Americas

Chief of Engineer’s Report Approved for Jacksonville Harbor Navigational Study (USA)
News

Chief of Engineer’s Report Approved for Jacksonville Harbor Navigational Study (USA)

The U.S. Army Corps of Engineers announced that the Chief of Engineer’s Report has been approved and signed for the Jacksonville Harbor (Mile Point) Navigational Study. This approval is a critical step towards moving the project forward to Congress for authorization and appropriation of funding. “Th

about 14 years ago
USA: Pittsburgh District Remains Number One in River Monitoring Technology
Equipment

USA: Pittsburgh District Remains Number One in River Monitoring Technology

In 1976 the U.S. Army Corps of Engineers Pittsburgh District placed the first two Data Collection Platforms (DCPs) on the Ohio River at Martins Ferry, W.V., and Shadyside, Ohio. These DCPs were, and remain, vital to river operations as they provide information on parameters such as river level and p

about 14 years ago
EPA OKs Additional Field Work at Milford’s Superfund Site (USA)
News

EPA OKs Additional Field Work at Milford’s Superfund Site (USA)

EPA has approved additional field investigations requested by the General Electric Co. (GE) at the Fletcher’s Paint Works and Storage Facility Superfund Site in Milford, New Hampshire. GE’s contractor, Arcadis US Inc. began these investigations in April 2012. These activities will continue for appro

about 14 years ago
USA: Judge Denies Paper Company’s Request over Fox River Dredging
News

USA: Judge Denies Paper Company’s Request over Fox River Dredging

A federal judge in Green Bay denied a paper company’s request to delay his earlier order to resume dredging along the Fox River, according to WTAQ.com. NCR Corporation was ordered last week to immediately restart clean-up efforts after it halted the project last year and filed a lawsuit. The judge l

about 14 years ago
District Commission Approves Palm Beach Restoration Project (USA)
News

District Commission Approves Palm Beach Restoration Project (USA)

The Port of Palm Beach District Commission voted unanimously, Thursday, April 19, 2012 to approve a $26 million restoration project to Slip Number 3 at the Port of Palm Beach. This historic infrastructure improvement project includes expanding the Slip on the north side to increase the width of the

about 14 years ago
IMS Dredges: Strong Transition from 2011 to 2012 (USA)
News

IMS Dredges: Strong Transition from 2011 to 2012 (USA)

IMS Division of LWT, LLC reports its second best year on record for 2011. “Amidst increased global competition IMS sees continued repeat sales from buyers in North America, Central America, and Asia. It is nice to see clients on their third or fourth Versi-Dredge.” says Ryan Horton, IMS Global Sales

about 14 years ago
USA: Town of Evans Authorizes Contract for Marina Dredging
News

USA: Town of Evans Authorizes Contract for Marina Dredging

The Town of Evans has hired an excavating company to dredge the Sturgeon Point Marina, reports buffalonews.com. The Town Board authorized the contract at its meeting this week. Each winter and spring, the waves deposit sand and silt in the marina, forcing the town to dredge the boat basin before the

about 14 years ago
U.S. and State of Ohio Reach USD 5.5 Million Settlement over Ashtabula River
News

U.S. and State of Ohio Reach USD 5.5 Million Settlement over Ashtabula River

The Department of Justice and Ohio Attorney General have reached a proposed settlement of claims for injuries to natural resources caused by past releases and discharges of hazardous substances into the lower Ashtabula River and Harbor in northeast Ohio. The consent decree, valued at approximately $

about 14 years ago
USA: Sampling at R.G. Haley Cleanup Site Set for Next Week
News

USA: Sampling at R.G. Haley Cleanup Site Set for Next Week

Crews will begin collecting samples next week at the R.G. Haley cleanup site on the Bellingham waterfront as part of a comprehensive environmental investigation. Contractors will collect soil and groundwater samples, install wells, and perform a variety of tests. Sampling and analysis work will cont

about 14 years ago
Brazil: TCP Paranagua Modernization Underway
Equipment

Brazil: TCP Paranagua Modernization Underway

LIEBHERR Container Cranes Ltd. recently delivered two Ship-to-Shore Container Cranes to TCP Paranagua, Brazil. The container cranes have a waterside outreach of 52.50m., span of 18m. and landside backreach of 15.00m. Total lift height under spreader is 38m. S.W.L. is 65 Tonnes under Twin Lift Spread

about 14 years ago
USACE Addresses Missouri Clean Water Commission Concerns (USA)
News

USACE Addresses Missouri Clean Water Commission Concerns (USA)

Col. Anthony Hofmann, Commander and District Engineer of the U.S. Army Corps of Engineers Kansas City District addressed the members of the Missouri Clean Water Commission at their regularly scheduled meeting in Jefferson City, Mo. regarding the Jameson Island Unit Shallow Water Habitat Restoration

about 14 years ago
Brant Beach Replenishment Moves Ahead (USA)
News

Brant Beach Replenishment Moves Ahead (USA)

A spokesman for U.S. Army Corps of Engineers said that the beachfill project in the Brant Beach section of the township is halfway complete. This $16.7 million project started in March. The contractors will pump 1.2 million cubic yards of material on the 31st through 57th Street beaches. Stephen Roc

about 14 years ago