DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Draft Feasibility Report for Tilden Project Available for Review (USA)
Business & Finance

February 16, 2014 · about 12 years ago

Draft Feasibility Report for Tilden Project Available for Review (USA)

A draft feasibility report and environmental assessment for stream bank restoration near Tilden, Neb. is currently available for public review. The report identifies alternatives to provide stream bank protection and prohibit further rapid erosion on the right-descending bank of the Elkhorn River, M

1 minutes read
  • LinkedIn
  • X
  • Email

A draft feasibility report and environmental assessment for stream bank restoration near Tilden, Neb. is currently available for public review.

The report identifies alternatives to provide stream bank protection and prohibit further rapid erosion on the right-descending bank of the Elkhorn River, Madison County, Neb. Public infrastructure being protected includes the 536th Avenue county road bridge.

“The draft feasibility study report and environmental assessment is the result of a comprehensive study conducted by the Corps in cooperation with Madison County,” said Gwyn Jarrett, project manager . “ The study was carried out under Section 14 of the Flood Control Act of 1946, as amended.”

Section 14 provides the Corps with authority to study, adopt, and construct emergency stream bank and shoreline protection projects to protect public highways and bridges, other public works, and nonprofit public services such as churches, hospitals, and schools and other non-profit facilities offering public services.

Background

The Elkhorn River is a meandering stream with extremely flat gradients and very small channel capacities in relation to its drainage area. Rainfall in the spring often combines with annual plains snowmelt to produce floods that exceed the Elkhorn’s channel capacities and spread onto the broad flood plain.

Over the past decade, bank erosion and channel migration has occurred near Tilden, and in 2010, flooding caused the channel meander to move near its historic limit and threaten the roadway and roadway embankment.

[mappress]

Press Release, February 17, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Lyttelton Port gears up for its largest expansion project
  2. 2Isle of Palms wraps up first phase of beach renourishment
  3. 3Conneaut Harbor dredging kicks off
  4. 4BREAKING NEWS: Bahrain plans major land reclamation at Khalifa Port

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free