The Friday Harbour dredging project is progressing very well. Earl Rumm, the Geranium Corporation chair, stated: “This is going to be a benefit to the town, and the province. It’s going to bring thousands of jobs and millions of dollars to the area. We’ve worked with all the right people to make it
The U.S. Environmental Protection Agency finalized a plan to clean up contaminated soil and ground water at the Diaz Chemical Corporation Superfund site in Holley, New York. The soil and ground water are contaminated with volatile and semi-volatile organic compounds, which can cause serious damage t
The U.S. Environmental Protection Agency yesterday notified Enbridge that more work is needed in Michigan’s Kalamazoo River to clean up oil from the company’s pipeline spill in July 2010. EPA is proposing further action upstream of Ceresco Dam, upstream of the Battle Creek Dam (Mill Ponds area), and
BAE Systems has begun construction on the first of two dump scows for Great Lakes Dredge & Dock Company. Employees and executives from both companies gathered yesterday for a ceremony to mark the start of construction for the first module, which will weigh approximately 87 tons. When complete, the e
Deltares and Züblin Spezialtiefbau Ges.m.b.H have developed and successfully implemented pilot projects of a solution to seal groundwater leakages in the subsoil using biotechnology. This BioSealing solution is at the brink of a much wider introduction in the market. BioSealing is a solution for sea
Ships of Northern Fleet (NF) minesweeping task unit on Oct 1 returned to permanent basing sites. The unit was dispatched to the Gulf of Ob (Kara Sea) to search, detect, and dispose explosive objects. NF minesweeping task unit consisting of seagoing minesweeper Vladimir Gumanenko, hydrographic ship S
ACI’s 5th Optimising Port Development conference (24 and 25 October 2012, London, UK) will address the key challenges faced by modern ports and terminals in order to present an efficient and attractive option to the shipping lines. The meeting will explore terminal operations and appropriate expansi
U.S. Army Corps of Engineers released the Chief of Engineers’ Report for the “Mississippi River Gulf Outlet (MRGO) Ecosystem Restoration Feasibility Study” recommending construction of the restoration plan upon identification of a non-federal cost share sponsor. The Corps of Engineers worked diligen
G. K. Vasan, Indian Minister of Shipping, and Doris Bures, Austrian Federal Minister for Transport, have signed a Memorandum of Understanding (MoU) on Technology Cooperation in the Shipping and Ports Infrastructure. The Minister stated that the Realtime Kinematics (RTK) measurements of tides and cur
Premier Sean Chen yesterday directed the Ministry of Transportation and Communications (MOTC) to work with Taiwan International Ports Corporation (TIPC) in implementing a five-year plan to renovate commercial ports and harbors and coordinate cross-ministry efforts to contribute to this program. The
Durban residents say they will not give up their homes to make way for a multi-billion port expansion plan. Cardinal Wilfred Napier, chairman of the KwaZulu-Natal Inter-Religious Council, stated: “When a plan like this is presented to you under the pretence of following procedure, all groups need to
According to architect and urban planner Felino Palafox Jr, the only solution to Metro Manila’s perennial flood problem is land reclamation. During the Dredging and Land Reclamation 2012 Conference, Palafox made the suggestion: “The reclaiming a big portion of Manila Bay could reduce Metro Manila’s
North America Western Asia Holdings announced that it has entered a formal agreement with Iraq’s Ministry of Transportation and the General Company for the Ports of Iraq to modernize Maqal Port, a historic port located in Basra’s urban center on the Shatt al Arab waterway. As part of the agreement,
The National Farmers’ Union (NFU) claimed that the failure by the Environment Agency to regularly dredge rivers could be increasing the risk of flooding, BBC reports. After Wales endured one of its wettest summers on record, NFU urged the agency to resume full-time dredging. An Environment Agency Wa