Search results for: Revival

79 results

A list of search results

  • 9 August 2018
    Business & Finance, Project & Tenders

    Following the start of the Port of Dover’s iconic Dover Western Docks Revival (DWDR) development program of works back in 2014; a key milestone of having worked one million man-hours in Dover has been exceeded. To date over 15 different contractors have been involved all contributing their own specialist skills at the different stages of […]

  • 31 May 2018
    Business & Finance

    The Dover Western Docks Revival (DWDR) development project, conducted by VSBW (joint venture between VolkerStevin and Boskalis Westminster) has achieved another CEEQUAL award for sustainability in design and construction in Civil Engineering. The VSBW team and designers were presented with the ‘Excellent’ CEEQUAL Whole Team Interim Award at this year’s Annual Consultative Meeting (ACM) by CEEQUAL […]

  • 10 May 2018
    Business & Finance

    VolkerFitzpatrick has been appointed by the Port of Dover to deliver the paving, utilities and infrastructure contract for the Dover Western Docks Revival (DWDR) development. During the 12 month program, VolkerFitzpatrick will be working alongside VSBW, a joint venture between VolkerStevin and Boskalis Westminster, the dredging and marine structures’ contractor, whilst they complete the new […]

  • 6 May 2018
    Business & Finance, Project & Tenders

     The Port of Dover recently released the latest video update on Dover Western Docks Revival (DWDR) development project. The scheme is the single biggest investment ever undertaken by the Port of Dover. VSBW, the joint venture between Boskalis Westminster and VolkerStevin, was appointed in early 2017 as the main contractor for the marine engineering […]

  • 14 February 2018
    Business & Finance, Project & Tenders

     Progress continues on the Dover Western Docks Revival (DWDR) development project, according to the latest video update on the works. The scheme is the single biggest investment ever undertaken by the Port of Dover. VSBW, the joint venture between Boskalis Westminster and VolkerStevin, was appointed in early 2017 as the main contractor for the marine […]

  • 21 December 2017
    Business & Finance, Equipment, Project & Tenders, Technology

    The Port of Dover has gained industry recognition after commissioning a revolutionary temporary work system for its flagship Dover Western Docks Revival (DWDR) development. The ‘walking piling gate’, which improves the safety, environmental standards and efficiency of the construction process, has been recognized as an innovation by the Considerate Constructors Scheme (CCS), and is featured on […]

  • 27 November 2017
    Business & Finance, Project & Tenders

    The Port of Dover last Friday released the latest video update from the Dover Western Docks Revival project. The port awarded the £115m marine structures and bridge contract of this flagship development to VSBW, the joint venture between Boskalis Westminster and VolkerStevin. The first stage includes the design and construction of two new berths including quay walls and […]

  • 5 October 2017
    Business & Finance, Project & Tenders

    Port of Dover has just released a video showing how far the $330 million Dover Western Docks Revival (DWDR) project has come since the beginning of works in January 2017. According to the port, the DWDR development is the single biggest investment ever undertaken by the port and represents the next stage of its evolution. […]

  • 16 August 2017
    Business & Finance, Project & Tenders

    VSBW – a joint venture between VolkerStevin and Boskalis Westminster – is making good progress with the Dover Western Docks Revival (DWDR) project. The £250 million DWDR development is the single biggest investment ever undertaken by the port and represents the next stage of its evolution. DWDR will provide a new cargo terminal and new port-centric distribution […]

  • 11 July 2017
    Business & Finance

    The President of the Institution of Civil Engineers (ICE), Professor Tim Broyd, recently witnessed first-hand the importance of the Port of Dover to national and local economic prosperity on a special visit to the port’s flagship Dover West Revival (DWDR) development, VolkerStevin said in its latest release.  Speaking about the development, Professor Broyd said: “The […]

  • 29 June 2017
    Business & Finance, Project & Tenders

    The President of the Institution of Civil Engineers (ICE), Professor Tim Broyd has witnessed first-hand the importance of the Port of Dover to national and local economic prosperity on a special visit to the port’s flagship Dover Western Docks Revival (DWDR) development. Speaking about the development, Professor Broyd said: “The revival of the Western Docks is […]

  • 13 June 2017
    Business & Finance

    Port of Dover has just released this very interesting time-lapse video which covers the start of the Dover Western Docks Revival (DWDR) marine civil engineering construction over a six-month period (Jan 2017 – June 2017). The principal contractor, VSBW – a joint venture between VolkerStevin and Boskalis Westminster, is to deliver the marine structures and […]

  • 25 May 2017
    Business & Finance, Project & Tenders

    Piling work for the port’s flagship Dover Western Docks Revival (DWDR) development project is in full swing now, according to the Breckland Geomatics. The DWDR Principal Contractor, a joint venture between VolkerStevin and Boskalis Westminster (VSBW), has mobilized various marine equipment for the Dover scheme, including self-propelled crane barge, dredgers, split hopper barges, tugs, survey vessels, etc. Approximately one million […]

  • 27 April 2017
    Business & Finance, Equipment, Technology

    Port of Dover has just announced that the work is now underway to prepare the harbor for the piling and land reclamation phase of the port’s flagship Dover Western Docks Revival (DWDR) development. Currently, dredging activity is in operation to remove soft sediments in the harbor prior to the piling works. “We have been working […]

  • 31 March 2017
    Business & Finance, Project & Tenders

    A new marine safety exclusion zone has been established in the harbor as the Dover Western Docks Revival (DWDR) marine civil engineering project gathers momentum, reports the Port of Dover. The safety zone will provide a marked delineation between the dedicated swim and leisure zone and the marine construction area to the east of the […]

  • 6 March 2017
    Business & Finance, Project & Tenders

    Port of Dover recently announced that a consortium of leading British and European lenders has agreed a £200 million package of loans that will support the Dover Western Docks Revival project. Allianz Global Investors has agreed to provide the program with a £55 million private placement bond; RBS and Lloyds Bank have each provided a […]

  • 7 February 2017
    Business & Finance, Project & Tenders

    The first stage of construction works on the Dover Western Docks Revival (DWDR) development project starts today, according to the Dover Port. The port announced that this major stage of the construction program is now officially underway and is scheduled to be completed at the end of 2018. As the result of these works there will be some […]

  • 9 January 2017
    Business & Finance, Project & Tenders

    The first stage of the Port of Dover’s flagship Dover Western Docks Revival (DWDR) development project is now officially underway. The port recently appointed VSBW, a joint venture between VolkerStevin and Boskalis Westminster, to deliver the marine structures and bridge works. With a contract value of £115 million, this stage will include the design and construction of […]

  • 3 June 2016
    Business & Finance, Project & Tenders

    Consultancy firm Royal HaskoningDHV was engaged in May 2015 by the Port of Dover to advise on the selection of aggregate sources for the Dover Western Dock Revival project. After a year of studies, consultations and the production of an Environmental Statement running to over 1,500 pages – the preferred option is to extract aggregate […]

  • 9 September 2015
    Business & Finance

    Works on the Spetchley Revival Project are progressing well with the contractors now halfway through the project. Lake dredging and bank re-building works started in early August. Following the emptying of the lake, excavators are now on the site, taking the silt out of the area. The Spetchley Revival Project is a long-term project designed to invest […]

  • 16 April 2014
    Business & Finance, Equipment, Technology

    Dover Harbour Board will be holding a public workshop on Wednesday 23rd April at Cruise Terminal 2 between 2pm – 4pm to discuss the plans for the Dover Western Docks Revival. DHB recently announced its plans to develop the Western Docks, creating over 600 jobs and safeguarding another 140 positions, by developing a new cargo […]

  • 28 March 2014
    Business & Finance

    Harrington Lagoon has always been a popular swimming area enjoyed by the locals and the many tourists that visit the area each year, and it is about to get a facelift. However, over recent years the lagoon has become very shallow as a result of infilling from windblown and tidal marine sands, which has severely […]

  • 4 February 2013
    Business & Finance

    Lucena City Mayor Roderick “Dondon” Alcala pledged his full support Tuesday to intensify the city’s Rivers Resuscitation Program to make Lucena’s major tributaries ecologically sustainable and “alive.” At the project committee hearing Tuesday, Mayor Alcala assured city folks on the existing funds for the rehabilitation of the city’s major waterways Iyam and Dumaca. Alcala confirmed […]

  • 29 August 2012

    In a bid to address the perennial flood problems in the province, Governor Wilhelmino M. Sy-Alvarado recently proposed the revival of the mothballed Pampanga River Control System (PRCS). The PRCS is an agency tasked by the national government to maintain and dredge the river systems in Bulacan and Pampanga. “Its about time we dredge the […]

  • 16 March 2011

    Tripura Assembly on Tuesday expressed deep concern over the dying condition of the Rudra Sagar, the lone palace lake in entire Eastern…   (assamtribune) [mappress] Source: assamtribune, March 16, 2011  

  • 28 July 2010
    Business & Finance

    A stage has now been completed within the scope of the implementation of the port reform with the signature of all sale contracts of the equipment concerning the container terminals. The Grand Port Maritime du Havre (GPMH : Port of Le Havre Authority) has just signed the last two sale contracts for the container terminals. […]

  • 19 March 2020
    Business & Finance

    Four VolkerStevin projects have been shortlisted in the Project of the Year award categories at the Construction News Awards 2020. These projects are: Lincolnshire Lakes Flood Defense Scheme (under £20m); Victory Jetty (£20-£50m); Ipswich Tidal Barrier (£20-£50m); Dover Western Docks Revival (over £50m). Commenting the latest announcement, VolkerStevin Managing Director, Rob Coupe, said: “The announcement […]

  • 23 September 2019
    Business & Finance

     The Port of Dover recently released this very interesting video from the Dover Western Docks Revival Development Program, named ‘DWDR Progress 2017 – 2019’. According to an official announcement, DWDR is a one-off opportunity for the regeneration of Dover, bringing new investment into the area. Overall, the project includes the design and construction of two […]

  • 11 September 2019
    Business & Finance

    VSBW, a joint venture between VolkerStevin and Boskalis Westminster, has been appointed as the main contractor for delivering new sea defenses in Southsea worth £100 million. The Southsea Coastal Scheme will provide flood protection to more than 8,000 properties and 704 businesses at risk, due to ageing existing coastal defenses along 4.5km of Solent coastline. […]