Americas
USA: Dredging Plan for Kings Bay Entrance Channel Unveiled
U.S. Army Corps of Engineers has announced details about the maintenance dredging project at the Kings Bay Entrance Channel. Base work consists of maintenance dredging of Kings Bay Entrance Channel from Station 80+00 to Station 350+00 to a required depth of 49 feet. Option A consists of dredging sho
Conference Call on JAXPORT Deepening Study Set for December 3 (USA)
On Monday, Dec. 3, at 10 a.m. the public is invited to participate in the third and final bi-monthly conference call of the year regarding the Jacksonville Harbor Deepening Study. A schedule for 2013 conference calls is expected soon. About JAXPORT The vision of the Jacksonville Port Authority is to
USA: Great News for Western Destin Beach Restoration Project
Taylor Engineering will provide the City of Destin with construction administration and post-construction services for the Western Destin Beach Restoration Project. Construction administration tasks include conducting pre-construction meetings and reviewing contractor submittals, construction admini
USA: Taylor Engineering Selected to Restore FPL Dune
During the last week of October, 2012, the passage of Hurricane Sandy in the Atlantic Ocean, while well offshore of the St. Lucie Plant site, caused high seas and significant erosion of the protective dune along the shoreline of the FPL’s property. Specifically, the erosion destroyed a newly constru
Cape Charles’ Need for Deeper Channel Illustrates Funding Process (USA)
The color-coded depth maps of the navigation channel lined each the top of table – each map in front of a stakeholder who wanted the same thing as the person in the next seat. The Corps of Engineers map wasn’t necessary for Chad Saunders. He knew the depths. And he knew what was needed. “My [&hellip
Southampton Town Board OKs Beach Renourishment Projects (USA)
The Southampton Town Board approved a $24 million beach renourishment project for the ocean beaches of Water Mill, Bridgehampton and Sagaponack, according to 27east.com. This project was revived and fast-tracked following the damage to homes and beaches during Hurricane Sandy. With the project appro
USA: Taylor Engineering to Evaluate Feasibility of Lake Sperry Dredging
Taylor Engineering has assembled a team of dredging experts to provide the City of Dunedin with a cost-effective means to compile pertinent field data and regulatory information to evaluate the feasibility of dredging Lake Sperry and portions of Cedar Creek. The firm will provide professional engine
USA: RWSA to Seek Detailed South Fork Reservoir Dredging Proposal
The Rivanna Water and Sewer Authority will ask a Texas company for a detailed proposal to dredge the South Fork Reservoir. Albemarle Supervisor Ken Boyd and fellow RWSA members have heard from county residents who say dredging will enhance the reservoir as a source of recreation, reports wina.com. T
Taylor Engineering Supports Intracoastal Waterway Dredging Project (USA)
On behalf of the Florida Inland Navigation District, Taylor Engineering will support a proposed project that would deepen the Intracoastal Waterway in vicinity of Ponce de Leon Inlet in Volusia County and deposit the dredged material within the constructed MSA 434 dredged material management area fa
USA: Cupsogue Beach Receives New Sand
According to the New York State Department of Environmental Conservation (DEC), the Cupsogue Beach has received new sand. Around 130,000 cubic yards of sand, dredged from the Moriches Inlet, has already been placed at the mentioned area, stated Aphrodite Montalvo, the spokeswoman for the DEC. She ad
HaloSource, Enviroclin Bio Solutions Sign Important Agreement (USA)
HaloSource, the clean water technology company, has signed a supply agreement with Enviroclin Bio Solutions, a leading water solutions provider in Malaysia, to market and sell its unique HaloKlear(R) dry blend concentrates for water remediation application in Malaysia, Singapore, Thailand and Brunei
Ocean City to Vote on Beach Replenishment (USA)
The federal government is scheduled this winter to set up a dredge off the coast of Ocean City, lay underwater pipe and pump more than a million cubic yards of sand onto the island’s storm-ravaged beaches. The $10 million beach-widening project is also scheduled to stop somewhere between 14th and 17