Search results for: New Haven

355 results

A list of search results

  • 14 May 2020
    Business & Finance

    Lt. Gen. Todd T. Semonite, USACE Commanding General and 54th U.S. Army Chief of Engineers, has signed the New Haven Harbor Navigation Improvement Project Chief’s Report. The existing New Haven Harbor deep draft ship channel, turning basin, and maneuvering area are currently authorized at a depth of -35 feet at mean lower low water (MLLW). […]

  • 20 December 2019
    Business & Finance

    The U.S. Army Corps of Engineers, New England District, is currently working on a Coastal Storm Risk Management feasibility study in Fairfield and New Haven Counties, Connecticut and has developed a recommended draft plan for the “Long Wharf” area in New Haven. The non-Federal project partner for the study is the Connecticut Department of Energy […]

  • 27 February 2019
    Business & Finance

    The Connecticut’s City of New Haven – Parks and Engineering Department is seeking a permit from the USACE’s New England District to conduct work in conjunction with beach nourishment in New Haven, CT. According to an official announcement, the work is proposed in Long Island Sound in New Haven Harbor at 60-168 Townsend Avenue in […]

  • 5 November 2018
    Business & Finance

    Public comments on the New Haven Harbor Connecticut Navigation Improvement Project Draft Integrated Feasibility Report and Environmental Impact Statement are due to the Corps of Engineers by November 15, 2018. The study is sponsored by the U.S. Army Corps of Engineers’ New England District and the Connecticut Port Authority. USACE said that a Draft Integrated Feasibility Report […]

  • 15 October 2018
    Business & Finance

    Public hearings on the New Haven Harbor Connecticut Navigation Improvement Project Draft Integrated Feasibility Report and Environmental Impact Statement will be held on October 23-24, 2018 in West Haven and New Haven, Connecticut. The hearings are sponsored by the U.S. Army Corps of Engineers, New England District, the Connecticut Port Authority, and the New Haven […]

  • 1 October 2018
    Business & Finance

    A Draft Integrated Feasibility Report and Environmental Impact Statement (D-IFR/EIS) has been prepared as part of the New Haven Harbor Navigation Improvement Project Study (NHHNIP), the U.S. Army Corps of Engineers’ New England District said in its latest post.  To facilitate efficient and safe navigation and marine commerce in New Haven Harbor in New Haven, […]

  • 10 January 2018
    Business & Finance

    A public information meeting on the status of the New Haven Harbor Navigation Improvement Feasibility Study and Environmental Impact Statement (EIS) will take place today in New Haven, Conn. The meeting, hosted by the U.S. Army Corps of Engineers’ New England District, the Connecticut Port and the New Haven Port Authorities, will provide an opportunity […]

  • 30 January 2017
    Business & Finance

    The U.S. Army Corps of Engineers, New England District and the New Haven Port Authority held a public information meeting for the New Haven Harbor Navigation Improvement Feasibility Study and Environment Impact Statement (EIS) on January 24, 2017. The public scoping meeting was for the EIS being prepared as part of the feasibility study. In […]

  • 19 January 2017
    Business & Finance

    The U.S. Army Corps of Engineers, New England District, and the New Haven Port Authority will hold a public information meeting for the New Haven Harbor Navigation Improvement Feasibility Study and Environmental Impact Statement (EIS). The meeting will be held on Tuesday, January 24th 2017, at the Hall of Records in New Haven, Connecticut. In response […]

  • 13 May 2016
    Business & Finance

    U.S. Senator Chris Murphy, a member of the U.S. Senate Appropriations Committee, yesterday applauded Senate passage of the Energy and Water Development Appropriations bill. During the Appropriations Committee markup of the bill, Murphy secured $500,000 in the bill to conduct a feasibility study to deepen New Haven Harbor – Connecticut’s largest deep water commercial industrial […]

  • 15 April 2016
    Business & Finance

    U.S. Senator Chris Murphy yesterday applauded committee passage of the Energy and Water Development Appropriations bill. Murphy secured $500,000 in the bill to conduct a feasibility study to deepen New Haven Harbor – Connecticut’s largest deep water commercial industrial port that is essential to the state’s economy. “Commercial ports and manufacturing businesses are bedrocks of Connecticut’s […]

  • 7 July 2014
    Business & Finance

    The New Haven Legislative Delegation and Governor Dannel P. Malloy, joined by state Department of Housing (DOH) Commissioner Evonne M. Klein, has announced nearly $32 million in grants for improvements to multifamily housing, infrastructure and public facilities and for planning purposes in cities and towns affected by Superstorm Sandy. The City of New Haven will […]

  • 26 May 2014
    Business & Finance, Equipment, Technology

    Repairs to the Bridgeport Harbor east and west breakwaters in Bridgeport, Connecticut, and the New Haven Harbor east, middle and west breakwaters in New Haven, Connecticut, will be completed under the terms of around $7.5 million contract awarded recently by the U.S. Army Corps of Engineers, New England District. Work will be accomplished by Mohawk […]

  • 10 February 2014

    Congresswoman Rosa DeLauro (CT-3) joined Judi Sheiffele, Executive Director of the New Haven Port Authority and Colonel Charles Samaris of the U.S. Army Corps to celebrate the impending completion of New Haven inner harbor maintenance dredging. The project, critical for local businesses, is due to be completed February 14. DeLauro played a crucial role in […]

  • 18 September 2013

    A combined maintenance dredging project at Norwalk Harbor in Norwalk, Conn., and at New Haven Harbor in New Haven, Conn., will be completed under the terms of an $8,238,900.00 contract recently awarded by the U.S. Army Corps of Engineers, New England District. Work will be accomplished by Cashman Dredging and Marine Contracting Company, LLC, of […]

  • 6 June 2013
    Business & Finance

    The U.S. Army Corps of Engineers, New England District, is issuing a pre-solicitation notice for federal maintenance dredging of New Haven and Norwalk Harbors. The proposed work consists of maintenance dredging of about 810,000 cubic yards of sediment from the 35-foot channel and 35-foot turning basin in New Haven Harbor, and about 150,000 cubic yards […]

  • 12 April 2013
    Business & Finance

    Congresswoman Rosa DeLauro (CT-3) released the following statement applauding President Obama’s inclusion of $8.6 million for New Haven harbor maintenance in his 2014 budget request. In December, DeLauro asked the Administration to include funds for the maintenance in his budget. “This is good news for New Haven and I applaud the Administration for including the […]

  • 4 February 2013

    The U.S. Army Corps of Engineers, New England District is issuing a Sources Sought Announcement for a combined maintenance dredging project located in Norwalk and New Haven harbors, Connecticut. The project is planned to be issued on or about May 2013. The construction will occur in the winter of 2013-14 and is expected to take […]

  • 1 February 2013

    The U.S. Army Corps of Engineers, New England District is proposing maintenance dredging of the New Haven Harbor Federal Navigation Project (FNP) in New Haven, Conn. The authorized project provides for a navigation channel 35 feet below mean lower low water (MLLW) from Long Island Sound to the confluence at the Quinnipiac River. In addition […]

  • 7 December 2012
    Business & Finance

    Congresswoman Rosa DeLauro (CT-3) pressed the Office of Management and Budget and the Army Corp of Engineers to include funding for New Haven harbor maintenance in next year’s budget. The New Haven harbor has not been dredged since 2004 and the need for work to be done was further heightened by Hurricanes Irene and Sandy. […]

  • 7 July 2011

    Boaters who use New Haven Harbor are protesting the U.S. Army Corps of Engineers’ plans to dump thousands of cubic yards of silt and other… (nbcconnecticut) [mappress] Source: nbcconnecticut, July 7, 2011;

  • 24 June 2011

    Some people call attention to an issue by marching in protest; this group will make its point with a flotilla of small watercraft. By Mary E. O’Leary (nhregister) [mappress] Source: nhregister, June 24, 2011

  • 26 October 2010

    The third public information meeting about a proposal to transport dredging material from Bridgeport Harbor to the waters off New Haven’s… By Meg Barone (stamfordadvocate) [mappress] Source: stamfordadvocate, October 27, 2010;

  • 5 April 2010

    NEW HAVEN — In the 1950s, during construction of Interstate 95, about 1 million cubic yards of fill was excavated from a “borrow pit” in New Haven Harbor off Morris Cove and used as fill for the newly emerging highway system… [mappress] Source:nhregister,April 5,2010;

  • 2 June 2020
    Infrastructure

    The Environment Agency has constructed over 4 kilometres of flood defences over the last 2 years in Newhaven, East Sussex. The scheme, developed in partnership with Lewes District Council, is nearing completion and is already better protecting more than 300 homes and 200 businesses from tidal flooding as seen on several occasions this winter, most […]

  • 26 August 2019
    Business & Finance

    ML (UK) Dredging team has just announced the successful completion of the Newhaven Harbor dredging project. The company reported that during the works a total of 5,500m³ of material was removed, allowing a new pontoon structure to be installed to assist the pilot boats and other commercial vessels. “Our crews battled rough seas in order […]

  • 4 June 2019
    Business & Finance

    Maintenance dredging operations in Michigan’s New Buffalo and South Haven Harbors were successfully completed last week by The King Company, Inc., the U.S. Army Corps of Engineers’ Detroit District said in their latest announcement.  “After the initial dredging excavation to establish a channel, dredging must be done periodically to keep the area clear and safe […]

  • 8 April 2019
    Business & Finance

    Tug Masters from Shoreham Port’s Marine Team completed vital seabed leveling works in nearby Newhaven Port last week.  The work was wrapped up with Acamar – a new tug boat that arrived at the port in September 2018, fitted with a seven-tonne winch for plough-dredging. Seabed leveling is a modern-day dredging technique used in ports […]

  • 16 July 2018
    Business & Finance, Project & Tenders

    The construction works continue on the Newhaven flood alleviation scheme, which is aimed to reduce the risk of flooding to approximately 430 homes and 390 businesses in and around the East Sussex. According to the Environment Agency, the works on the west bank are complete and the focus is now on the east bank. Area 1: A26 […]