Wasa Dredging Ltd. from Vaasa in Finland has successfully started dredging with its new dredger “Optimus” in the Port of Pietarsaari. Wasa Dredging has been working in most demanding marine construction work for more than 25 years and this know-how has been utilized in designing and building backhoe
Last week in Moscow, a meeting was held between the representatives of Russian and Chinese companies concerning the implementation of the Big Port of Zarubino project. At the meeting were present Mr. Andrey Tarasenko, General Director of FSUE “Rosmorport”, Alexander Vinokurov, President of the “Summ
For the second year in a row CARIS collaborated with industry manufacturers to provide third year students from Maritime Institute Willem Barentsz (MIWB), located on the northern island of Terschelling in The Netherlands, with a valuable week-long surveying experience. The purpose of the survey proj
Leaders of the Somerset Levels and Moors Flood Action Plan (FAP) met new Environment Secretary Elizabeth Truss yesterday, as part of her first visit to Somerset to receive an update on flooding. In an informal meeting with the Minister, members of FAP’s Leaders Implementation Group told her about th
The importance and potential of Wales canals to improve the prosperity of local communities was recognized at last week’s Royal Welsh Show, with a series of meetings between Welsh ministers and representatives from Glandŵr Cymru, the Canal & River Trust in Wales. The First Minister Carwyn Jones AM h
Work on a £3.4m project at Seaham Harbour’s historic North Pier aimed at protecting the town from flooding and erosion is to get underway this week. The scheme will safeguard around 100 homes and 30 businesses in the town against potential flood risks and help prevent coastal deterioration by stoppi
Van Oord Bags Capital Projects in Brazil and The Bahamas Van Oord, a leading international contractor specialising in dredging, marine engineering and offshore projects, has won two orders in Brazil and the Bahamas. The activities involve dredging work for the construction of a new shipyard in Aracr
Dragflow, a world player in solid pumping solutions with over 25 years of experience in manufacturing heavy duty pumps and complete dredging equipment, has submitted their presentation on High Depth Dredging, exclusively for Dredging Today readers. Growth of global population, tourism, transportatio
The first sonar manufacturer recently arrived in Plymouth to start conducting bathymetric and backscatter surveys in Plymouth Sound and Wembury Bay as part of the Shallow Survey 2015 Common Dataset (CDS) collection. The aim of the CDS is to provide the international hydrographic community with a ran
The Kennet and Avon Canal, a waterway in southern England, will soon have one mile of newly restored bank. Restoration works on the portion of a 87 miles long canal are in full swing. According to Oda Dijksterhuis from the Canal and River Trust, the “green method” being used to rebuild the bank was
Van Oord, a leading international contractor specialising in dredging, marine engineering and offshore projects, has won two orders in Brazil and the Bahamas. The activities involve dredging work for the construction of a new shipyard in Aracruz, Brazil. The client is Estaleiro Jurong Aracruz (EJA),
VVV-Spetstekhnika, a Kherson-based manufacturer of suction dredgers, recently delivered new dredger, the НСС 400/20-F-GR to a customer in Ukraine. The model, equipped with two removable suction nozzles on the suction tube and capable of dredging up to 10m, was produced in just four months. Control h
Dredge Yard recently acquired and installed additional new machines in its facility in Turkey. This equipment, CNC vertical lathes and CNC Pattern Maker, will increase their capacity in the machining and assembly shop and to align with the capacity of the casting and fettling. Dredge Yard with its s
Work on the construction of a new breakwater structure at the mouth of Cowes Harbour, which will transform the port into a true sheltered harbourage, has successfully moved into the third stage of this vital 18-month coastal protection project. Cowes Harbour Commission’s appointed contractors Boskal