DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Dredging›Traders Cove Marina dredging on the way
Dredging

November 6, 2024 · about 1 year ago

Traders Cove Marina dredging on the way

The first phase of a dredging program at Brick Township’s Traders Cove Marina and Park is set to commence in early November and is expected to continue through December 31. This project, vital for maintaining safe and accessible waterways, involves removing accumulated sediment from the boat slips w

1 minutes read
  • LinkedIn
  • X
  • Email
Traders Cove Marina dredging on the way

Share this article

The first phase of a dredging program at Brick Township’s Traders Cove Marina and Park is set to commence in early November and is expected to continue through December 31.

This project, vital for maintaining safe and accessible waterways, involves removing accumulated sediment from the boat slips within the marina.

The dredged material will then be repurposed for marsh restoration and ecological enhancement at the adjacent Forsythe National Wildlife Refuge, making this effort both a practical and environmentally beneficial undertaking.

“ Dredging Traders Cove has become necessary due to the shallow depths that have developed over time. This project will ensure that Traders Cove remains navigable and safe for residents and visitors that use the marina ,” said Mayor Lisa Crate .

The project’s primary objective is to improve navigation by deepening the boat slips, achieving a dredging depth of approximately 3 feet below the channel surface, or 6 feet below the mean high-water mark.

A swinging ladder dredge will be utilized for channel dredging and a long-reach excavator on a barge will be used to remove material from within the Marina slips.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Dredging

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Swiss Army Knife of Great Lakes in Ashtabula
  2. 2Puerto de Sevilla completes Guadalquivir dredging
  3. 3McLaughlin & Harvey appointed to Dover' Project Contractor Framework
  4. 4Oceanside Harbor dredging wraps up

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free