Search results for: new marina

617 results

A list of search results

  • 3 March 2015
    Business & Finance

    The U.S. Army Corps of Engineers, Nashville District, is soliciting proposals for development and operation of a new commercial concession marina with related facilities and services at Rowena Landing South on Lake Cumberland in Russell County, just north of Albany, Ky. The site is accessible from State Highway 90 via State Road 558, an asphalt […]

  • 28 May 2014
    Business & Finance, Equipment, Technology

    Yarde Realty Company is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U. S. in conjunction with constructing a commercial marina and retaining fill material along the East River in Madison, Connecticut. The proposed project includes the retention of fill material and work […]

  • 17 January 2014
    Business & Finance, Equipment, Technology

    The Ohio Department of Natural Resources (ODNR) has requested the U.S. Army Corps of Engineers temporarily lower the level of Caesar Creek Lake in Warren County by 10 feet to allow for an archaeological study to be conducted as part of the planned marina construction project. This archaeological study is the first step in attaining […]

  • 25 September 2013
    Business & Finance

    One Goat Island, LLC (Hyatt Regency Newport Marina) is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with constructing and maintaining a new marina in Cranston, Rhode Island. The applicant proposes to construct and maintain a new marina with […]

  • 27 August 2013
    Business & Finance

    The Chairman of the Riga City Council and the member of the Freeport of Riga Board Mr. Nils Ushakovs has recently visited the newly created marina at Kipsala. “The River Daugava flows through the city of Riga, but the city has just recently commenced to make use of the opportunities, provided by the extensive and […]

  • 6 September 2012

    The new Marina South Wharves (MSW) was officially opened yesterday in a ceremony attended by officials from the Ministry of Transport, Maritime and Port Authority of Singapore (MPA), and management and staff of Jurong Port Pte Ltd. The ceremony was officiated by Mr Pang Kin Keong, Permanent Secretary of the Ministry of Transport. Developed by […]

  • 20 February 2012

    The Davenport Landing Development – 28 Southfield 2011, LLC, is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with constructing a marina and doing other work in the West Branch of the Stamford Harbor in Stamford, Conn. Davenport Landing […]

  • 24 November 2011

    Developers of a recommended luxury marina in Victoria’s harbor are hoping the federal officials will reach a decision on the project by the end of the year. A navigable waters permit has been allowed by Transport Canada in May 2010 and green lights from Fisheries and Oceans Canada and Environment Canada for a 52-slip marina […]

  • 27 December 2019
    Business & Finance, Project & Tenders

    Port of Everett (WA) together with the contractor have reached a new milestone on the Central Marina project. The company reported that another milestone was reached at the Port of Everett Marina this morning as crews drove the first of 13 piles for the new Central G-dock. Earlier this year, the Port of Everett Commission […]

  • 18 April 2019
    Business & Finance

    Construction of a new bayfront marina at the end of Higbee Avenue in Somers Point is underway with completion expected in the summer of 2019. Wickberg Marina Contracting, Inc. of Belford, NJ recently completed the dredging phase of the project, and Walters Marine Construction of Ocean View, NJ has begun construction on the marina itself. […]

  • 17 March 2017
    Business & Finance, Equipment, Technology, Vessels

    Italdraghe SpA, an Italian manufacturer of specifically designed dredging and mining applications, has delivered another Marina Master 8000 dredger to Fambridge Marina in Essex for her new owners Yacht Havens Ltd. This is the third dredger of its kind to be supplied to a UK marina owner and the second to this client. A key […]

  • 13 October 2016
    Business & Finance

    Lyttelton Port of Christchurch (LPC) plans to build a new marina at the sheltered site of the inner harbor pile moorings in Lyttelton Harbor. The new marina will be Canterbury’s only walk-on floating marina and on completion of Stages 1 and 2 it will feature up to 200 berths for yachts and powerboats. Construction works […]

  • 28 September 2016
    Business & Finance

    The Brighton Marina team welcomed Marina Master MII, their new cutter suction dredger (CSD), on September 13, 2016. Measuring 14 meters in length and weighing 25 tonnes, the CSD ‘Doris’ was successfully launched into the water to begin the sea trials in preparation for next season. The CSD is designed by Norfolk based Goodchild Marine Services […]

  • 13 June 2016
    Business & Finance

    Boat launching and retrieval waiting times during peak periods at Two Rocks Marina will be reduced with the recent completion of a new 18 meter landing pontoon at the facility. Department of Transport (DoT) Director Project Delivery Cameron Smith said that the new 18 meter pontoon, located 75 meters north of the recently expanded boat […]

  • 3 February 2016
    Business & Finance

    The newly constructed Newport Beach Marina Park, designed in part by Moffatt & Nichol, earned high honors this year. The American Society of Civil Engineers Orange County Chapter recognized Marina Park with two ‘Project of the Year’ awards – one under the Airports & Ports category and another under the Architectural Engineering category. As a […]

  • 18 March 2015
    Business & Finance

    Park Place Marina is preparing to open for its first full boating season in May 2015 after undergoing a major $2 million renovation and expansion. John S. Matricardi, P.E., KS Associates’ Director of Coastal Engineering Services, provided design, permitting, and construction engineering services for the project. In addition to offering public docking spaces, the marina […]

  • 17 September 2014
    Business & Finance, Equipment, Technology

    Winsford’s new-look marina will be one of the star attractions at next weekend’s inaugural Salt Regatta. Cheshire West and Chester Council has invested more than £40,000 to upgrade the tired-looking marina in time for the annual Winsford Salt Fair, which for the first time this year will welcome a flotilla of vessels to the Weaver. The […]

  • 16 June 2014
    Business & Finance, Equipment, Technology

    The Sandspit Marina dredging program has begun and the first of five pontoon arms will be installed in August. “Our crew in Sandspit have been working hard for two months to fabricate the pontoon modules for Arms A and B of the Sandspit Marina,” announced Pacific Pontoon, one of the contractors. Fabrication of Stage One […]

  • 21 March 2014
    Business & Finance, Equipment, Technology

    U.S. Senator Charles E. Schumer urged top officials at the Federal Emergency Management Agency (FEMA) to quickly approve approximately $4 million in federal funding for the City of New Rochelle to rebuild the Municipal Marina and Hudson Park beach, which were ravaged during Hurricane Sandy. Schumer explained that New Rochelle officials were originally told by […]

  • 21 August 2013
    Business & Finance

    The Menominee Marina dredging project is scheduled to commence in mid-October, according to uppermichiganssource.com. Record low water levels and the sediment on the marina bottom cause major problems for the boaters in this area. To avoid these issues, the State of Michigan recently awarded the city of Menominee a waterways grant of $1.2 million which […]

  • 23 May 2013

    Her Majesty’s Government of Gibraltar launched the 700 berth small boat marina project. The marina will be constructed in the mid-harbour area and will incorporate 400 six-metre and 300 eight-metre finger pontoon berths. The marina will have electrical and water points, secure entry to the pontoons and CCTV security cameras. The construction will be a […]

  • 12 April 2013
    Business & Finance

    Premier and Member for South West Coast Denis Napthine was in Portland today celebrating with boating enthusiasts and locals as he officially opened the newly completed Portland Bay marina. Joined by Glenelg Shire Council Mayor Karen Stephens, Dr Napthine said the new marina was a great asset for Portland providing improved and safer access to […]

  • 15 November 2011

    In plans released by the Northfleet Harbour Restoration Trust, the existing dock, including an 18th century tidal mill, will be renovated…   By Greg Goulding (motorboatsmonthly) [mappress] Source: motorboatsmonthly, November 15, 2011; Image: northfleetharbour

  • 21 July 2011

    Retired hi fi businessman Graham Guthrie wants to build a $10 million marina at Matiatia on Waiheke Island… By Bernard Orsman (nzherald) [mappress] Source: nzherald, July 21, 2011;

  • 6 May 2011

    A marina development just begun at Port Nelson has raised “grave concerns” among rowers and a tide of questions from power boat and small c… More info: stuff BY BILL MOORE [mappress] Source: stuff, May 6, 2011;

  • 11 February 2011

    Nine months after the launch of construction works at the new Limassol marina in Cyprus, Camper & Nicholsons has announced that the project… (timesofmalta) [mappress] Source: timesofmalta, February 11, 2011;

  • 5 May 2010

    A CONSENT hearing to dredge and dump sediment at inshore locations has been adjourned so that overseas expert witnesses can attend. [mappress] Source: times, May 5, 2010;

  • 26 January 2010
    Project & Tenders

    The new marina Sandspit Yacht Club Marina Society hopes to build at Sandspit would provide berthing for 157 boats at the Matakana River’s lower end, with a 35 year occupation of the marina… [mappress] Source:nbr.co.nz,January 26,2010

  • 29 May 2020

    Australasian Marine Associates (AMA) has just completed the dredging works within Sanctuary Cove Marina for Mulpha Australia Limited, as part of their multimillion dollar marina upgrade incorporating a super-yacht facility. AMA was commissioned from project inception to design and implement the environmental surveys in accordance with permit requirements. The works included dredging and disposal of […]