
Vale has started commissioning the Gelado Project in Carajás, in the state of Pará (Brazil), using 100% electric dredgers that will extract tailings deposited over the last 37 years. The commissioning phase, in which performance and capacity tests with loading are being carried out, should last unti

Following on from the success of the previous online courses Dredging for Sustainable Infrastructure, CEDA and IADC have decided to organise an onsite course on 13 & 14 December 2022 at the HR Wallingford Head Office in Oxfordshire (UK). Experienced lecturers will describe the latest thinking and ap

The role of modelling, its benefits and limitations, and what it needs to be used successfully on a dredging project is often poorly understood and this in turn can lead to poorer design and environmental outcomes. The latest IADC-CEDA Fact Sheet: ‘Models and Modelling for dredging’ describes the mo

Van Oord recently joined a partnership that will, over the coming years, strengthen the Dutch Lekdijk in an innovative, sustainable and efficient way. Together with stakeholders, the Sterke Lekdijk project will make a positive impact on the water safety in The Netherlands. Eddy Van Haastregt, Projec

Inspired by the work of Engineering With Nature (EWN), Harwich Haven Authority (HHA) has considered how they can dredge in a more environmentally sustainable manner. The EWN concept can be defined as the intentional alignment of natural and engineering processes to efficiently and sustainably delive

VolkerStevin, as part of VBA – a joint venture between VolkerStevin, Boskalis Westminster and SNC-Lavalin’s Atkins business has been awarded the Centenary Award at the ICE Yorkshire and Humber Civil Engineering Awards 2022, for its work on the Mytholmroyd Flood Alleviation Scheme in West Yorkshire.

BAM Nuttall’s work to rebuild Marine Parade in Dawlish on behalf of Network Rail has won the ‘Project over £8 million Re-engineered’ Award at the ICE South West Civil Engineering Awards. Following devastating storms in 2014, which caused significant disruption to the railway connecting Devon and Cor

Southsea Coastal Scheme has made the top five list – out of 67 entries – as ‘People’s Choice’ in the 2021 SECBE Constructing Excellence Awards for the heritage maintenance work on Long Curtain Moat. The project scored an impressive 421 votes, and while it didn’t win the top prize at the awards cerem

Jan De Nul Group’s newest trailing suction hopper dredgers – SANDERUS, ORTELIUS, TRISTÃO DA CUHNA, AFONSO DE ALBUQUERQUE, and DIOGO CÃO – are the first ships to receive the new notation of Bureau Veritas (BV) that recognizes the performance of ultra-low emission vessels (ULEVs). These JDN vessels ar

In the latest edition of the FOCUS magazine, Jan De Nul Group reported an interesting story about the Elbe River dredging project named “Paving the way to Hamburg”. At one time, the company had 4 hoppers, 2 split hoppers and 1 backhoe dredger working on the project. JDN spared no effort to make the

Controllab, specialized in the analysis and growth of control software, has developed a simulator for a hopper dredger. The simulator has a Unity 3D coupling to show a 3D view of the dredger. With the help of this simulator, the company is developing motion compensation for the drag head. In coopera

Jan De Nul Group’s trailing suction hopper dredger, ‘Alexander von Humboldt’, recently completed 2,000 hours of operation on 100% renewable, second-generation Biofuel Oil (BFO). The vessel is powered by 2 × MAN 12V32/40 and 1 × MAN 7L32/40 main engines. According to JDN, this major milestone represe

This week Royal IHC participated at the online Dredging in India Conference. IHC sales manager, Jaco Kleijwegt held a presentation about the company’s dredging solutions and their modular TSHD series Easydredge in particular. The flexible Easydredge concept is ideal for all common maintenance and la

National Marine Dredging Company (NMDC) announced today that their second custom-built trailing suction hopper dredger (TSHD) Ghasha has successfully completed sea trails. Following the completion of trials, the 8.000m³ Ghasha is now on her way to the first dredging project in Abu Dhabi, NMDC report