Van Oord, the Netherlands based contractor for dredging and offshore projects, had a better business result in 2013 than in 2012. The year closed with an almost equal turnover of EUR 1,641 million (2012: EUR 1,676 million). At EUR 130 million, the net profit was considerably higher than in 2012 (EUR
Caley Ocean Systems has supplied a high performance A-frame handling system to Boskalis Offshore for launching of trenching vehicles and ploughs from the company’s first ‘N Class’ cable-laying vessel Ndurance. Mounted on the stern of the Ndurance, the Caley A-frame is capable of handling loads of 70
This year the Luka Koper share has recorded one of the largest growths on Ljubljana’s stock exchange, and this is ultimately the result of the company’s good performance in 2013, Gašpar Gašpar Mišič, the Management Board President of Luka Koper d.d., said in his Letter to Shareholders today. “In the
The European Union will co-finance with over €14 million from the TEN-T Programme, a project to revamp the infrastructure of the Port of Stockholm in Sweden and contribute to the realisation of the “Nordic Triangle” (TEN-T Priority Project 12). The project, which was selected for funding under the 2
On March 20, Vietnamese Minister of Transport Mr Nguyen Hong Truong, carried out the official Vietnamese ribbon-cutting ceremony for the latest addition to Damen Shipyard Group’s portfolio. Damen Song Cam, a brand new yard, is one of the largest in the Group and represents Damen’s first formal Joint
VolkerStevin will be giving a talk on the coastal defence works being undertaken at Cromer as part of the Cromer Preservation Society’s Annual General Meeting (AGM), held at the Cromer Community Hall on the 27th March 2014. Duncan Nash, VolkerStevin site agent, said: “The Cromer Preservation Society
Volvo Construction Equipment has introduced its EC380E crawler excavator, equipped with a powerful Tier 4 Final engine. The Volvo heavy-duty EC380E crawler excavator is a productive machine that lowers operating costs through reduced fuel consumption and simple maintenance requirements. Powered by a
Communities across England & Wales were invited to adopt mile-long lengths of canal or river and help transform some of the Canal & River Trust’s 2,000 miles of waterways. Canal Connections, a not for profit organisation aimed at harnessing the potential of Yorkshire’s waterways, adopted the section
Panama Canal Expansion Program Update – March 2014 (VIDEO) The Panama Canal expansion project will double the capacity of the Panama Canal by 2015 by creating a new lane of traffic and allowing more and larger ships to transit. Maldives: Boskalis Wins Massive Land Reclamation Deal A contract signi
The French Prime Minister, Jean-Marc Ayrault, and Anne Lauvergeon, Chair of the 2030 Innovation Committee, introduced the first winners of the Worldwide Innovation Challenge at the Matignon. Nodulier 2022, a partnership between SDI (Société de Dragage International, part of the DEME Group), OceanflO
Royal Boskalis Westminster N.V. has defined a strategy for the period 2014-2016 based on three elements. These elements are: Focus, Expand and Strengthen. “It is our goal to further expand our company. Identifying opportunities for growth starts with understanding current market developments. We foc
The UK Government announced an additional £140m Flood and Coastal Risk Management funding over the next two years. This is in addition to the £130m previously announced by the Government in early February and includes some revenue money as well as capital. It will fund repairs to flood defences dama
With the signing of the concession agreement between Consortium Antwerp Port (CAP) and the Sultanate of Oman to operate, develop and manage the Port of Duqm and its industrial land for the next 28 years, the Porf of Duqm Company reaches its second milestone. The agreement was signed in the presence
The Port of Wells dredging project is scheduled to begin on 24th March 2014. The port’s dredger “Kari Hege” will be engaged in dredging operations in the main channel north of number 4 buoy, between buoys 4 and 2. All material dredged from these areas will be placed on the berm which is marked by [&