Americas

Fox River Dredging Exceeds Goals for Its Fourth Season (USA)
News

Fox River Dredging Exceeds Goals for Its Fourth Season (USA)

The Fox River Cleanup Project exceeded dredging goals for its fourth season on the lower Fox River, reports greenbaypressgazette.com. Dredging and processing operations on the Fox River for the 2012 season started May 14 and concluded on November 12. Some details are as follows: – Estimated volume o

about 14 years ago
Mississippi River Barge Operators: Economy at Risk (USA)
Business & Finance

Mississippi River Barge Operators: Economy at Risk (USA)

The American Waterways Operators, National Waterways Conference, Waterways Council, Inc., and 15 other national organizations submitted a letter to President Obama and the Federal Emergency Management Agency requesting a presidential declaration of emergency and seeking “immediate assistance in aver

about 14 years ago
USA: WEDA Midwest Chapter Meeting Set for April 2013
Business & Finance

USA: WEDA Midwest Chapter Meeting Set for April 2013

Western Dredging Association has announced that the 2013 WEDA Midwest chapter meeting will be taking place in St. Louis, MO on April 17-19, 2013. The conference will be held at the HoteLumière hotel and casino on the bank of the Mississippi River. Participants and presenters are sought regarding bes

about 14 years ago
Sevenson’s Project Finalist for American Society of Civil Engineers Award
Business & Finance

Sevenson’s Project Finalist for American Society of Civil Engineers Award

Faced with a landfill nearing capacity, the Delaware Solid Waste Authority awarded a contract to Sevenson Environmental Services, Inc. of Niagara Falls to construct a mechanically stabilized earth berm that is being recognized for its innovative design. Sevenson was the prime contractor on the Cherr

about 14 years ago
USA: Narragansett Bay Dredging Plan Takes Shape
News

USA: Narragansett Bay Dredging Plan Takes Shape

The plan for the Little Narragansett Bay dredging project, as a very important venture, is slowly but surely taking shape despite the lack of funding. The proposed dredging program at the mentioned area includes removing 35,000 cubic yards of sand and 50,000 cubic yards of the silt, according to the

about 14 years ago
BAE Systems Lays Keel for GLDD Dump Scow (USA)
News

BAE Systems Lays Keel for GLDD Dump Scow (USA)

BAE Systems Southeast Shipyard Alabama LLC in Mobile yesterday had a keel-laying ceremony for the first of two dump scows to be built for Great Lakes Dredge & Dock Co, according to al.com. When complete, the entire first vessel will weigh about 1,600 tons and measure 295 feet long and 62 feet wide,

about 14 years ago
Emerald Isle Beach Replenishment Set for Next Year (USA)
News

Emerald Isle Beach Replenishment Set for Next Year (USA)

The Emerald Isle and Pine Knoll Shores beach replenishment program is scheduled for the beginning of the next year, reports jdnews.com. This project will include pumping of approximately 913,000 cubic yards of fresh sand, dredged from the Morehead City harbor channel, onto the beaches at the mention

about 14 years ago
Construction of Dredged Material Management Area IR-2 Kicks Off (USA)
News

Construction of Dredged Material Management Area IR-2 Kicks Off (USA)

The U. S. Army Corps of Engineers has begun construction of Dredged Material Management Area IR-2 on Navigation District property in Sebastian. Construction will be completed around December 31, 2012. Only 70 acres of the site will be developed to environmentally manage sands and silts from the main

about 14 years ago
USA: Dania Cutoff Canal Deepening Begins
News

USA: Dania Cutoff Canal Deepening Begins

The Florida Inland Navigation District and partners, the City of Dania Beach, Broward County and Port Everglades, announce project commencement on the Dania Cutoff Canal Deepening Project. The project will increase navigation depths within the canal to facilitate increased megayacht service and repa

about 14 years ago
Esri, QPS Strengthen Partnership (USA)
Business & Finance

Esri, QPS Strengthen Partnership (USA)

Quality Positioning Services (QPS) has signed an original equipment manufacturer (OEM) agreement with Esri, the world leader in GIS technology. The agreement enables QPS to bundle its QINSy and Fledermaus products with Esri software and provide a complete hydrographic survey, data management, and ch

about 14 years ago
Settlement on Cowbone Marsh Dredging Reached (USA)
News

Settlement on Cowbone Marsh Dredging Reached (USA)

The Florida Fish and Wildlife Conservation Commission must pay $1.28 million in restoration costs in a settlement with the Environmental Protection Agency over the illegal dredging of Cowbone Marsh in Glades County, reports news-press.com. This agreement is part of a $3.4 million settlement of 17 we

about 14 years ago
USA: Hudson River Dredging Resumes in Spring 2013
Business & Finance

USA: Hudson River Dredging Resumes in Spring 2013

Phase 2 of the Hudson River dredging program began on May 9 and ended in mid-November 2012. Approximately 663,000 cubic yards of PCB-contaminated sediment was removed during this time. Since Phase 1, which began on May 15, 2009, approximately 1,309,000 cubic yards have been removed. Phase 2 of this

about 14 years ago