The Hamburg Port Authority has released a video of the Alexander von Humboldt, a huge trailing suction hopper dredger owned by the Jan De Nul Group, in action at the port. “The daily work of the hopper dredgers is very important. Without them, the port of Hamburg would simply silt up,” the Authority
Cochin Shipyard Limited (CSL) and IHC Holland BV have signed a Memorandum of Understanding for cooperation in the construction of cutter suction hopper dredgers (CSDs) and trailing suction hopper dredgers (TSHDs). IHC, which has vast experience and proven capability to build world class dredging equ
Kuwait National Petroleum Company (KNPC) is building one of the largest oil refining plants in the world. The refinery will be constructed on land reclaimed by Van Oord in ‘sabkha area’, a salt plain near the coast some 30 kilometers north of the Saudi border. The project involves dredging and recla
Envisan France, the French branch of the environmental division of Jan De Nul Group, recently launched the construction of its Soil and Sediment Treatment Center in La Seyne-sur-Mer. This center will be specifically designed for the treatment and recycling of polluted sediments and soil. Based on it
After the 1953 and 1976 North Sea floods, a flood defense plan, called the Sigma Plan, was conceived to protect the Flemish part of the Scheldt estuary against future storm surges. The plan is governed by Waterwegen en Zeekanaal NV (W&Z), a Flemish government agency and since 2005 aims to combine fl
Dredging operations on the River Chet will be undertaken from Monday, 13 April, until Friday, 1 May, 2015, according to the Broads Authority. During this period dredging will be in operation between 08:00 and 16:00 daily, excluding weekends, and during each period of operation delays of up to 2 hour
Prepared by its working group on Adaptive Management (AM), the Central Dredging Association (CEDA) has published a new paper which aims to further the debate on AM, as an important tool, in managing dredging and reclamation projects in an environmentally friendly manner. Entitled ‘Integrating Adapti
Europe’s largest commercial marine and workboat exhibition, Seawork International, has announced that the Port of London Authority’s (PLA) new 36-meter mooring maintenance vessel, London Titan, built at a cost of £7 million, will be officially unveiled at the opening day of the event in June. Follow
Balfour Beatty, an international infrastructure group, has been appointed as the civil contractor for an integrated team that will deliver the ten-year Thames Estuary Asset Management Program for CH2M Hill, on behalf of the Environment Agency, and anticipated to be worth up to £250 million to Balfou
Kalmar, part of Cargotec, has signed a significant repeat automation contract with DP World London Gateway to deliver an additional system of 20 automatic stacking cranes as the port continues its expansion program and invests in a third berth following the successful launch of berths 1 and 2. Kalma
IHC Mining, part of Royal IHC (IHC), has become a member of the World Ocean Council (WOC) to add to the growing global industry alliance for “corporate ocean responsibility”. As a leader in responsible dredging and offshore mining activities, IHC Mining is expanding its scope as one of the pioneers
Cowes Harbor Commission’s contractors Boskalis Westminster has returned for a week to re-shape the gravel core and carry out further surveys of the new breakwater. As part of the works, the company has carried out further surveys to determine that settlement of the core material into the subsoil is
An unusual style of dredger has returned to ‘hoover’ thousands of tonnes of silt from Gloucester Docks this week, allowing vessels of all sizes to continue to visit the city safely. Trialled successfully in 2012, the new method of suction dredging removes built up sediment by using a 22-tonne waterb
The Canal and River Trust has teamed up with the Berks, Bucks and Oxon Wildlife Trust to create a new wetland haven for amphibians and water-loving plants at a secluded lake beside the Oxford Canal. Part of the project is clearing openings in the reed beds using an amphibious harvester, known as a ‘