Search results for: Temporary

662 results

A list of search results

  • 27 April 2012

    Building consortium PUMA realises temporary bridges for rail and road traffic at the Yangtzehaven. This bridging of a first water connection between Maasvlakte 2 and the Yangtzehaven is necessary for the discharge of E.ON cooling water after the sea wall is closed in July. The construction of a rail bridge required a large-scale interruption to […]

  • 27 April 2012

    In the first weekend of April, building consortium PUMA shut a temporary dam that forms a connection between the northern point of the Rotterdam World Gateway terminal and the soft sea wall. This compartmentalisation dam closes the Prinses Alexiahaven off from the other port basins on Maasvlakte 2. The port basin has been closed off […]

  • 15 April 2013
    Business & Finance

    The Camillus Clean Air Coalition (CCAC) filed an application for a temporary restraining order and preliminary injunction to stop the dumping of contaminated dredged materials at Wastebed 13 until adequate safeguards are in place to protect their health and safety. The group is made up of concerned residents in Camillus. Just last month 52 people […]

  • 30 May 2012

    Michael Rama, the Cebu City Mayor, is encouraging barangays to enlist volunteers to clean waterways and to be vigilant against flashfloods. Alvin Santillana, the head of City Disaster Risk Reduction Management Council said: „The dredging of clogged creeks and esteros, and clearing of illegal structures is a temporary solution.“ According to inquirer.net, Mayor Rama reminded […]

  • 29 April 2013
    Business & Finance

    The U.S. Army Corps of Engineers, St. Paul District, will begin constructing temporary emergency levees on 2nd Street in Fargo, N.D., on April 26. The plan is to begin on the north side of 2nd Street near 5th Ave. North and work south along the river. The Corps estimates it will take approximately 28,000 cubic […]

  • 27 March 2014
    Business & Finance

    Dredging is on target to start at the end of this month as long as water levels continue to drop and the banks and adjacent land are dry enough, announced Somerset County Council. It will commence near Moorland House Farm and machines are due to start arriving at the site soon. The temporary ramps have […]

  • 20 February 2013

    The Coast Guard began work Tuesday placing temporary aids to navigation that is necessary to open a substitute route for the Hatteras to Ocracoke ferry. Coast Guard Aids to Navigation Team Wanchese personnel are scheduled to place 14 new temporary aids to navigation with their 26-foot Trailerable Aids to Navigation Boat and 55-foot Aids to […]

  • 22 January 2015
    Business & Finance, Equipment, Technology

    The contractor on the Empire Floodgate Kiewit and Pittman will be dredging for construction purposes associated with the floodgate this upcoming Saturday, January 24, 2015 and Sunday, January 25, 2015, at the Doullut Canal. There will be dredging of the channel between the existing gate and the new gate during this construction period. The waterway […]

  • 3 May 2011

    Hudson River PCB dredging is facing temporary delays from floodwaters whose volume and speed is nearly three times safe boating standards. T… By PAUL POST (saratogian) [mappress] Source: saratogian, May 3, 2011;

  • 22 June 2020
    Infrastructure

    The City of Cape Town’s Mayoral Committee Member for Spatial Planning and Environment, Alderman Marian Nieuwoudt, visited the Strand sea wall last week to see how the temporary emergency repair works are progressing along Beach Road in Strand. The City recently kicked off emergency temporary protection and repair works to two separate sections along Beach […]

  • 3 May 2018
    Business & Finance

    The Steamship Authority has just released the latest update on their Woods Hole Ferry Terminal Reconstruction Project, saying that Jay Cashman, Inc. continues to work on the temporary dolphins.  The pile driving for the temporary dolphins has been completed and Cashman has begun welding the frames together. Cashman also continued work on the passenger platforms between […]

  • 14 June 2012

    Recently, CCCC Fourth Harbor Consultants Co., Ltd. has won the bid for Phase 1 engineering design of the south rim of Dadeng in south Xiang’an, Fujian Province. Located in the sea area between Heshang Reef of Dadeng Island and Yangtang Cape in the southeast of Dadeng Bridge, Xiang’an District, Xiamen, some 2 kilometers from Xiamen […]

  • 18 December 2013
    Business & Finance

    People in the White Horse Lane area of Boston will see Environment Agency staff putting up temporary demountable flood defences on Thursday. The structures are being used to reduce flood risk in the area after a 30-metre section of flood wall was damaged by the tidal surge on 5 December. In total 60-metres of temporary […]

  • 16 April 2014
    Business & Finance, Equipment, Technology

    The public comment period has been extended two weeks for the permit application from California Department of Water Resources (DWR) regarding their proposal to erect three temporary drought barriers in the Sacramento-San Joaquin River Delta. Originally set to close today, the comment period is now open through April 29. DWR proposes to place temporary barriers […]

  • 17 April 2014
    Business & Finance, Equipment, Technology

    The U.S. Army Corps of Engineers, Seattle District, has nearly completed construction of the temporary berm within the SR530 slide area. Though the berm is complete in length, construction efforts have now shifted to raising the berm an additional foot ahead of predicted heavy rainfall. The additional height is expected to help reduce potential flooding […]

  • 10 June 2014
    Business & Finance, Equipment, Technology

    The southern breakwater at the Mackay Marina has long been a popular destination for residents and visitors to walk, run, cycle or fish. North Queensland Bulk Ports said that it has temporarily reopened the breakwater for public access. Maintenance works are currently paused while NQBP assesses a range of options for undertaking required future work […]

  • 30 September 2013
    Business & Finance

    Tappan Zee Constructors, LLC will continue the construction of the Rockland County trestle. This work will include daytime pile driving to install the temporary foundation piles needed to support the platform. Pile driving will be limited to the hours of 7 a.m. to 7 p.m. on weekdays and, occasionally, from 12 noon to 7 p.m. […]

  • 24 April 2013
    Business & Finance

    The U.S. Army Corps of Engineers, St. Paul District, awarded contracts to build temporary emergency levees in Fargo, N.D. On April 18, the St. Paul District, Corps of Engineers awarded two contracts for the Fargo area. H&S Contracting Inc. and Tunheim Construction LLC, both of Moorhead, Minn., were awarded contracts to build to a levee […]

  • 7 August 2019
    Business & Finance

    The U.S. Army Corps of Engineers, Buffalo District, completed temporary measures to secure the west pier at Little Sodus Harbor, located in Fair Haven, New York on August 1, 2019. This work was expedited with site inspections by Corps of Engineers’ technical experts occurring through March, April, and May, the contract being awarded on June […]

  • 5 November 2017
    Business & Finance, Project & Tenders

    The U.S. Army Corps of Engineers, Jacksonville District, has awarded a $1.68 million emergency contract to construct a temporary levee in Yauco, Puerto Rico, as part of its recovery efforts associated with Hurricane Maria. According to the Corps, the contract was awarded to BIM Contractors, LLC of Guaynabo, Puerto Rico. The project calls for construction […]

  • 15 April 2020
    Business & Finance

    The U.S. Army Corps of Engineers’ Jacksonville District has just announced the approval of a planned temporary deviation to the 1981 Lake Kissimmee, Hatchineha and Cypress Interim Regulation Schedule. Major General Diana Holland, Commander of the U.S. Army Corps of Engineers, South Atlantic Division, approved the planned deviation to raise the regulation schedule to facilitate […]

  • 15 November 2018
    Business & Finance

    The Environment Agency announced yesterday that everything is ready for the beginning of the Portreath sea wall repair project. A large section of the wall collapsed during Storm Eleanor earlier this year, leaving the village of Portreath exposed to the sea. Cormac, on behalf of Cornwall Council, carried out temporary repairs in the immediate aftermath of […]

  • 27 February 2020
    Business & Finance

    Kingston District Council and Cape Jaffa Development Company are preparing for a temporary closure of the Cape Jaffa Marina boat launch facility and navigation channel following the March long weekend. To allow dredging operations to start for placement of a submersible dredge discharge pipe, the facility will be closed to mariners from 7.00am Tuesday, 10 […]

  • 4 June 2018
    Business & Finance

    The Shire of Gingin has temporarily closed access to Grace Darling Park in Lancelin owing to recent storm activity which has badly eroded the beach and undercut the gazebo making it unsafe for members of the public. “The gazebo structure and barbeque facility will be relocated to a safer area within the park until a […]

  • 17 February 2014
    Business & Finance, Equipment, Technology

    The timber section of Bowen Wharf will be closed to public access for several months from Monday 10th March 2014 while North Queensland Bulk Ports (NQBP) carries out significant maintenance work. Works are scheduled to continue on the Wharf until around mid-August 2014. During this period it will be unsafe for any member of the […]

  • 23 September 2013
    Business & Finance

    The U.S. Coast Guard has issued a revised Notice to Mariners with updated safety information, including the establishment of a Regulated Navigation Area (RNA) 300 yards north and 200 yards south of the existing Tappan Zee Bridge. All boaters are required to use the main channel, reduce wake and use extreme caution while transiting the […]