Advertisement

News

Rostock Port: Ups and Downs at River Warnow (Germany)
News

Rostock Port: Ups and Downs at River Warnow (Germany)

22.7 million tonnes of goods (gross) were handled via the various port facilities in Rostock last year; 1.3 million tonnes or five percent less than in 2011. The lion’s share of 21.2 million tonnes of freight was loaded and unloaded at Rostock overseas port. According to the port and shipping author

about 14 years ago
The Netherlands: Deltares to Study Strength of Grass Covers on Dikes
News

The Netherlands: Deltares to Study Strength of Grass Covers on Dikes

Rijkswaterstaat is teaming up with the Rivierenland Water Authority and research institute Deltares to test a stretch of dike near Nijmegen near the Hollandsch-Duitsch pumping station and Millingen aan de Rijn. The strength of the grass cover will be tested to see how it copes with overtopping resul

about 14 years ago
Ministry Invites Bids for Alexandroupolis Port Dredging (Greece)
News

Ministry Invites Bids for Alexandroupolis Port Dredging (Greece)

Ministry AN.ANT.YPO.ME.DI/G.G.D.E. has invited bidders to submit their offers for the completion of the basin dredging program and channel excavation in the Port of Alexandroupolis. These works include: – Complete dredging in the outer (eastern) basin of the port of Alexandroupolis; – Complete dredg

about 14 years ago
Ukraine: Illichivsk Port Dredging Contract Awarded
News

Ukraine: Illichivsk Port Dredging Contract Awarded

“Van Oord Ukraine” has been appointed by the Illichivsk Sea Commercial Port for the dredging project at the port’s approach channel. “Moebius Construction Ukraine” and SC “Van Oord Ukraine” were taking part in the tender for this capital project. Van Oord’s proposal was defined as the most attractiv

about 14 years ago
Konecranes Introduces World’s First Hybrid Reach Stacker (Sweden)
News

Konecranes Introduces World’s First Hybrid Reach Stacker (Sweden)

Konecranes introduces the world’s first hybrid reach stacker for container handling, with a lifting capacity of 45 tons. The SMV 4531 TB5 HLT features a hybrid diesel/electric driveline, an electrified hydraulic lifting system, and a super capacitor based energy storage. This innovative lift truck w

about 14 years ago

Advertisement

The Netherlands: Boskalis Shareholders OK Share Issue
News

The Netherlands: Boskalis Shareholders OK Share Issue

After a presentation by Royal Boskalis Westminster N.V. of the offer for all the issued and outstanding shares of Dockwise Ltd., as initially announced on 26 November 2012, Boskalis shareholders voted in favor of the proposal to issue new shares. During the Extraordinary General Meeting (EGM) of Bos

about 14 years ago
Aarsleff to Construct New Värtahamnen Harbour (Sweden)
News

Aarsleff to Construct New Värtahamnen Harbour (Sweden)

Today, Per Aarsleff A/S entered into an agreement with City of Stockholm, Exploitation Office and Ports of Stockholm for the construction of new harbour structures in the area Värtahamnen which is part of the Ports of Stockholm. The contract has a value of almost DKK 1 billion and is to be carried o

about 14 years ago
PNA Plans Cherbourg Port Expansion (France)
News

PNA Plans Cherbourg Port Expansion (France)

France’s Ports of Normandy Authority (PNA) is planning to harness the power of the sea, reports NewNet. Since the port of Cherbourg is located close to the Raz Blanchard, which is known for strong currents, this makes it ideal for tidal energy development. To be able to install tidal generators, the

about 14 years ago
The Netherlands: Boskalis Secures Funds to Buy Dockwise Shares
News

The Netherlands: Boskalis Secures Funds to Buy Dockwise Shares

With reference to the press release of 21 December 2012 in which Boskalis announced its decision to make an all cash voluntary public offer for all the issued and outstanding ordinary shares of Dockwise at a price of EUR 18.50 per share cum dividend (the Offer), Boskalis hereby confirms that it has

about 14 years ago
Prolec System Effective in Dredging Application (Germany)
News

Prolec System Effective in Dredging Application (Germany)

Prolec has recently supplied its Digmaster Pro system to the German Federal Waterways and Shipping Administration during an upgrade of its workboat fleet. The German inland waterway network stretches for around 7300 km. Larger rivers have been canalised, allowing large ships to navigate them. Not su

about 14 years ago

Advertisement

Gloucester’s Canal Dredging – Great Results (UK)
News

Gloucester’s Canal Dredging – Great Results (UK)

In a recently completed dredging project at Gloucester Docks and the nearby canal, almost 9,000 cubic metres of silt have been removed from the mentioned area. The operation, which was run by the Canal & River Trust, was undertaken by utilising the dredger Serendipity. The dredging program has left

about 14 years ago
Dredging on Leicester Line Sheduled for Next Week (UK)
News

Dredging on Leicester Line Sheduled for Next Week (UK)

Over the Christmas period a section of embankment on the Grand Union Canal Leicester Line near the village of Foxton slipped into the water and blocked approximately 60 metres of canal to passing boats. Canal and River Trust is carrying out investigations to find out the exact cause of this slippage

about 14 years ago
France: Bids Invited for Repair Works on Dredger “Cap Croisette”
News

France: Bids Invited for Repair Works on Dredger “Cap Croisette”

The Languedoc-Roussillon Region has invited bidders for the provision of technical solutions for the repairs and maintenance services of the trailing suction hopper dredger “Cap Croisette”, located at the Port of Sète. This program includes the draining of the machine, refits, painting and metal wor

about 14 years ago
Poland: Officials Seek Bids for Port of Gdynia Reconstruction
News

Poland: Officials Seek Bids for Port of Gdynia Reconstruction

Zarzad Morskiego Portu Gdynia S.A. has announced tender for the reconstruction of the Port of Gdynia on the western part of the quay to make it possible to berth a Panamax vessel measuring 245m x 34.5 m x 12.7 m and 63000D WT.W. The project includes: – Reconstruction of hydraulic engineering constru

about 14 years ago