At its Monday, February 8, 2016, meeting, the Pacifica City Council approved a $450,000 for the repairs of the Beach Blvd. sea wall and promenade. The work that will be done is just to stabilize the area and will not fully restore it to its pre-disaster condition. “The cost to reconstruct the wall a
Work to protect homes from flooding in a County Durham village has been completed, according to the Durham County Council. This scheme will help to protect 50 properties which were affected by flooding during severe weather in 2012. The project was designed following an investigation into the floodi
Dredging Today brings you an overview of the most popular stories from the past week (February 8-14, 2016). Trailing Suction Hopper Dredger Named Charlock The naming ceremony of Charlock, Van den Herik’s new trailing suction hopper dredger, took place on February 6th in Harlingen. Subsea Tooling
Cutting of the first steel plate for the new 3.500 m3 trailing suction hopper dredger “Minerva” for DEME took place at MTG Dolphin in Varna, Bulgaria on February 4, 2016. The dredger will be built again in cooperation with Royal IHC, the company specialized in construction of efficient dredging and
Congressman Curt Clawson has announced that two major waterway projects are expected to start this year in Lee County. The Army Corps of Engineers has allocated $900,000 for the dredging of sections of the Gulf Intracoastal Waterway (often referred to as the Miserable Mile), the full amount requeste
The Eastern Solent Coastal Partnership (ESCP) is about to hold a drop in exhibition on new coastal defenses planned to be built at Milton Common in the summer 2016. The exhibition will take place on Thursday 18th February 2016, at the Moorings Way Infant School in Southsea, Hampshire. Milton Common
As part of its ongoing renourishment program, Maroochydore Beach will receive a significant amount of new sand very soon, according to Andrew Ryan, Executive Director – Infrastructure Services at Sunshine Coast Regional Council. Beginning from February 15, the Sunshine Coast Council will pump more t
Schleswig-Holstein’s state government has declared itself basically willing in the longer term to permit dredged material from the Port of Hamburg to be brought to the silt release area near buoy E3 in the North Sea. The cabinet decided this on 9 February 2016 in Malente. “There is urgent pressure f
The U.S. Army Corps of Engineers (USACE) Tuesday delivered to Congress its Fiscal Year 2016 (FY 2016) work plan for the Army Civil Works program just hours after the president released his proposed FY 17 budget. The proposed budget and work plan include a total of $64 million for Norfolk District ci
U.S. Senator Charles E. Schumer has announced that the Long Beach Island Dune Project Partnership Agreement (PPA), which is a legally binding agreement necessary to commence with a water resources project, has officially been approved by the Army Corps of Engineers. The necessary step to advance thi
Beacon Marine Construction, LLC., a Massachusetts based full service marine contractor, has completed a dredging and beach nourishment project in Osterville, MA. The project included removal of approximately 1000 CY of material from the Seapuit River and West Bay. The dredged material was then benef
Rose City Yacht Club in Portland, Oregon, recently took delivery and startup of a new 8-inch Badger Class dredge from Reserve, Louisiana-based DSC Dredge, LLC. The Badger dredge was a much-needed replacement for an older dredge the club had purchased used and had operated for more than 20 years. The
U.S. Senators David Vitter and Bill Cassidy, M.D. have applauded the U.S. Army Corps of Engineers Fiscal Year 2016 Work Plan that included increased funding for additional Louisiana projects and priorities. “Louisiana’s ports and waterways are at the core of our state’s economic prosperity, which is
The U.S. Army Corps of Engineers, Mobile District, will extend the public scoping comment period to February 29, 2016 for the General Reevaluation Report to determine the feasibility of widening and deepening the Mobile Harbor channel to its authorized dimensions based on the request of several diff