The Charleston Harbor Post 45 Deepening Project has received $1.3 million in funding for the Pre-construction Engineering and Design (PED) Phase of the project from the U.S. Army Corps of Engineers’ 2015 Work Plan’s additional allocations. This funding allows the PED phase to begin upon finalizing t
The Town of North Topsail Beach has completed its Phase Five Beach Restoration Project. Approximately 1.25 million cubic yards of sand was dredged from an offshore borrow source approximately ½ mile off the shores of Topsail Island. The dredged material was used to rebuild approximately 3.5 miles of
Congressman Robert Hurt, along with Congressmen G.K. Butterfield, Bob Goodlatte, Morgan Griffith and Markwayne Mullin, recently introduced the Supporting Home Owners Rights Enforcement (SHORE) Act, H.R. 2929. This legislation would amend the Federal Power Act to ensure that the Federal Energy Regula
More than 40,000 miles of California’s rivers and streams are currently threatened by pollution, according to a list of impaired waterways submitted by the state to the U.S. Environmental Protection Agency. Common impairments in lakes are due to mercury and other toxic metals in fish. High temperatu
Horizons Regional Council’s Sustainable Land Use Initiative (SLUI) will receive a total of $4.76 million from central government’s Hill Country Erosion Fund for the next four years. Administered by the Ministry of Primary Industries, the Hill Country Erosion Fund has $8.8 million available to local
Between April 2015 and March 2021, the government will invest £2.3 billion in more than 1,500 projects across England. The Department for Environment, Food and Rural Affairs (Defra) investment plan sets out how this commitment will transform flood and coastal erosion risk management over the coming
Dutch consultancy firms Witteveen+Bos and Grontmij have been commissioned to conduct an environmental impact assessment for the Bagan river multi-purpose restoration project in Myanmar. This project aims to improve the navigability of the Irrawaddy river near the historic city of Bagan, and to imple
In November 2010, the U.S. Army Corps of Engineers completed the Columbia River Channel Improvement Project to deepen the 110-mile Lower Columbia River navigation channel from -40 to -43 feet. The 20-year project cost $183 million and was a combined effort between the federal government, the States
The Palaszczuk Government has welcomed the UNESCO World Heritage Committee’s decision not to list the Great Barrier Reef as ‘in danger’. Speaking from Bonn, the Deputy Premier Jackie Trad said that the World Heritage Committee’s decision is a sensible one and acknowledgement of the Labor Government’
Tidal Lagoon Swansea Bay Plc will today begin the tendering process for three main operations and maintenance (O&M) contract packages to support the £1 billion Swansea Bay Tidal Lagoon. Having previously named General Electric and Andritz Hydro as preferred bidders to manage the operations and maint
Over 1400 hydro-engineers from all of the world have gathered at the 36th edition of the annual world congress of the International Association for Hydro-Environment Engineering and Research (IAHR) in the Hague, the Netherlands (June 28 – July 3). Bregje van Wesenbeeck from Deltares was a keynote sp
Governor Rick Scott has announced that Bay County was awarded $280,000 through Florida’s Defense Reinvestment and Infrastructure Grant Programs. The funding will be used to support and sustain Naval Support Activity Panama City and Tyndall Air Force Base, with its $2.6 billion in defense economic im
For more than a century, B.C.’s economy has been rooted in natural resources. Today, B.C. is Canada’s second-largest natural gas producing province. Shell, KOGAS, Mitsubishi and PetroChina are working together to design, build and operate the proposed LNG Canada project. The LNG Canada facility will
Repair work to the Bearskin Neck Stone Jetty in Rockport, Massachusetts, is now complete, announced the USACE’s New England District. The work on the $3.3 million project consisted of repairing the 540-foot-long jetty that was damaged during Hurricane Sandy. The Bearskin Neck Jetty is located at the