Search results for: draft

2493 results

A list of search results

  • 26 April 2013
    Business & Finance

    Based on the progress made in dredging at the International Container Transhipment Terminal at Vallarpadam, it has been decided to increase the maximum permissible draft available in the entire International Container Transhipment Terminal berth length of 600 meters to 14.50 meters, announced Cochin Port Trust. Turnaround of vessels more than 275 meters and drawing maximum […]

  • 12 March 2012

    Based on early feedback on a recent public notice regarding a draft environmental assessment, the U.S. Army Corps of Engineers is clarifying a portion of the document. The purpose of the draft environmental assessment is to identify three locations that may be used for dredged material placement.The footprint of the South Jetty Nearshore and Benson […]

  • 8 December 2014
    Business & Finance

    The Mohican River watershed in north-central Ohio is in good condition, according to an Ohio EPA draft water quality report about the watershed. The Agency is accepting comments on the draft report until January 5, 2015. Stream data was collected throughout the watershed in 2007. The draft report includes conclusions from the data analysis and […]

  • 16 September 2014
    Business & Finance, Equipment, Technology

    EPA is extending the comment period on its Draft Modification to General Electric’s Reissued RCRA Permit (also referred to as the Proposed Cleanup Plan for the Housatonic River Rest of River). In response to several requests for extension, public comments on the Draft Permit will be accepted through Oct. 27, 2014. EPA will also hold […]

  • 20 February 2017
    Business & Finance

    Western Bay of Plenty District Council’s Draft Inner Harbor and Coastal Erosion Management Policy 2017 is out for consultation from Monday, 20 February, to 20 March 2017, the council just announced. This draft policy, if adopted, will become a 30-year policy detailing how the council responds to coastal and harbor erosion, the officials stated. “The […]

  • 4 November 2012

    Karachi Port Trust has announced the increase in permissible draft to 13 meters at berths number 11 and 12 that will enable very large vessels to berth and their cargoes duly handled. Karachi Port is the repository of more than 60 percent of the entire maritime trade of Pakistan and efforts are afoot to further […]

  • 4 November 2019
    Business & Finance

    Two public meetings on the Draft Integrated Feasibility Report (Integrated Feasibility Study/Environmental Impact Statement/Environmental Impact Report) for the Port of Long Beach Deep Draft Navigation Study will be held on Wednesday, November 13, 2019, at the Port of Long Beach Administration Building in Long Beach, CA. The Draft IFR EIS/EIR has also a review period […]

  • 22 December 2015
    Business & Finance

    The U.S. Army Corps of Engineers, Jacksonville District, is about to release a draft copy of a rehabilitation report on Herbert Hoover Dike surrounding Lake Okeechobee for public review and comment. USACE plans to issue a draft summary of a dam safety modification report and an associated draft environmental impact statement to the public on Thursday, December […]

  • 15 July 2014
    Business & Finance, Equipment, Technology

    A plan to implement enhanced flood risk reduction features around West Sacramento’s perimeter was revealed yesterday as the U.S. Army Corps of Engineers Sacramento District released its draft general re-evaluation report and draft environmental impact statement for the West Sacramento project for public review. The proposed project would implement a variety of flood risk management […]

  • 5 May 2015
    Business & Finance

    The Final Environmental Assessment/Environmental Impact Report (EA/EIR) for the Maintenance Dredging of the Federal Navigation Channels in San Francisco Bay, Fiscal Years 2015-2024 and Response to Comments has been released and is available online. The United States Army Corps of Engineers (USACE) and San Francisco Bay Regional Water Quality Control Board (Regional Water Board) prepared […]

  • 25 February 2020
    Business & Finance, Vessels

    Chartwell Marine, a pioneer in next-generation vessel design, has announced the launch of their Scanwell shallow draft survey vessel.  The Scanwell range is available in multiple hull sizes – 10m, 12m, 15m and 19m – enabling use in a wide variety of applications, such as offshore energy, port infrastructure and scientific expeditions. Vessels with shallow […]

  • 21 January 2019
    Business & Finance

    A draft environmental assessment for levee repairs along the left–descending bank of the Missouri River and at one levee station along Upper Pony Creek in Mills and Pottawattamie counties, Iowa is currently available for public review, USACE reports.  The draft EA evaluates the environmental impacts of repairing damage to the levees caused by multiple heavy […]

  • 6 April 2015
    Business & Finance

    The U.S. Army Corps of Engineers, Alaska District, and the Alaska Department of Transportation and Public Facilities will present findings on the Tentatively Selected Plan for the Alaska Deep-Draft Arctic Port System Study. The meeting is scheduled from 5 to 7 p.m. April 16 at St. Joseph’s Church in Nome. The Tentatively Selected Plan calls […]

  • 14 June 2017
    Business & Finance

    The U.S. Army Corps of Engineers, Galveston District, in partnership with Brownsville Public Utilities Board (BPUB) has released the draft Integrated Feasibility Report and Environmental Assessment (EA) for the Resacas at Brownsville Ecosystem Restoration Study in Cameron County, Texas. According to the Corps,  the goal of the study is to identify degraded areas for potential […]

  • 9 October 2017
    Business & Finance

    A draft environmental assessment for levee repairs along the right descending bank of Big Goose Creek in Sheridan, Wyoming, is currently available for public review, reports the US Army Corps of Engineers, Omaha District. The draft EA evaluates the environmental impacts of repairing damage to the levee caused by high flows in June 2017. The proposed […]

  • 21 June 2013
    Business & Finance

    The Gulf Coast Ecosystem Restoration Council has extended the period for formal public comment on the Draft Initial Comprehensive Plan. The new date for this plan, named Restoring the Gulf Coast’s Ecosystem and Economy and accompanying Draft Programmatic Environmental Assessment, is July 8, 2013. The Draft Initial Comprehensive Plan provides a framework to implement a […]

  • 13 October 2014
    Business & Finance, Project & Tenders

    The Washington State Department of Ecology is seeking comments on proposed plans for digging up and taking away contaminated soil at the North Marina Ameron/Hulbert site near Port Gardner Bay. The public is encouraged to review and comment the plans from October 10 to November 8, 2014, on a draft consent decree. Also available for […]

  • 3 January 2020
    Business & Finance

    The U.S. Army Corps of Engineers’ New Orleans District has scheduled two public meetings regarding the release of the Upper Barataria Basin Louisiana – Feasibility Study with Integrated Environmental Impact Statement. The Tentatively Selected Plan (TSP) identified to undergo further feasibility-level design is a $514 million alternative that would extend the existing parish levee approximately […]

  • 21 March 2017
    Business & Finance, Project & Tenders

    The U.S. Army Corps of Engineers, Charleston District, has just released the Draft Environmental Assessment for the North Myrtle Beach renourishment project. USACE is currently involved in the planning phase of a beach emergency repair in the Grand Strand (Myrtle Beach) of Horry County, South Carolina. The Myrtle Beach Project – authorized for construction by Section 101 of the […]

  • 1 February 2017
    Business & Finance

    The U.S. Army Corps of Engineers, Kansas City and Omaha Districts, will hold a public meeting on the draft Missouri River Recovery Management Plan and Environmental Impact Statement (MRRMP-EIS) on February 9, at the Ramkota Hotel and Conference Center in Pierre, SD. The meeting will consist of an open house 5-5:45 p.m. and 8-8:45 p.m. […]

  • 13 January 2017
    Business & Finance, Project & Tenders

    The Louisiana Coastal Protection and Restoration Authority (CPRA) will hold several public meetings in January on the development, implementation and enforcement of the comprehensive protection and restoration Master Plan for Louisiana. In accordance with Louisiana legislation, CPRA is providing an update to the Master Plan every five years in order to take maximum advantage of new science, […]

  • 18 July 2019
    Business & Finance

    The Queensland’s Townsville City Council is seeking comments on a draft Shoreline Erosion Management Plan (SEMP) that will provide long term options to manage erosion issues at Horseshoe Bay. The draft Horseshoe Bay SEMP has been open for community feedback on Council’s website for two weeks and closes on Sunday. Townsville City Council’s Environmental Health […]

  • 25 February 2013
    Business & Finance

    The Port of Los Angeles Master Plan serves as a long-range plan to establish policies and guidelines for future development within the coastal zone boundary of the Port of Los Angeles. A Port Master Plan is required through the legislation of the California Coastal Act of 1976 and should respond to the demands of foreign […]

  • 25 June 2017
    Business & Finance, Project & Tenders

    The U.S. Army Corps of Engineers, St. Paul District, is extending the public comment period for its draft Environmental Assessment for its Lower Pool 4 dredged material management plan until July 14. According to the Corps, USACE decided to extend the public comment period after listening to community concerns about its draft plan. The new […]

  • 22 July 2016
    Business & Finance, Project & Tenders

    The U.S. Army Corps of Engineers, New York District, has announced the availability of the Draft General Re-evaluation Report/Environmental Impact Statement (Draft GRR/EIS) for the proposed Fire Island Inlet to Montauk Point, New York (FIMP) Coastal Storm Risk Management Project. The release of the draft feasibility study opens a 60-day review period for the public to […]

  • 17 July 2013
    Business & Finance

    The U.S. Army Corps of Engineers, St. Paul District, has concluded its public review and comment period for the Draft Supplemental Environmental Assessment (EA) for the proposed Fargo-Moorhead Area Diversion Project. The period began on June 14, 2013 and ended on July 15, 2013. The Supplemental EA focused on the proposed changes to the project […]