The first field test of the new real time dredging sonar system called Multi Dredge is commissioned on the Dutch river Vecht, announced CT Systems. The new Multi Dredge system consists of multiple survey-grade transducers strategically placed on a dredging vessel. Each transducer is individually con
Thordon Equipment Shows Great Results on DEME’s “D’Artagnan” Water lubricated Thordon Composite cutterhead shaft bearings have performed well for 9 years on one of the largest cutter suction dredgers in the world – Dredging, Environmental and Marine Engineering N.V. (DEME)’s D’Artagnan (28,200 kW to
IDRECO has delivered its first dredger to Ukraine, the IDRECO ISD 600 fully electric dredger. The ISD 600 dredger is equipped with an in-board high performance IDRECO IDP 600 dredge pump with double curved vanes. The dredge pump is frequency driven by an electric motor with a power of 1500 kW. A 355
Carrickfergus Borough Council is currently seeking quotations and proposals from suitably qualified and competent contractors for the provision of the consultancy and management of the Carrickfergus Marina and Harbour dredging contract. The appointed contractor will be expected to successfully manag
Energy Minister Fergus Ewing has announced a £4 million grant from Highlands and Islands Enterprise (HIE) for the development of a new deepwater quayside at the Port of Cromarty Firth – bringing the total redevelopment project to £25 million. The 35 acre Invergordon Service Base, operated by the Por
Water lubricated Thordon Composite cutterhead shaft bearings have performed well for 9 years on one of the largest cutter suction dredgers in the world – Dredging, Environmental and Marine Engineering N.V. (DEME)’s D’Artagnan (28,200 kW total installed power). The vessel had a major dry docking at D
Major dredging works combined with fine summer weather has helped boost visitor numbers at Hafan Pwllheli marina in North Wales. In the last few months the marina has welcomed nearly 1000 boats from all over the UK and Europe. The final phase of the work to dredge the marina basin and main channel w
Lerwick Harbour has again demonstrated its deep-water capacity and capabilities, this time by simultaneously accommodating two giant support vessels and the successful offloading of a 10,000 tonne subsea oil storage tank, destined for west of the Shetland Islands. The sheltered port’s facilities and
Proteus FZC, a provider of satellite-derived mapping and classification services, has launched a fast-turnaround habitat mapping solution designed specifically for Environmental Impact Assessments (EIAs). Through the service, Proteus delivers high-resolution classification maps of terrestrial areas
Scottish Government Minister for Local Government and Planning, Derek Mackay yesterday visited the 53 hectare Westway Park in Renfrew, to inspect progress at a £1.3 million dock development project. The project was one of the first locations in the country to receive funding from the Scottish Govern
Dr Bruce Tomlinson has been appointed as Chief Executive of HR Wallingford. He joins HR Wallingford from UK-based Fugro EMU, a marine survey and consultancy, where he was Managing Director. With more than 25 years’ experience in the maritime industry, Bruce brings high level strategic business exper
APEM has won a major contract to collect and analyze over 1,000 samples from the seabed in the eastern English Channel and off the south coast, for eight marine aggregate operators with licensed interests across the region. Offshore surveys organized by APEM will collect 1,060 ‘grab’ samples of the
Last week an article entitled ‘Floods and climate: emerging perspectives for flood risk assessment and management’ appeared in the professional journal Natural Hazards and Earth System Sciences. In this article, 30 international hydrologists, including Laurens Bouwer of Deltares, advocate the creati
The Port of Wells dredging scheme will resume next week, on August 11, 2014. The port’s dredger “Kari Hege” will be engaged in dredging operations in the main channel north of number 4 buoy, between buoys 4 and 2. All material dredged from these areas will be placed on the berm which is marked by [&