DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Burlington Flood Protection Plan on Display
Business & Finance

October 7, 2019 · about 7 years ago

Burlington Flood Protection Plan on Display

The U.S. Army Corps of Engineers, St. Paul District, has released a draft Supplemental Environmental Assessment for proposed alterations to the existing levee system, as well as constructing new flood risk reduction features in Burlington, North Dakota. There has been a history of flooding along the

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, St. Paul District, has released a draft Supplemental Environmental Assessment for proposed alterations to the existing levee system, as well as constructing new flood risk reduction features in Burlington, North Dakota.

There has been a history of flooding along the Souris River (also referred to as the Mouse River) in north-central North Dakota. In 2011, the flood of record occurred in the Souris River Basin, causing more than $1 billion in damages to homes, businesses, public facilities and infrastructure along the entire length of the Souris River.

The Souris River Joint Water Resource Board is pursuing a plan to reduce future flood risks throughout the U.S. portions of the Souris River Basin by constructing a series of new levees, floodwalls and other flood risk reduction features.

This plan has become known locally as the Mouse River Enhanced Flood Protection Project. The Corps of Engineers completed a final programmatic Environmental Impact Statement for the Mouse River plan in July 2017 and issued its Record of Decision on the project December 19, 2017.

Much of the information presented in the programmatic EIS is incorporated by reference in the draft Supplemental Environmental Assessment, while still addressing site-specific impacts resulting from the Burlington phase of the project, said USACE.

The comment period ends November 4, 2019.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Lyttelton Port gears up for its largest expansion project
  2. 2Isle of Palms wraps up first phase of beach renourishment
  3. 3Conneaut Harbor dredging kicks off
  4. 4BREAKING NEWS: Bahrain plans major land reclamation at Khalifa Port

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free