Search results for: mudflat enclosure

60 results

A list of search results

  • 23 January 2015
    Business & Finance, Equipment, Technology

    CCCC Shanghai Dredging Co., Ltd. has won two engineering projects in Shanghai: channel maintenance of the Yangtze estuary in 2015 and mudflat enclosure at the rear of the Changxing submerged breakwater. The project of channel maintenance of the Yangtze estuary in 2015 was divided into three lots, Lot A and two seasonal lots (Lot B and […]

  • 13 July 2012

    Recently, CCCC Shanghai Dredging Co., Ltd. has won the bid for the dredging and reclamation works of a 12.5-meter deepwater channel at the estuary of the Yangtze River and the siltation promotion and enclosure works (Phase 6)–enclosed reclamation works in Hengsha Dongtan. Total contract value of this projects is 1.075 billion yuan and total reclamation […]

  • 19 January 2011

    Plans to flood an area of the Somerset coast have been put out to public consultation. Bristol Port Authority has to create mudflats to … (bbc) [mappress] Source: bbc, January 19, 2011;

  • 19 August 2011

    The U.S. Environmental Protection Agency (EPA) announced that work has begun on removing 200,000 cubic yards of contaminated sediment from an area of the Passaic River near the Diamond Alkali Superfund site located at 80 Lister Avenue in Newark, NJ. EPA and the U.S. Army Corps of Engineers are overseeing the work, which is funded […]

  • 10 October 2016
    Business & Finance

    DP World London Gateway has completed the creation of 65 hectares of important intertidal habitat, comprising 59 hectares of mudflat, which will provide feeding ground for wading birds and fish, and six hectares of saltmarsh.  The new intertidal mudflat – equivalent in size to 82 football pitches – is located on the south bank of […]

  • 20 November 2017
    Business & Finance, Project & Tenders

    SCAPE Landscape Architecture has just released renderings and images of the Public Sediment, a living infrastructure proposal for the San Francisco Baylands that will invest in marshes and mudflats to buffer vulnerable communities and ecosystems from the threats of sea level rise. The proposal is developed for the Resilient by Design Bay Area Challenge, a […]

  • 12 May 2015
    Business & Finance

    The Government of Bangladesh has given top priority on reclamation of land from Bay of Bengal, according to Water Resources Minister Anisul Islam Mahmud. The minister added that the country has already reclaimed around 1,000 square kilometers of land from the sea, reports UNB. “We have built an enclosure at Musapur on the coast. We expect we […]

  • 15 January 2013
    Business & Finance

    ABPmer has recently prepared a habitat creation design for the Army Sailing Association, Thorney Island. The proposed scheme is intended to offset intertidal habitat lost or disturbed by the construction of a new pontoon proposed as part of the works for an upgraded Army inshore sailing training centre that will enable injured service men and […]

  • 10 April 2018
    Business & Finance

    The Mersea Harbor Protection Trust has finally received the consents for the Mersea Recharge Project from the Marine Management Organisation (MMO). “It has taken three years of on site surveys, investigations, meetings with coastal authorities and specialist report writing to finally have all the consents in place,” the Trust said. “This has cost some £85k, […]

  • 27 February 2013
    Business & Finance

    Pharmacia and Upjohn Company, LLC is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with a soil cleanup project in North Haven, Conn. The proposed project by Pharmacia and Upjohn Company, LLC involves the cleanup of a contaminated site […]

  • 28 February 2014
    Business & Finance, Equipment, Technology

    CCCC First Harbor Engineering Co, Ltd. has recently won the bid for the development works on Phase 1 of Toutang operation zone of Tianyang area of Baise Port, with a planned construction period of 12 months. Located in Tianyang County, Baise City, the project involves construction of Berth 9# and 10#, the corresponding rear land, […]

  • 6 November 2013
    Business & Finance

    The creation of a shallow wetland for wildfowl is the purpose behind the application by the Port of Gothenburg that is due to be submitted shortly to the Land and Environment Court. The wetland is a way of reinstating an area that has been used to deposit dredging spoils for almost 40 years. Ever since […]

  • 12 May 2015
    Business & Finance, Equipment, Technology

    Dragflow, an Italian company specialized in solid pumping solutions, has supplied a new dredger that will be used for sand mining operations in Nigeria. The full equipment includes an Hydraulic Pump (HY400) with 2 Excavators (EXHY35). This dredger is one of the new series, with the operator cabin completely redesigned to be more comfortable with a […]

  • 28 August 2017
    Business & Finance

    The Shelter Island Boat Launch Facility is currently operating with one lane open during a major improvement project to provide better access for boaters, the Port of San Diego said in its latest release.  After the Labor Day weekend, it will be completely closed from September 5, 2017 through the completion of construction, currently anticipated […]

  • 12 January 2017
    Business & Finance

    The U.S. Army Corps of Engineers, Seattle District, in partnership with the Port of Everett as local sponsor, recently completed a $1.2 million dredging project in the lower Snohomish River. The project, which was completed by Portable Hydraulic Dredging, LLC. of Alaska, resulted in the placement of approximately 90,000 cubic yards of dredge sands on […]

  • 16 July 2019
    Business & Finance, Project & Tenders

    The City of Whyalla, South Australia, has announced that the construction works on the third stage of the breakwater rock armor installation project are in full swing now. As reported, local company Whyalla Earthworks is continuing with the third stage of the breakwater project that will strengthen the inner-face of the breakwater. This work will […]

  • 12 September 2019
    Business & Finance

    International Association of Dredging Companies (IADC) recently released a new article titled The Mud Motor: A beneficial use of dredged sediment to enhance salt marsh development. An innovative approach to beneficially re-use dredged sediment to enhance salt marsh development was tested by a ‘Mud Motor’. A Mud Motor is a dredged sediment disposal method in […]

  • 29 October 2018
    Business & Finance

    There will be no week-day access to the Whyalla marina’s southern and sea-facing breakwaters for about two weeks next month, the South Australia’s City of Whyalla said in their latest release.  Local company Whyalla Earthworks will be continuing with second stage of the breakwater rock armor installation project that will strengthen the sea-facing breakwater. This […]

  • 18 September 2012
    Business & Finance

    Environment Secretary Owen Paterson is to officially launch Europe’s most ambitious man-made coastal nature project that will guarantee a place for tens of thousands of migratory birds, and combat the threats from climate change and coastal flooding. Wallasea Island in the Thames Estuary will be transformed from levee-protected farmland into a thriving wetland, twice the size […]

  • 12 September 2014
    Business & Finance, Equipment, Technology

    On September 3, CCCC Shanghai Dredging Co., Ltd. won the bid for the EPC contract for the mudflat surfacing project in Taizhou East New Area, Zhejiang Province, with a total construction period of 30 months. The project is located in the east of Taizhou East New Area and the core of Taizhou Bay Cyclic Economy […]

  • 3 January 2012

    The Sheraton Hotel and Marina in San Diego, California, will host the 19th HYPACK Hydrographic Training Event, and the RESON Team will be on site with their SeaBat 7125SV2 running with HYPACK software. Sales Manager Josh Grava will be on hand at Booth 6 to talk customers through the complete range of RESON products including […]

  • 9 September 2019
    Business & Finance

    The U.S. Army Corps of Engineers, Rock Island District, said in their latest announcement that the works continue on the Beaver Island Upper Mississippi River Restoration (UMRR) Habitat Rehabilitation and Enhancement Project (HREP) near Clinton, Iowa. This project includes erosion control, enclosure structures and backwater excavation to restore and protect off-channel aquatic, wetland and floodplain […]

  • 31 July 2018
    Business & Finance

    Announced in front of 160 industry professionals, the ICE South East England Engineering Excellence Awards recognized five outstanding projects and two extraordinary individuals that have shown how engineers in the South East are transforming lives. The event which took place at the Grand Brighton Hotel was hosted by Brittany Harris, co-founder of Qualis Flow. Among the […]

  • 6 December 2016
    Business & Finance

    The U.S. Environmental Protection Agency has reached two settlements with several parties to begin cleanup of Yosemite Slough, an inter-tidal water channel in the Bayview District of San Francisco. The site contains high levels of contaminants, especially PCBs and lead, which are hazardous for the plants and animals that live in the slough. The Yosemite […]

  • 13 July 2015
    Business & Finance

    A landmark environmental project made possible due to a unique partnership between Crossrail and the Royal Society for the Protection of Birds (RSPB) reached a significant milestone this weekend. The first phase of the Wallasea Island Wild Coast project was completed when the new sea walls of ‘Cell 1’ were successfully breached to allow for […]

  • 27 July 2016
    Business & Finance, Project & Tenders

    Half of the River Aire at Crown Point Weir has been blocked off this week to allow the installation of a movable weir as part of Phase 1 of Leeds Flood Alleviation Scheme. The Environment Agency has worked with Leeds City Council and other partners to develop Phase 1 which comprises a combination of flood […]