May 2015
    Business & Finance

    The Coast Guard is urging mariners to use extreme caution while transiting the Merrimack River entrance due to significant shifting and shoaling between the #2 red and #3 green buoys. Several recent accidents and near misses on the narrow, heavily congested portion of the Merrimack River have created a major safety concern. To help ensure […]

  • 5 January 2015
    Business & Finance

    The Canal and River Trust will host a consultation meeting about the Montgomery Canal restoration plans at the Llanymynech Village Hall between 10.00 am and 2.00pm on Saturday, January 10. “We are hosting a public meeting in the Carreghofa – Llanymynech – Pant area to give canal enthusiasts and local residents a say on the type […]

  • 6 May 2014
    Business & Finance, Equipment, Technology

    The U.S. Environmental Protection Agency said that dredging operations are expected to resume tomorrow in the Upper Hudson River. In 2014, dredging will begin south of Schuylerville, New York and proceed south towards Troy. Dredging will also occur in a two-mile section of river near Fort Miller that is not easily accessed by boat. Dredging […]

  • 10 April 2014
    Business & Finance, Equipment, Technology

    The U.S. Army Corps of Engineers and the New Jersey Department of Environmental Protection are currently evaluating several flood risk management alternatives for the Rahway River Basin, with the preliminary findings to be shared with area residents at two public information sessions to be scheduled in late May or early June 2014. Included in the […]