DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Operations & Maintenance

Loading filters...
Environment
Port Solent dredging starts in March
Operations & Maintenance

Port Solent dredging starts in March

ML (UK) Dredging Ltd – a family run business based in Portsmouth – will soon begin work on their next project, dredging of the Port Solent Approaches. According to the Queen’s Harbour Master Portsmouth, the start of this routine maintenance dredging project is set for the 1 March 2021. The works wil

about 5 years ago
Dredging included in the North West waterways project
Operations & Maintenance

Dredging included in the North West waterways project

Canal & River Trust will invest £15 million this winter in the North West, carrying out essential repairs, upgrades and maintenance work. As part of the four-month programme, which is due to finish in mid-March, the expert engineering teams are replacing worn-out lock gates, dredging waterways and c

about 5 years ago
Emergency repairs at West Beach
Operations & Maintenance

Emergency repairs at West Beach

Following recent storms, the isolated groyne (no.54) at West Beach Hayling Island has suffered irreparable damage and is posing a significant health and safety risk, informs the Coastal Partners. According to their report, this groyne is no longer effective at holding beach material, and will theref

about 5 years ago
Work to repair breached riverbank on the River Alt gets underway
Operations & Maintenance

Work to repair breached riverbank on the River Alt gets underway

The Environment Agency have begun work to fix a breached riverbank on the River Alt at Lunt meadows Nature Reserve and flood storage area in the latest phase of response to last month’s floods. The river burst its bank on 20 January during significant and severe rainfall caused by Storm Christoph wh

about 5 years ago
South Hayling Beach repairs underway
Operations & Maintenance

South Hayling Beach repairs underway

Following storm events over the Christmas and New Year period, the beach at Eastoke has significantly reduced in height and width, leading to reduced protection to coastal properties. After 10 days of work on site, a survey of the beach at Eastoke has calculated the need for additional shingle mater

about 5 years ago
Lydd Ranges scheme set for April
Operations & Maintenance

Lydd Ranges scheme set for April

The Environment Agency will this April begin works on the Lydd Ranges sea defence scheme. The plan is to improve the existing frontage and to maintain the sea defence along the existing alignment. Once completed it will help better protect this environmentally important area and the Ministry of Defe

about 5 years ago
Rosmorport hopper dredgers busy in Kaliningrad
Operations & Maintenance

Rosmorport hopper dredgers busy in Kaliningrad

Three modern and powerful dredgers of FSUE “Rosmorport” began dredging works in the Kaliningrad Sea Canal after a break caused by ice formations. According to Rosmorport, the dredgers engaged in the operations are Yuri Maslyukov, Severnaya Dvina and Beloye More. During the works, they will remove ar

about 5 years ago
Rohde Nielsen to resume beachfill operations in the West Coast of Jutland
Operations & Maintenance

Rohde Nielsen to resume beachfill operations in the West Coast of Jutland

In 2020 Rohde Nielsen A/S started working on the contract of beach nourishment of the West Coast of Jutland, Denmark. According to the company, this work is planned to extend over the 2020-2024. The scheme consisted of three separate projects, two of them being beach nourishment with sinkerlines whi

about 5 years ago
ML Dredging working in Rudmore Channel
Operations & Maintenance

ML Dredging working in Rudmore Channel

ML (UK) Dredging Ltd crew is getting ready for their next assignment, the maintenance dredging of Rudmore Channel. According to the Queen’s Harbour Master Portsmouth, this routine maintenance dredging project will take place in the Rudmore Channel located in the north east of Fountain Lake within Po

about 5 years ago
Work starts to improve Tilbury’s flood defences
Operations & Maintenance

Work starts to improve Tilbury’s flood defences

Construction work has started on an innovative scheme to improve Tilbury’s flood defences, informs the Environment Agency. In a project of national importance, the existing port lock gates will be replaced with pioneering dual function lock gates, and the EA’s tidal barrier will be removed. This is

about 5 years ago
Borr finishes dredging of the River Parrett
Operations & Maintenance

Borr finishes dredging of the River Parrett

Dredging of the River Parrett between Northmoor and the M5 finished last weekend, according to the Somerset Rivers Authority (SRA). “It’s gone well. Rain has kept river levels high, so the water injection dredging vessel Borr has been able to work 10-12 hours every day,” said SRA in the release. “Af

about 5 years ago
Piling continues on the Southsea scheme
Operations & Maintenance

Piling continues on the Southsea scheme

Wild weather last week slowed down Southsea Coastal Scheme piling progress as high winds limited the pitching of steel sheet piles. According to the project update, the weather conditions kept the working platform maintenance gang busy, ensuring the dredged platform wasn’t washed out to sea. The pro

about 5 years ago
More successful dredging projects for Rohde Nielsen
Operations & Maintenance

More successful dredging projects for Rohde Nielsen

In 2020 Rohde Nielsen A/S completed three exciting maintenance dredging projects in the Port of Esbjerg, Denmark. First out of three was the Project Grådyb. There, Rohde Nielsen removed around 230.000 m3 of non-contaminated dredged sediment from the fairway channel entrance leading to Port of Esbjer

about 5 years ago
JDN’s first 100% sustainable beach replenishment project in Belgium
Operations & Maintenance

JDN’s first 100% sustainable beach replenishment project in Belgium

Jan De Nul Group is the first dredging company to carry out 100% sustainable beach replenishments, announced JDN in the release. Moreover, this world first has taken place at the Belgian coast. From 1st February, Jan De Nul will deposit about 500,000 cubic metres of sand on the beach of Raversijde b

about 5 years ago
  • 1
  • …
  • 14
  • 15
  • 16
  • 17
  • 18